Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of a Low-cost Instrument for Barometric Pressure Surveys

    By A S. Derrington

    High-accuracy, solid-state digital reference barometers have proven to be well suited to conducting underground barometric pressure surveys. The only problem is their expense; at least A$4000 each. Fo

    Aug 31, 2015

  • AUSIMM
    Geology – The Affirmative Case

    By D Kepert

    It is the role of the exploration geologist to create wealth through the discovery, delineation and characterisation of economic mineralisation. This requires a critical depth of geological understand

    Jul 13, 2015

  • AUSIMM
    Microanalytical Evaluations of the Savage River Old Tailings Dam, North-?west Tasmania

    By A Hughes, J Agius, T Ferguson, A Parbhakar-Fox, D Lester, L M. Jackson

    Management of historic tailings is a major challenge facing the mining industry and its regulators. However, through improved mineralogical and chemical characterisation of such materials the opportun

    Jul 27, 2015

  • AUSIMM
    Building Sustainability Into a Project

    Organisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti

    Jan 1, 2004

  • AUSIMM
    The Rotary Multi-Plate Valve as an Integrated Control System of a Longwall Roof Support

    An automatic control system of a longwall roof support is dis-cussed. Hydraulic automatic control systems for longwall roof support have not met all requirements for such systems. Utilization of stand

    Jan 1, 1985

  • AUSIMM
    Grade control and deleterious materials in polymetallic deposits

    By R J. Goldie

    The Monty Copper Gold Deposit is an ultra-high grade mine in Sandfire Resource’s Doolgunna region which was completely drilled out and developed within two years of commencing mine development. During

    Mar 22, 2022

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    Oxidative combustion law of water soaked coal under oxygen-lean condition

    By H Y. Niu

    The coal left in the goaf is easily submerged by groundwater damage. During the mining process of the underlying coal seam, it is necessary to drain the water in the overlying goaf. The coal sample is

    Oct 12, 2022

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    Multi-phase CFD modelling of spiral concentrator – Prediction of particle segregation and separation performance

    By R M. Yanamandra, M Kumar, S K. Tripathy, N Mangadoddy, P Sudikondala

    Spiral concentrators are one of the flowing film gravity concentration devices used to beneficiate coal and mineral ores. The aim of the current study is to understand the particulate flow and separat

    Aug 24, 2022

  • AUSIMM
    Optimal slope profiles for maximum mine pit-wall steepness in banded iron formation rocks

    By S Utili, A Agosti

    The Overall Slope Angle (OSA) of pitwalls plays a crucial role in the financial return of an open pit mine. In current practice, pitwall profiles are designed to be planar in cross-section within each

    Nov 29, 2022

  • AUSIMM
    A Simplified Creep Analysis for Low Strength Seams in Rock Pillars

    By M Habte

    This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a

    Mar 8, 2011

  • AUSIMM
    Simulation Modelling of Grade Variability for Iron Ore Mining, Crushing, Stockpiling and Ship Loading Operations

    By K Jupp, T J. Howard

    Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia, about 50 km north of the town of Southern Cross. Ore is trucked from three geographical

    Jan 1, 2009

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    Risk Assessment Models for Post-Mining Land Use

    By C Smith, R I. Maczkowiack, P D. Erskine

    Open cut coal-mining has been conducted in the Bowen Basin region of central Queensland for almost five decades, and has disturbed an estimated area of 140 000 ha of agricultural land until 2011. Appr

    Jul 10, 2012

  • AUSIMM
    Improving stope extraction in the Hidden Secret orebody at Mt Charlotte Gold Mine

    By B Lance, D O’Brien

    The Hidden Secret ore body is located within the Mt Charlotte underground mining system in Kalgoorlie, Western Australia. Mineralisation of the Hidden Secret ore body is lode style and therefore diffe

    Mar 15, 2021

  • AUSIMM
    Backfill: An Integral Component of Mine Production

    By D Morrison

    Backfill is usually considered a necessary evil that contributes little to the principal objective of the operation, ore production. Consequently, it is relegated to an auxiliary role in the operation

    Jan 1, 1998

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • AUSIMM
    Numerical Modelling of an Outokumpu Flotation Cell

    By K Koskinen, S Ronkainen

    The flow field induced in an Outokumpu TankCell and by an OK rotor-stator mixing device in a laboratory and a process size flotation cell was modelled numerically using computational fluid dynamics (C

    Jan 1, 2005