Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Use of Post-Grouted Drilled Shafts in Coastal MississippiBy Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues
"Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual
Jan 1, 2015
-
Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro ProjectBy Peter A. Thompson, Richard E. Prust
"The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut
Jan 1, 2005
-
Real-Time Anchor Testing and Data ManagementBy Bora Okumusoglu, Devon K. V. Mothersille
"AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front
Jan 1, 2017
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
"The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica
Jan 1, 2017
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab
-
Lateral Load Tests on Step Tapered Bored Piles in Calcareous SandsBy Nabil F. Ismael, Mohamed El Deeb
"The behavior of laterally loaded step tapered bored piles in calcareous sand was examined by field tests. Lateral load tests were carried out on straight and step tapered bored piles 5.3 m long embed
Jan 1, 2005
-
Construction Of A Spillwall In The Columbia RiverBy Francis B. Gularte
The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw
Jan 1, 2010
-
Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)By Paul Suver
"The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c
Jan 1, 2017
-
State Of The Practice In Florida On Deep Foundation Installationinduced Ground Deformations And VibrationsBy Boo Hyun Nam, Berk Turkel, Luis G. Arboleda-Monsalve, Jorge E. Orozco-Herrera
Construction of buildings, roads, and traffic activities generate vibrations to urban infrastructure. The vibrations produced by construction activities have an impact on the soil through which they a
Oct 1, 2022
-
Prestressed Concrete Sheet Pile Retaining Wall to Support Railroad Embankment Widening Adjacent to a WetlandBy Abhijit R. Sheth, Craig M. Benedict, John Brun, Ara G. Mouradian
"Amtrak recently replaced the 1907-era bascule two-track bridge over the Niantic River between East Lyme and Waterford, Connecticut. The project included new approach embankments, with approximately 2
Jan 1, 2017
-
Heating And Cooling Structures With Steel Pile Foundations Closed Loop Standing Column Well TechnologyBy Paul Suver
The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing co
-
Stone Column Ground Improvement – A Trial in Silty SandsBy Ana Pereira, Naomi Norris, Donald Bruggers
The city of Christchurch, New Zealand is predominantly founded on alluvial sediments consisting of interbedded layers of loose to medium dense sand, soft to stiff silt and clay mixtures, and pockets o
Jan 1, 2019
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Doyle Drive – Extreme Pile InstallationBy Peter Faust
"The south access road to San Francisco’s Golden Gate Bridge, known as Doyle Drive or Presidio Parkway, needs to be replaced. Built in 1936, it is the primary highway and transit linkage through San F
Jan 1, 2012
-
Slurry Trench Design and Construction in Difficult ConditionsBy Peter Deming
"PART 2 OF 2 (CONTINUED FROM SUMMER 2006 EDITION) CONSTRUCTION ISSUES (cont’d) The Influence of Ground Conditions on Collapse Sand and gravel strata provide frictional resistance to support active ear
Jan 1, 2006
-
Observational and Numerical Evaluation of Defects in Deep Mixing Method Columns Used for LNG Process Train Structural Foundation Support (30cbb62b-9335-4a4e-8105-e672f3e82ba5)By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Edward C. Clukey
"Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility
Jan 1, 2017
-
Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation USING PRESSUREMETER TESTING IN SLOTTED SLEEVE CASINGBy Emad Farouz, Roger Failmezger
"The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos
Jan 1, 2007
-
Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)By Emad Farouz, Roger Failmezger
"The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos
Jan 1, 2007
-
Applications of Diaphragm Wall Technology for Deep Foundations and Permanent Underground Structures for the Transbay Transit Center and the Transbay DevelopmentsBy Mikael Calando, Thomas Joussellin
"San Francisco's rapid growth has caused the city to plan for the Transbay Transit Center Project, a visionary transportation and housing project, that will transform downtown San Francisco and the Sa
Jan 1, 2016
-
A Collaborative Approach To The Design And Delivery Of The Most Heavily Loaded Piles Ever Constructed In The UkBy Morris J. D, Baldwin Z., Wiltcher P. M
21 Moorfields is an oversite development in central London spanning Moorgate tube station. It required the installation of both the highest loaded bearing piles and the highest top loaded static pile