Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Geotechnical Risk Management to Prevent Coal Outburst in Room and Pillar Mining

    By Peter Zhang, Dan Neilans, Scott Peterson, Scott Wade, Joe Pugh, Ryan Mcgrady

    "A coal outburst is a severe safety hazard in room-and-pillar mining under deep cover. It is more likely to occur during pillar retreating. Multi-seam mining dramatically increases the risk of coal ou

    Jan 1, 2015

  • SME-ICGCM
    Influence of a Coal Mine Subsidence on An Adjacent Dam

    By Nengxiong Xu

    The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)

    Jan 1, 2013

  • SME-ICGCM
    Highwall Stability Implications from Longwall Mining at Broadmeadow Mine

    By Bob Coutts, Matt Martin, Dan Lynch, Dan Payne

    "The Broadmeadow punch longwall coal mine in Central Queensland Australia has experienced significant highwall movement associated with the effect of longwall subsidence when the longwalls approach th

    Jan 1, 2018

  • SME-ICGCM
    The Mechanical Property Of Coal Containing Gas (d5aeba01-a0db-4f86-a21e-adbcc6290eab)

    By Yao Yuping

    The strength and deformation of more than two hundred coal samples have been tested in the condition of triaxial compression. The regression equation showing the relationship between coal strength and

    Jan 1, 1992

  • SME-ICGCM
    Development of a Numerical Model for the Approximation of Stress Distribution for a Single Vertical Backfilled Stope

    By Christopher Newman, Zach Agioutantis, Gabriel S. Esterhuizen

    "As conventional underground deposits are continuing to be depleted, mining operations have been forced to produce at greater depths and in more geologically and geometrically challenging conditions.

    Jan 1, 2018

  • SME-ICGCM
    Characterization Of Overburden Response To Longwall Mining In The Western United States

    By Khamis Y. Haramy

    The U.S. Bureau of Mines installed surface and subsurface instruments at a mine site in Colorado to monitor and characterize the overburden response to longwall mining. Instrumentation included a time

    Jan 1, 1992

  • SME-ICGCM
    Support Resistance And Roof Behaviour Of A Longwall Face With 4-Leg Shields

    By S. S. Peng

    The hydraulic powered supports have been employed in U. S. longwall mining for the past two decades. Yet the sciences of roof control at the powered supported faces remain largely unknown. In order to

    Jan 1, 1982

  • SME-ICGCM
    Measurement Of Structural Deformation And Tilt During Subsidence

    By Revendra Awasthi

    The application of a horizontal inclinometer and a tiltmeter to measure tilt, curvature, and deformations of shallow footings during mine subsidence is described. The measurements were taken during mi

    Jan 1, 1990

  • SME-ICGCM
    The Use of the Area of Main Influence to Fix a Relevant Boundary for Mining Damages in Germany

    By Denise Mueller, Axel Preusse

    "In 2010, the fracking discussion in Germany caused a number of changes in German law, which came into force in 2016. Especially the production of gas had to be regulated. With the legislation amendme

    Jan 1, 2017

  • SME-ICGCM
    Introduction of a Measurement Based Ground Control Management System to a Deep Level Potash Mine

    By Alexandra Garcia

    A measurement-based ground control management system, commonly employed in coal mines, has been successfully implemented in a UK potash mine operating at a depth of over 800 m. This system includes th

    Jan 1, 2014

  • SME-ICGCM
    Application Of RMT's Remote Reading Telltale System To Monitor Roof Movement During Face Retreat At West Colliery, Germany

    By David Bigby

    Rock Mechanics Technology has developed an intrinsically safe remote reading telltale system which allows up to 4 sets of 100 dual height, water diverting telltales in a mine roadway to be remotely mo

    Jan 1, 2003

  • SME-ICGCM
    The Implementation of Rock Mechanics Into a Multiple Level Limestone Mine

    By David A. Newman

    In the 1950s, an underground limestone mine in the Camp Nelson Formation was developed from an outcrop exposure. The Camp Nelson Limestone met the requirements for DOT stone and aggregate. The mine

    Jan 1, 2014

  • SME-ICGCM
    Measurement of Effects of Interaction and Influence on Mine Layout Design at Maltby Colliery

    By J. S. Oram

    Maltby Colliery, operated by RJB Mining (UK) Ltd is successfully mining the Parkgate seam in Yorkshire at a depth of 1000m using longwall retreat. Extraction in the Parkgate seam is influenced by inte

    Jan 1, 1997

  • SME-ICGCM
    Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining

    By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes

    "Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results

    Jan 1, 2010

  • SME-ICGCM
    Rib Access Boom for a Roof Bolter

    By Joe McQuerrey, William Kendall, Gene Wilson

    "Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.

    Jan 1, 2010

  • SME-ICGCM
    Determination of the Optimum Crown Pillar Thickness between Open Pit and Block Caving

    By Kourosh Shahriar, Kazem Oraee, Ezzeddin Bakhtavar

    "In this paper, a relationship between dependant parameters and the crown pillar thickness is first introduced. This relationship defines geotechnical problems caused by thin pillars and economic cons

    Jan 1, 2010

  • SME-ICGCM
    Entry Design For Optimum Stability In A Multi-Seam Environment

    By Mohummad Akram

    Statistical analysis of multi-seam mining case studies demonstrated that geologic structure and lithological type and sequencing were predominant factors in entry failures. Finite element analysis was

    Jan 1, 1993

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997

  • SME-ICGCM
    Analysis of Roof Falls at and Recommendation of Roof Control Plansfor Rofomex Posphate Mine

    By Jinsheng Chen

    For underground openings, many factors can cause roof failure and thus roof falls. The most common factors related to Mother Nature are weak roof lithology, geological structures, and an abnormal in-s

    Jan 1, 2011