Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • AUSIMM
    An Analysis of the Resistance and Airflow Characteristics of Mine Shafts

    During the 1950's there was a flurry of activity on the design of main ventilation shafts for mines. More recently, a new ana- lysis was commissioned in relation to the multi-shaft, nuclear wa

    Jan 1, 1988

  • AUSIMM
    Future Directions in Mine Contracting

    Australian contract mining as it is known today had its origins in the early-1980s. Before this time there were numerous examples of underground mine development, and specifically shaft sinking being

    Jan 1, 2002

  • AUSIMM
    The Implementation of Snowden's Reconciliation Software - A Case Study from Telfer

    By J Gotte, C Morley, J Froud

    Newcrest Mining LimitedÆs Telfer Mine is a world-class gold and copper producer, situated in the Great Sandy Desert, in the north west of Western Australia. The mine has a number of distinctive charac

    Jan 1, 2007

  • AUSIMM
    The Design, Installation and Commissioning of an Absorption Refrigeration System at Gwalia Gold Mine in Western Australia

    By J deVries, A Broodryk, P Kyselica, K McLean

    Gwalia gold mine is located close to the town of Leonora in the Goldfields region of Western Australia, some 830 km from Perth. The mine is wholly owned by St Barbara Ltd, an Australian Securities Exc

    Aug 31, 2015

  • AUSIMM
    Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western Australia

    By M Fitzgerald

    Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development

    Aug 22, 2011

  • AUSIMM
    Structural Integrity Evaluation Using Acoustic Emission Techniques

    By Harris RW

    Acoustic Emission structural integrity evaluation tests rely on the validity of the detected acoustic emission data and the ability of the practitioner to both analyse and interpret the data to make a

    Jan 1, 1991

  • AUSIMM
    Current Drilling and Blasting Practice in the 1100 Orebody-Mount Isa

    Mount Isa Mines Ltd. annually extracts 5.6 million tonnes of copper ore from the 1100 Orebody. All production is by longhole open stoping, with an increasing emphasis on pillar recovery. Drilling an

    Jan 1, 1988

  • AUSIMM
    A Geometallurgical Approach for Iron Ore Product Evaluation

    By B J. Beven, A Vatandoost, J Young, S Campbell-Hardwick

    The intrinsic value of iron ore depends on its physical and chemical characteristics. For example, silica and alumina are unwanted elements, downgrading iron grade and adversely affecting high tempera

    Sep 29, 2013

  • AUSIMM
    Empirical Evaluation of Factors Affecting Froth Stability in Copper Flotation

    By M Zanin, E Chan, D Xu

    An experimental design has been developed to investigate the relative influence of distinct pulp and environmental properties on froth stability in the flotation of a typical porphyry copper ore. In p

    Sep 1, 2014

  • AUSIMM
    Continuous Remote Emissions Monitoring – The Lynchpin for Air Quality Management

    By F I. Cox, D Peeler, T Bodisco

    "Diesel particulate matter (DPM), in particular, has been likened in a somewhat inflammatory manner to be the ‘next asbestos’.From the business change perspective, there are three areas holding the in

    Mar 24, 2014

  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    Improved sustainability through WHIMS Plant addition at Roy Hill

    By C Jenkins, J Jasper, Y Suryaputradinata, S Lozyk, M J. Hartmann

    The primary objective of mining companies is to function as a profitable business by delivering products that fit customer requirements in a safe and sustainable manner. Optimum resource utilisation i

    Nov 8, 2021

  • AUSIMM
    Detection of Underground Spontaneous Combustion of Coal With Surface-Based Radon Technique at Dartbrook Mine

    By N Winkelmann

    Underground coal heating is a significant hazard in some coal mines. The broad principles of how underground coal heatings occur is reasonably known, however the technique for locating the heatings in

    Jan 1, 2005

  • AUSIMM
    Detecting Sampling Biases in Metal Accounting

    By L Lachance, F Flament, D Leroux, S Gariépy

    The pervasiveness of poor sampling practices in and around mineral processing plants could seem intriguing in view of the various documented evidences both for causes and consequences. To this extent,

    Jul 29, 2014

  • AUSIMM
    Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic Dam

    By H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant

    "The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable

    Jun 15, 2016

  • AUSIMM
    Development of Drilling Stategy Using Geostatistics - A Case Study in Porphyry Copper Deposit

    By Kim YC

    An alternative development drilling strategy to the one currently in use at an open pit mine was investigated using geostatistics for a portion of the pit. The massive orebody, the 3-D nature of t

    Jan 1, 1986

  • AUSIMM
    A case study: how being ‘aware of now’ is making work safer at Telfer underground

    By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle

    Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper

    Mar 15, 2021

  • AUSIMM
    The Mining Geology and Grade Control Practices of the Batman Deposit, Mt Todd Project

    Mt Todd lies towards the south end of the Pine Creek Geosyncline, sandwiched between the Cullen Batholith and the Edith Falls Basin, in an area of regionally metamorphosed sandstones, siltstones and

    Jan 1, 1994

  • AUSIMM
    Prospects for Alternative Leaching System for Gold: A Review

    A survey of leaching systems for the dissolution of gold has been undertaken and their advantages and disadvantages evaluated both from their effectiveness at leaching and their compatibility with c

    Jan 1, 1982