Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Metallurgical Accounting in the Northparkes Concentrator - A Case StudyBy R Morrison, R Dunn
In many mineral processing operations, the reported production figures for an accounting period may not make the best use of available data. While most of the mathematical approaches, such as check-in
Jan 1, 2007
-
Discrete Element Modelling of Blast Fragmentation of a Mortar CylinderBy D Johansson, C Yi
Blasting techniques are widely used to fragment rock masses into smaller pieces. Numerical modelling is an efficient method employed by many researchers in the blasting field. It is difficult for a co
Aug 24, 2015
-
High purity alumina and potash produced from feldsparBy D Connelly
High purity alumina (HPA) is a processed, premium non-metallurgical alumina product characterised by its purity level ie 99.99 per cent (4N) or 99.999 per cent (5N). The market price, application, and
Sep 1, 2024
-
Susceptibility and Gamma-Gamma Probe Measurements in Boreholes for Ore Boundary Determinations in LKAB's Iron Ore Mine in Malmberget, Northern SwedenLKAB operates two underground mines in Kiruna and Malmberget, Sweden. Blast furnace pellet is the main product and makes up 70 per cent of total production. The orebodies are hosted by 1910 - 1860 Ma
Jan 1, 2006
-
The Hydrogeochemical Characterisation of an Unsaturated Waste Rock Pile, Key Lake, Saskatchewan, CanadaBy L Smith, R Beckie
Controls on environmental loading from acid rock drainage (ARD) are not well understood in waste rock material. In particular, relationships between subsurface flow and the timing, duration, and inten
Jan 1, 2003
-
Presentation of the Presidents Award, 1976 to Elliott Sylvester Timothy O'DriscollADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. J. G. SYMONS) IN PRESENTING THE AWARD TO ELLIOTT SYLVESTER TIMOTHY O'DRISCOLLTim O'Driscoll comes from a mixture of Irish and Scottish stock. H
Jan 1, 1977
-
Improving Extraction Efficiency from Witwatersrand Gold Tailings using Flotation and Ultra-Fine Grinding of ConcentratesBy D Capstick, M B. Ebell
This paper describes the test work, process design, commissioning and operation of a processing system at the Ergo gold operation that improves the extraction efficiency from gold tailings material. T
Sep 26, 2013
-
Dynamic Displacements from a Blast-triggered Seismic EventBy D P. Blair
Various analysis techniques are used to determine the nature of a large seismic event that was triggered by a mass blast in an underground mine. This event was recorded by surface accelerometer arrays
Aug 24, 2015
-
The Implementation of Snowden's Reconciliation Software - A Case Study from TelferBy J Gotte, C Morley, J Froud
Newcrest Mining LimitedÆs Telfer Mine is a world-class gold and copper producer, situated in the Great Sandy Desert, in the north west of Western Australia. The mine has a number of distinctive charac
Jan 1, 2007
-
Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam DepositBy M K. Kapo, S C. Nzama
The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte
Aug 18, 2014
-
Looking for Fractures - Integrating Geochemistry with Hydrogeology to Find Inter-Aquifer Leakage above Dewatered or Collapsed Coal SeamsBy P Mulvey, M Stuckey
"Inter-aquifer leakage due to fractures caused by coal seam gas extractions or longwall mining is an important issue for both the gas and coal industries. Currently, predicting stress induced macro-po
Nov 26, 2013
-
Analysing impact forces and overcoming speed, heat and pressure issues in high capacity belt support applicationsBy C T. Portelli
Belt conveyor transfers are the most likely location for high wear rates and failures. Belt transfers are necessary to change the direction of conveyed material and will remain a part of belt conveyor
Sep 18, 2023
-
Shifting the comminution workload from the primary ball mill to TowerMill circuitBy H Ishikawa, R Halomoan, S Palaniandy
The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,
Aug 29, 2018
-
Supply chain approach to iron ore dust monitoring and remediation – Pilbara, WABy G Zhao, S Hapugoda, E R. Ramanaidou, P Hapugoda, Y Jin, G O’Brien
In 2021 the ports of Port Hedland and Dampier in the Pilbara Region of Western Australia handled 900 Mt of iron ore. This ore was produced in the Hamersley’s mines and transported by trains to the por
Sep 18, 2023
-
Cadia Expansion – The Impact of Installing High Pressure Grinding Rolls Prior to a Semi-autogenous Grinding MillBy D Engelhardt, G Lane
The Cadia mine has shifted from an open pit operation to the Cadia East underground panel cave. The resulting increase in milled tonnes, more competent ore and the decrease in fines production through
Sep 1, 2014
-
Blasting related indices as the key to underground blasting improvements in a challenging rock massBy J Jackson, E Sellers
Blasting related indices were developed to quantify variation in rock strength and structure for each stope, and for each lift of each stope, as part of a Mine to Mill study at an underground open sto
Oct 16, 2017
-
Sulfidisation-Acidification-Recycling-Thickening (SART) for Complex Gold OresBy A Hall, D Kratochvil, P Littlejohn
Economic recovery of gold from complex gold ores, including poly-metallic deposits, is impacted by the presence of cyanide-soluble base metals. These base metals can create both a metallurgical challe
Sep 26, 2013
-
Automated Production Data Collection and Reporting at a Large Open Pit MineBy T Mattiske
The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,
Jan 1, 2002
-
The Impact of Residence Time on Copper Recovery in Telfer Gold MineÆs Cyanide Recycling ProcessBy P Breuer, A Simons
The sulfidisation, acidification, recycle and thickening (SART) process is currently being used at NewcrestÆs Telfer Gold Mine to recover cyanide and copper from the cyanidation tails of the pyrite co
Sep 26, 2013
-
Kisoro-Kabale iron ore project in south-western Uganda – unlocking a new high-grade iron ore region for exploration and developmentBy B Vietnieks, N Widmer, L White, E Tata, J Natukunda, D C. Ilouga, J P. Tyler
The Republic of Uganda aims to exploit its’ significant, un-developed iron ore resources to supply the required raw material for developing its’ iron and steel industry across all the stages of the su
Sep 18, 2023