Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    A Simple Method of Determining Site-Specific Safe Decking Procedures in Order to Avoid Dynamic Pressure Issues When Decking

    By Neal Lee, Braden T. Lusk, Brendan McCray

    Determining the minimum amount of inert material that can be used between explosive columns is a complex problem. Using too little inert material can result in detonator/primer failure, either by symp

    Jan 1, 2016

  • ISEE
    Deep water excavation with shaped charges: a case history in Lake Mead, Boulder City, Nevada, USA

    By Roberto Folchi, Hans Wallin

    Lake Mead, the largest man-made reservoir in the United States, is located about 30 miles southeast of Las Vegas, Nevada. For the construction of Lake Mead third water intake, which is entirely placed

    Jan 1, 2012

  • ISEE
    Subdrill – The Underutilised Blasting Parameter

    By Stephen Mansfield

    In metalliferous mining operations, subdrill is that portion of the blast hole that is drilled below the target grade elevation, and in most cases loaded with explosives. Its primary aim is to enable

  • ISEE
    Quantifying Your Blast Fragmentation Using Split-Desktop

    By Kirstin Girdner, Tom BoBo, Brian Norton, John Kemeny

    Split Engineering is a truly customer oriented company dedicated to providing quantified fragmentation information of the highest integrity to enable process management and control. Technical decision

    Jan 1, 2000

  • ISEE
    Large Arena Test Simulator Using Small High Explosive Charges.

    By Paul Worsey, Larry Frost, Braden Lusk, Seok Bin Lim

    For certification of blast resistant windows, current tests consist of arena tests or large air gun tests. Arena tests involve the detonation of more than 1000 pounds of explosives with windows placed

    Jan 1, 2006

  • ISEE
    Blasting at the Highest Gold Mine in the World - Paper for the International Society of Explosives Engineers Meeting February, 2000

    By Leon del Valle, Joe Phillips

    First, I want to thank my co-author, Leon del Valle for his help and collaboration in the preparation of this paper, and also ORICA S.S. our explosive supplier and contractor at the Refugio mine site

    Jan 1, 2000

  • ISEE
    Prediction of Detonation Parameters (95f7a43f-745c-4ae7-ad4e-74c781870372)

    By P D. Katsabanis

    This chapter describes the principles for the derivation of the equations for a detonation wave. The importance of the equation of state for the detonation products is demonstrated and commonly used e

    Jan 1, 1991

  • ISEE
    Strategic Public Relations for Underground Conservatory at Tennessee Governor’s Residence

    By Jake Hutchison, Wade Hutchison

    The opposition to the project has risen as a result of some political pressures and from public perceptions about the project’s necessity and its impact on the neighborhood. As a result of this contro

    Jan 1, 2009

  • ISEE
    Gravois Bluffs: Review of a Successful Large-Scale Blast-Monitoring program.

    By David Weidner

    Public relations, regulatory compliance, determination and implementation of pre-blast inspections, and accurate blast monitoring data are all essential components when conducting blasting operations

    Jan 1, 2001

  • ISEE
    Journal: 100 Years / In The Circuit Court of the United States For The District Of Delaware United States of America, Petitioner vs E.I. DuPont De Nemours and Company and Others, Defendants July 13, 1907 Origin of the Conspiracy and the Various

    By Robert Hopler

    That some time in the year 1872 there was organized an association composed of practically all of the manufacturers of gunpowder and other high explosives in the United States, the members of which sa

    Jan 1, 2008

  • ISEE
    Drill and Blast Instrumentation for Troubleshooting Underground Up-Hole Stoping

    By Braden Lusk, Tristan Worsey, Nathan Rouse, Kyle Hall

    Loading explosives up hole has challenges that are typically not seen in down hole explosive loading. Most explosives applications are not up hole. Lack of experience and technology can cause signific

    Jan 1, 2018

  • ISEE
    Peculiarities of Drilling and Blasting in Underground Small-Scale Mines

    By Patricio Santis, Jacopo Seccatore

    Artisanal and Small-scale Mining (ASM) is a prominent activity in the extractive industry: considering only gold, it produces about 20% of world market supply. Despite this fact, ASM is generally asso

  • ISEE
    Surface Instabilities from Buried Explosions

    By Daniel P. Lathrop, Leslie C. Taylor, William L. Fourney

    Except when the target is on the surface, e.g. a tank track, the most important loading mechanism from a buried charge on a target above it is the impact of soil propelled at the target by the expandi

    Jan 1, 2009

  • ISEE
    Large Diameter and Deep Hole Presplitting Techniques for Safe Wall Stability

    By Sam Bang Jr, Rodney Burke

    As mining progresses in the West, the depth of material has increased, making highwall stability a major factor in safety and production. The Jim Bridger Coal Mine’has made highwall stability a priori

    Jan 1, 1998

  • ISEE
    Next Generation Laser Surveying Systems! Blast Design and Analysis Software

    By Steve Colbum

    LTl’s MapStar LPS (laser positioning system) utilize both tripod mounted and hand held reflectorless distance meters. These are eye safe, easy-to-use, and specifically designed to endure the harsh env

    Jan 1, 2000

  • ISEE
    Innovative Blasting Mine Life Extension at a Coal Mine in Australia

    By R. Bitmead, R Barker, A. Drake

    The opencut coal mine is located about 50 km west of Brisbane, the capital city of Queensland in Australia and produces about 140 000 tonnes per annum of high grade steaming coal utilising a small tea

    Jan 1, 2002

  • ISEE
    Controlled Underwater Blasting in Santos Port, Brazil

    By Paulo José Costa Couceiro Junior, Manuel Lopez Cano

    The biggest Port of Latin America - the Santos Port in São Paulo, Brazil - has been drilled and blasted by controlled underwater techniques in order to remove around 40,000 m3 (52,318 cubic yard) of r

    Jan 1, 2016

  • ISEE
    Demolition of the Milwaukee Railroad Trestle Pier, Lind, WA

    By William C. B. Gates

    Demolition blasting next to an active railroad can be very challenging because of track safety, blasting vibrations, potential track fouling by blast debris, and short work windows on a live track. Re

    Jan 1, 2016

  • ISEE
    Application of the Blast Fragmentation Models in a Sandstone Quarry

    By Türker Hüdaverdi, Özge Akyildiz

    "In this research, image analysis technique, Kuz-Ram and KCO Models were used to examineefficiency of the quarry blasts. Investigations were performed in Cendere region, Istanbul. As a firststep, imag

    Jan 1, 2016

  • ISEE
    Blasting Mitigation Measures Used to Control a Highwall Failure Risk

    By Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon

    Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The