Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improved Jarosite ProcessBy BTrubT M
In the roast-leach-electrolysis process for the production of zinc, iron contained in zinc concentrates is converted to zinc ferrite during roasting. At Canadian Electrolytic Zinc (CEZinc), the Outo
Jan 1, 1993
-
Post-mining Land Use Options in the Appalachian Coal Mining Region of the USABy J Skousen, C E. Zipper
"Prior to the 1950s in the USA, surface coalmines were generally left without any reclamation. As government regulations advanced, mine operators were required to backfill the area and plant grasses o
Jul 16, 2014
-
Modelling Cohesion and Adhesion of Wet, Sticky Iron Ores in Discrete Element Modelling for Material Handling ProcessesBy K Williams, T Donohue, W Chen, T Roessler, A Katterfeld
Wet sticky iron ore poses particular difficulties in every aspect of the material handling process. Material hang-ups in bins, pipes and chutes; carry-back and spillage due to insufficient belt cleani
Jul 13, 2015
-
Development of Inhibitors to Reduce the Spontaneous Heating Susceptibility of Indian CoalsBy R S. Sing, M D. Yadav, G Udaybhanu
This paper presents the results of the first part of a research project to study the effect of various inhibitors to reduce the spontaneous heating susceptibility of some highly susceptible Indian coa
Jan 1, 2005
-
The Operation and Application of Hunting's Airborne Thematic MapperBy Drury SA, Williams RD, Nind DC
The Airborne Thematic Mapper is an eleven channel digital scanner which acquires image data in the visible, near infra-red, short wave infra-red and thermal infra-red wave- lengths. A description o
Jan 1, 1986
-
The Evolution of Modern Canadian Shaft Sinking TechnologyThis paper deals with the evolution of Canadian shaft sinking technology over the last 15 years. Most, if not all, shaft excavation projects in Canada prior to 1990 were sunk using traditional benchin
Jan 1, 2002
-
Northside Storage Tunnel ProjectBy R J. Cuttler
In January 1998 Sydney Water Corporation formed an Alliance with construction contractor Transfield, and engineering consultants Connell Wagner and Montgomery Watson, to design and construct the North
Jan 1, 1999
-
Direct Estimation of Sampling Variance From Time Series Measurements ù Comparison to Variographic AnalysisBy M Paakkunainen
Sampling is often the most critical part in process analysis. When the mean of a continuous lot, such as a process stream within a given time interval, is estimated by calculating the mean of several
Jan 1, 2005
-
The Application of Rock Engineering Systems to Block Caving to Identify the Effective ParametersBy M Mohammad Khani
An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES
May 9, 2016
-
Heavy Medium Separation at Iscor's Sishen Iron-Ore-MineThe Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2
Jan 1, 1987
-
Cost-Benefit Comparisons of Ecological Risk Against Water Management Options in the Finniss River System, AustraliaQuantitative probabilistic ecological risk assessment has been used to evaluate the likely effect on fish diversity and abundance of filtered and bioavailable metals in streamwater affected by acid dr
Jan 1, 2003
-
Cap Rock Blasting Improvement at Worsley AluminaBy L Neems
In conjunction with Orica Explosives, Worsley Alumina have managed a program of continuous improvement to their cap rock blasting over the last two years. Blasting conditions are challenging because o
Jan 1, 1999
-
A Novel Approach to Estimate the Gap Between theáMiddle- and Short-Term PlansBy J Ortiz
In almost all copper mining companies, mine planning is done considering different time frames, leading to long-term (life-of-mine) (LOM), medium-term (first three years) and short-term (first year, m
Sep 26, 2011
-
Drill and Blast - A Necessary Evil Or?It is well documented that drill and blast outcomes affect the downstream mining processes of loading, hauling, crushing and grinding but it can also significantly impact on mine profitability via dil
Jan 1, 1999
-
Open Circuit Disc Balling At Hamersley's Dampieer Pelletizing PlantThe considerations which led to the decision to_ install discs at the Dampier Pellet Plant of Hamer ley Iron Pty. Ltd. are described. Initial testwork showed that the ore could be ground dry in ope
Jan 1, 1974
-
Energy to the Year 2001: A 1981 Perspective of Australia's Oil Exploration OutlookThere are still vast areas of Australia in which either the hydrocarbon potential has already been indicated but from which no hydrocarbons have been produced or else are completely untested. Despi
Jan 1, 1981
-
Computational Fluid Dynamics Modelling of Gas Flow Dynamics in Large Longwall Goaf AreasBy C Claassen, R Balusu
Computational fluid dynamics (CFD) models have been developed based upon field data collected from a longwall mine in New South Wales, Australia to study the behaviour of goaf gas flow in both active
Sep 26, 2011
-
Draw Control at Premier MineBy K Nesbitt
Draw control at Premier Mine is considered important to avoid conditions of isolated draw, which results in early waste ingress, compaction of the kimberlite ore and loss of ore reserves. The Premier
Jan 1, 2000
-
The Restructuring of Ranger - A Case Study or Necessity is the Mother of InventionBy S S Solomons
In 1991 the uranium spot market price dropped to approximately US$7/Ib U308, a historical low in real terms and the short-term outlook for the industry in the next five years was grim. At this time
Jan 1, 1994
-
Spontaneous Fire Risk Rating of a Colliery Proposed to be Developed by Short Wall Method of MiningBy Sen S. K, Banerjee D. D, Nandy D. K
It has been stressed that the intrinsic spon- taneous heating characteristics of a coal is not enough in predicting spontaneous fire risk of a mine. The influence of extraneous conditions created f
Jan 1, 1988