Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Underground Fire, Sealing and Subsequent Recovery of Liddell State Coal MineOn Monday, October 25th, 1971 at approximately 12.15 a.m. the night shift proceeding underground discovered smoke at No.1 and No-3 cut throughs on the eastern side of the belt heading and in close
Jan 1, 1972
-
The Resource Management Act 1991: Its Implementation in OtagoThe Resource Management Act has been in force now for approximately ten months. This Act, and the Crown Minerals Act which accompanied it, have substantially changed the manner by which mining operati
Jan 1, 1992
-
Using Dynamic Simulation Throughout a Process Plant's Life CycleUsing Dynamic Simulation Throughout a Process Plant's Life Cycle
Sep 13, 2010
-
Ventilation considerations and modelling of lithium battery fires inunderground miningBy C M. Stewart
Lithium battery electric powered vehicles and machines (BEVs) continue to gain traction inunderground mining use, with predictions they will dominate the underground light and heavy vehicle fleets for
Oct 12, 2022
-
Data analytics and machine learning methods applied to underground coalmine roof convergence dataBy I Canbulat, J Emery, L Yao and C Zhang
This paper documents a process of data analytics and machine learning applied to coalmine roof convergence data. It follows a publication documenting the formation of the database. For each set of ana
Nov 29, 2022
-
Management Technology for Optimising Production Rock Breakage ProcessesIt is no longer adequate in running mines and quarries to simply select the best equipment. Today's competitive international commodity markets demand superior efficiency. This requires efficie
Jan 1, 1995
-
Longwall Coal Cutting Machines the FutureBy Carthew J
For more than 30 years shearer loaders have been the most important winning machines for,longwall mining. While the machines of the first generation had a driving power of only 100 or so kW, the p
Jan 1, 1988
-
Recent advances in tailings testing methodsBy D J. Williams
The majority of surface tailings storage facilities continue to employ sub-aerial tailings slurry deposition. Surface TSFs are typically sized and operated in a way to minimise the initial capital cos
Jul 23, 2018
-
The McArthur River ProjectBy Kareise G. J, Leung K
The McArthur River (HYC) deposit, located in the Northern Territory of Australia, was discovered by Mt Isa Mines Limited geologists in 1955. It is one of the largest sedimentary stratiform zinc-lead
Jan 1, 1993
-
Recovering Iron and Zinc Values from Steel Plant Dusts with Simultaneous Destruction of Organic Wastes: The EnvIRONment ProcessBy Reilly L, Worner H. K
The EnvIRONment process has been developed to treat steel works dust and organic wastes simultaneously. A pelletised feed is fed into a special DC electric furnace, the pellets becoming immersed in
Jan 1, 1995
-
Practicalities of the use of fayalite slags for recovery of metals from urban wastesBy E Jak, J Chen, B Hogg, S Nikolic, S Nicol
The quantity of post-consumer ‘waste’ materials generated each year is rapidly increasing. These materials can contain significant quantities of critical metals and present an environmental challenge
Jun 19, 2024
-
Economic Investigations on Sub-Level Stoping with Consolidated RockfillBy Heidecks C
Sub-level stoping with consolidated rockfill is the main method for mining steep dipping baryte and fluorite veins in Germany. Drifting is fully mechanised using drill jumbos, LHD units and shotcret
Jan 1, 1995
-
Suspension Roasting of Pyrite and Copper ConcentrateBy Soma T
Pyrite and Cu-concentrate were roasted in vertically suspended state in an externally heated tube. Tubes of three different lengths of reaction zone were used for three different reaction times. R
Jan 1, 1980
-
Transforming Mining - A Framework for Dramatic Changes in PerformanceThe mining industry has been slow at adopting the latest management philosophies from other industry sectors, such as manufacturing, and in retrospect, with good cause. With the plethora of three-lett
Jan 1, 1998
-
Commitment, Compliance and Capacity - How Environmental, Safety, Security and Social Financial Issues Affect LendersÆ RiskBy G S. C Murray
Major mining projects are developed with the assistance of lending institutions who provide hundreds of millions of dollars in funding over several years, and of course expect those funds to be return
Jan 1, 2007
-
Longwall Face Outputs Present æState of the ArtÆ -- Alternative Future TrendsBy Duncan GR
Having passed through a number of previous phases the best longwall results in Australia have shown a significant increase in the last two years. The results expected from a longwall face can be es
Jan 1, 1988
-
Characteristics of Low Sulphidation Gold-Copper Systems in the South-West PacificBy Corbett GJ
Magmatic-related low sulphidation hydrothermal ore systems at plate margins exhibit distinct spatial and temporal zonations which can be used to aid mineral exploration and development. Low sulphidat
Jan 1, 1995
-
Effective Use of Mine Waste in the Design of a Residue Storage Facility, Pilbara Region, Western AustraliaBy A Wanninayake, E Novello, I Gillani
A residue storage facility (RSF) was designed to cater for Davidson Creek Area and Robertson Range Area operations under the FerrAus Pilbara iron ore development project in the Pilbara Region, Western
Aug 12, 2013
-
Fosterville Gold Mine Heated Leach ProcessBy M Binks
The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo
Aug 8, 2011
-
Rock-Drill Steel Problem in Australia, With Some Suggested Steps to Its SolutionFOR some time past keen interest has been shown in both America and South Africa in the mining drill-steel problem. This interest has extended to Australian mining fields, and Australian drill users,
Jan 1, 1923