    Managing Geotechnical Risk Through Non-Destructive Rock Reinforcement Testing Trialled at the George Fisher Mine, Mt Isa

    Corrosion affects the performance of rock support and reinforcement at various underground mines, including the George Fisher Mine, where recent studies showed that this risk to mining operations is g

    Nov 25, 2010

  • AUSIMM
    Reducing Crest Loss at Barrick Cowal Gold Mine

    By R Battison, R Duggan, S Esen, K Henley, P Dare-Bryan

    Increased catch bench crest loss has been observed in recent years at Barrick’s Cowal Gold Mine situated in central New South Wales, Australia. A project was initiated to diagnose the cause of the cre

    Aug 24, 2015

  • AUSIMM
    Flotation Testing of a Base Metal Ore From White's Orebody, Rum Jungle, N.T.

    The base metal ore from the hanging wall of White's orebody at Rum Jungle, N.T., is composed of copper and oth.er sulphides in a rock described as a phyllite,.which consists essentially of micace

    Jan 1, 1959

  • AUSIMM
    Tropicana - Unravelling the complexity of a +6 Million Ounce Gold Deposit Hosted in Granulite Facies Metamorphic Rocks

    By J Savage, A Crawford, M Doyle, N McNaughton, T G. Blenkinsop

    Area selection criteria for gold exploration have historically highlighted the low prospectivity of high-metamorphic grade terranes relative to regions with lower metamorphic grades. The Tropicana gol

    Sep 26, 2013

  • AUSIMM
    Presidential Address 1984 - There are Also Small Mines

    My roots span four generations. My great grandfather, Christian Frederick Fisher, along with twenty-one others was drowned in the New Australasian mine disaster at Creswick in Victoria in 1882. My gra

    Jan 1, 1984

  • AUSIMM
    Pre-concentration via waste rejection based on fragment size – Olympic Dam case study

    By K Ehrig, V Liebezeit, Y Li, B Pewkliang, M Smith, E Macmillan

    Pre-concentration of low grade ores via the rejection of low/no value materials based on fragment size is the subject of many published papers and studies over the past decade. However, the possibilit

    Nov 10, 2020

  • AUSIMM
    True Pipe Sampler – A Correct Design Utilising the Principle of Symmetry in Pressurised Slurry Particulate Streams

    By G J. Halstead, R C. Steinhaus

    The True Pipe® in-line sampler was developed in an attempt to address the need for a mechanically reliable and correctly designed sampler to suit one-dimensional pressurised slurry pipelines, often fo

    Jul 29, 2014

  • AUSIMM
    Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons Learnt

    By M Weeks

    Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen

    Mar 8, 2011

  • AUSIMM
    Northparkes Mines’ Current Air Blast Risk Assessment Practices for Block Caving Operations

    By C Vejrazka

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    May 9, 2016

  • AUSIMM
    Ventilation Planning Considerations when Dealing with Hot Groundwater

    By S Bluhm, L van den Berg

    In planning mine ventilation systems, heat issues are normally associated with deep-level mines where auto-compression and virgin rock temperatures play a major role. However, a number of mines suffer

    Aug 31, 2015

  • AUSIMM
    Fire Modelling in Underground Mines using Ventsim Visual VentFIRE Software

    By D J. Brake

    The risk from fire remains one of the most serious of underground mine disaster scenarios. The impacts of mine fires on the underground ventilation system and the production of toxic gases have been d

    Jul 1, 2013

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    Magnesium Alloy Production in China ù The Quay Magnesium Experience

    Quay Magnesium Limited (QMG) listed on the Australian Stock Exchange in late September 2004 having raised approximately A$30 million with the object of designing, constructing, commissioning and opera

    Jan 1, 2006

  • AUSIMM
    Future Direction of Mining Related Education in Australia: The Road to Success

    This talk was delivered in Kalgoorlie in April this year, to the Kalgoorlie Branch of The Institution of Engineers, Australia. We believe it is of such interest to members of our Institute and readers

    Jan 1, 1987

  • AUSIMM
    Real-time Mining – Moving Towards Continuous Process Management in Mineral Resource Extraction

    By N Jeannee, L Rattmann, M W. N Buxton, A deJong, K Nienhaus, A Soares, P Graham, A Korre, J Benndorf, D Buttgereit

    The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,

    Nov 4, 2015

  • AUSIMM
    Laboratory Flash Flotation Trends for a Variety of Gold Particles

    By T D. H McGrath, J P. Vaughan, J Heath, J J. Eksteen

    A reliable laboratory method to characterise the response of free gold particles when subjected to flash flotation conditions has been developed by AMIRA P420 researchers at Curtin University. This te

    Sep 26, 2013

  • AUSIMM
    The Flotation of Water-Soluble Minerals ù Peculiarities and New Technologies

    By V Novoselov, R Sabirov

    Flotation processing technology of water-soluble minerals has made it possible to realise, since the 1960s, the wide scale industrial processing of potash and potassium-magnesium ores (about 200 milli

    Jan 1, 2005

  • AUSIMM
    Improving Rehabilitation Outcomes using Biocrusts

    By S Doudle

    The Iluka Resources Ltd Jacinth-Ambrosia heavy mineral sand mine (South Australia) is located in an undisturbed semi-arid landscape consisting of sparse trees, shrubs and grasses. The soil interspaces

    Oct 5, 2011

  • AUSIMM
    Magnesium Sulfate Production ù First Value Added Salt From Saline Waters of the Murray Basin (Australia)

    By T Barto, D Thomson, T Norgate, C Doblin

    Collaboration between CSIRO Minerals and SunSalt Pty Ltd, a salt producing company located in rural Victoria, has resulted in a commercial process to recover magnesium sulfate (commonly called Epsom s

    Jan 1, 2004

  • AUSIMM
    Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation

    By C A. Myburgh, S Craig, K Deb

    In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen

    Nov 24, 2014