Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Institute of Metals Division - The Solubility of Copper in FerriteBy L. S. Darken, H. A. Wriedt
THE constitution diagram of the iron-copper system derived by Daniloff' exhibits, at the iron-rich end, phase fields similar to those of the iron-carbon diagram. At 1484° 1094°, and 850°C there a
Jan 1, 1961
-
The Neumann Bands in FerriteBy C. H. Mathewson
ABOUT fifty pages of Henry M. Howe's profound treatise, "The Metallography of Steel and Cast Iron," are devoted to twinning with special reference to the origin, nature and general significance o
Jan 1, 1928
-
-
Coal - A-C Power Distribution for Underground Mining (Mining Engineering, May 1960, pg 472)By W. B. Jamison
Man's material advance from one level of civilization to the next has involved the development of new, more useful tools and the utilization of energy greater than he alone could produce. These t
Jan 1, 1961
-
New York Paper - Effect of Cold-working and Rest on Resistance of Steel to Fatigue under Reversed Stress (with Discussion)By W. J. Putnam, H. F. Moore
THIS paper gives a preliminary summary of results of tests on the resistance to fatigue under reversed stresses of steel subjected to cold-working and of tests to determine the effect of rest on the e
Jan 1, 1920
-
Proceedings Of The One-Hundred And Thirteenth Meeting, ArizonaGENERAL COMMITTEE GERALD F. G. SHERMAN, Chairman. ARTHUR NOTMAN, Secretary. NORMAN CARMICHAEL, JOHN C. GREENWAY, W. L. CLARK, W. G. McBRIDE, B. BRITTON GOTTSBERGER, FOREST RUTHERFORD. General Co
Jan 12, 1916
-
Slag Control in the Making of Iron and Steel (4479ce07-d486-4fc0-985e-51feb7e7085f)By Sweetser, Ralph A
AT the fall meeting of the Iron and Steel Division, Oct. 4, 1934, in New York, a symposium was held on Slag Control in the Making of Iron and Steel. The chairman was J. H. Nead and the vice chairman,
Jan 1, 1935
-
Mine Scheduling Optimization With Mixed Integer Programming (129a69f5-7493-435a-99ec-e2192e5cc274)By M. E. Gershon
A mixed-integer formulation of the mine scheduling problem is discussed and applied for the purpose of optimizing both the mine production sequencing and the mill blending and processing problem simul
Jan 1, 1984
-
Officers Of AIME Sections Predominantly Petroleum In Membership (6f21f014-5b8a-4c52-8c0c-01707fc6d7df)[Appalachian Petroleum Section: James M. Kimbrough, chairman; John H. Adair, first vice-chairman; Walter L. Diddle, second vice-chairman; Byron M. Finch, secretary-treasurer. Balcones Section: Robe
Jan 1, 1961
-
New York Paper - The Copper Queen Mine, Arizona. (Discussion, 1056)By James Douglas
The Copper Queen mine was opened in 1880 by Messrs. Martin, Ballard & Reilly, and the first copper-furnace was blown-in on August 20th of that year. Prior to that summer nothing but prospect-work had
Jan 1, 1900
-
The Surface Decarbonization of Tool SteelBy J. V. Emmons
It has long been known that the outside skin of tool steel frequently exhibits properties widely different from the interior of the mass.
Jan 1, 1915
-
IndexJan 1, 1923
-
Open-Pit Equipment Selection And MaintenanceBy Bruce E. Grant, Thomas Jancic, Lawrence G. Dykers, Frank Buchella
Principal factors influencing equipment selection can be grouped into five basic categories: tonnage requirements, ore and waste; topography and property line considerations; ore control requirements;
Jan 12, 1973
-
Electrical Equipment For Processing PlantsBy Clark B. Risler, Walter E. Thomas
MILL planning must include electrical drives and a system to supply them. These should be considered at the time metallurgical and mechanical plans are being made. Because it is convenient, flexible,
Jan 5, 1957
-
Baltimore Paper - The Control of Silicon in Pig-IronBy William H. Morris
At the Glen Summit meeting, the question of controlling the silicon in pig-iron WAS raised; and as this has been deemed by most furnace-men for years past a matter of special difficulty, an account of
Jan 1, 1893
-
"Magnex” Pilot Plant Evaluation - A Dry Chemical Process for the Removal of Pyrite and Ash from CoalBy Duane N. Goens, Clifford R. Porter
A 91 kg/h (200 lb per hr) pilot plant was constructed according to "Magnex" design. A non-compliance eastern coal which would generate more than 0.85 kg of SO2 per GJ (2.0 lb of SO2 per million Btu) u
Jan 1, 1980
-
Papers - Gravitational Methods - Use of Astatized Pendulums for Gravity Measurements (T. P. 828, with discussion).By Gustaf Ising
For relative gravity measurements, the author in 1918 described an instrument1 of which the essential part consists of a highly astatized, standing pendulum turning about a horizontal elastic axis. Th
Jan 1, 1940
-
Geology - Iron Ore Deposits in the Mt. Wright-Lake Carheil Area, Quebec (MINING ENGINEERING, 1962, vol. 14, No. 9, p. 68)By D. L. Murphy
As the world's demand for iron ore increases and available sources are depleted, increasing attention will be centered on deposits in the Quebec and Labrador portions of the Labrador Trough. Impr
Jan 1, 1962
-
Corundum-A Vital Wartime AbrasiveBy Roland D. Parks
CORUNDUM, little publicized as an industrial abrasive, has, in its small way, contributed greatly to the production of many specialized items vital to our war program and to our allies. Optical elemen
Jan 1, 1945
-
Institute of Metals Division - Properties of Aluminum Powders And of Extrusions Produced From ThemBy F. V. Lenel, M. V. Rose, A. B. Backensto
WHEN aluminum-flake powders are compacted and hot pressed and the resulting compacts are extruded or hot forged, a group of materials with unique properties is obtained. Not only do they exhibit high
Jan 1, 1958