Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Modelling Blast Movement for Grade Control at an Open Cut Gold MineBy E J. Sellers, A Cocker
Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref
Aug 18, 2014
-
The Perseverance Gold Copper Deposit – A New Peak Mines ChallengeBy B Taylor
The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent
Aug 22, 2011
-
An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation PlantBy J Zhou
This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl
Sep 26, 2011
-
Integrated Optimisation of Grinding and Flotation CircuitsBy P Holtham, K C. Runge, E Tabosa
Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro
Sep 1, 2014
-
Comparative Life Cycle Impacts of Deep Ocean Minerals and Land-based CounterpartsBy B C. McLellan
The decline of ore grades on land, increasing demand and high prices for various minerals have led to an increased interest in mining the deep ocean sea floor. The potential deep ocean reserves are va
Nov 4, 2015
-
Drill hole spacing analysis for classification and cost optimisation – a critical review of techniquesBy J Levett, O Rondon, I Glacken
Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl
May 24, 2023
-
Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade"Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even
Mar 8, 2016
-
Volume and Structural Changes Occuring During the Isothermal and Non-Isothermal Reduction of High Grade Hematite PelletsBy Morrison AL
The volume changes occurring during the reduction by hydrogen of single, high-grade hematite pellets under isothermal and non- isothermal conditions were investigated using a time-lapse photographi
Jan 1, 1980
-
Situational 3D variography – determining the variogram in the context of geologyBy P Gleeson, J Coombes, P Suresh, T McLennan
The last 20 years have seen a dramatic rise in the use of 3D visualisation and modelling for geological data, but there has been relatively little effort to do the same for the variogram models that u
Sep 20, 2017
-
Legacy tailings dam closure with a bituminous geomembrane coverBy M Medina, J Alexander, R J. Longey
Capricorn Copper Pty Ltd (CCPL) are operating the Capricorn Copper Mine located at Gunpowder, Queensland. As current holder of the environmental authority for the site, CCPL have obligations to rehabi
Jul 1, 2021
-
A Practical and Rigorous Approach for Integrating Sustainability Principles into Decision-Making Processes at Minerals Processing OperationsBy D Tuazon, M Powell, M Ziemski, G D. Corder
Although mining companies have made broad corporate-level commitments to adopt sustainability, there continue to be problems when attempts are made to adopt higher-level sustainability aspirations and
Jul 10, 2012
-
An empirical system for primary and secondary support in US coalminesBy C Mark, Z Agioutantis
This paper presents an empirical design methodology that is based on successful US roof support systems using both primary and secondary support in coal mining entries and intersections. The recent na
Nov 29, 2022
-
Phase relationship of quaternary system FeO-Al2O3-SiO2-‘V2O3’ at 1873 K and its impact during melting of H-DRI for possible vanadium extractionBy A Vickerfält, J Huss, J Martinsson
The European Union has listed vanadium (V) as one of the critical raw materials for the transition to a future green society, as stated in the Critical Raw Material Act, written by Grohol and Veeh (20
Aug 21, 2024
-
Sintering and Smelting Mixed Lead Carbonate û Lead Sulphide Concentrates at Mt. Isa, QueenslandThe treatment of mixed lead carbonate and lead sulphide concentrates at Mount Isa presents a problem which is unique ,in the lead smelting world; a problem whose solution is far from simple, and is no
Jan 1, 1933
-
The effects of operational parameters on HydroFloat® performance in a metalliferous applicationBy A J. Morrison, K Demir, J Kohmuench, K Runge, C Evans
The Eriez HydroFloat® is a flotation device capable of recovering significantly coarser and lessliberated particles than is possible using a conventional mechanical flotation cell. Originally develope
Aug 24, 2022
-
New Insights into the Formation, Structural Development and Preservation of Iron Ore Deposits in the Northern Cape Province, South AfricaBy D J. Alchin
Most of South AfricaÆs high-grade iron ore resources are hosted within a fault-controlled structural basin in rocks of the Palaeoproterozoic Transvaal Supergroup in the Northern Cape Province of South
Jan 1, 2007
-
Fine Coal Flotation: A Mineral Processing ProblemFor some time fine coal (-0.5 mm) flot ation has been considered as a bulk flotation problem. Combinations of hydrocarbon oils and frothers have been used as surface active agents in coal flotation
Jan 1, 1978
-
Separation and enrichment of copper, nickel and cobalt from acidic leach solution of smelter slag using solvent extraction and selective precipitationBy K Haga, G Danha, A Shibayama, L L. Godirilwe
The hydrometallurgical separation and enrichment processes provide an effective way to selectively recover metals from relatively dilute multicomponent sulfuric acid leach solutions. The multicomponen
Aug 24, 2022
-
Dust Mitigation - Changing the ParadigmBy J Visser
Dust mitigation has long been seen as nothing more than managing a nuisance issue, but the reality is that poor dust management can lead to one or more of the following negative consequences: an incre
Aug 12, 2013
-
Support structure design for rock burst damage restraint initiated by a low-intensity seismic waveBy E Kabwe, M Karakus
Deep hard rock underground mines tend to experience high stress as such drives exhibit dynamic responses attributed to a rock burst variant (strainburst). This dynamic behaviour is difficult to predic
Nov 29, 2022