Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Metallurgical Accounting in the Northparkes Concentrator - A Case Study

    By R Morrison, R Dunn

    In many mineral processing operations, the reported production figures for an accounting period may not make the best use of available data. While most of the mathematical approaches, such as check-in

    Jan 1, 2007

  • AUSIMM
    Discrete Element Modelling of Blast Fragmentation of a Mortar Cylinder

    By D Johansson, C Yi

    Blasting techniques are widely used to fragment rock masses into smaller pieces. Numerical modelling is an efficient method employed by many researchers in the blasting field. It is difficult for a co

    Aug 24, 2015

  • AUSIMM
    High purity alumina and potash produced from feldspar

    By D Connelly

    High purity alumina (HPA) is a processed, premium non-metallurgical alumina product characterised by its purity level ie 99.99 per cent (4N) or 99.999 per cent (5N). The market price, application, and

    Sep 1, 2024

  • AUSIMM
    Susceptibility and Gamma-Gamma Probe Measurements in Boreholes for Ore Boundary Determinations in LKAB's Iron Ore Mine in Malmberget, Northern Sweden

    LKAB operates two underground mines in Kiruna and Malmberget, Sweden. Blast furnace pellet is the main product and makes up 70 per cent of total production. The orebodies are hosted by 1910 - 1860 Ma

    Jan 1, 2006

  • AUSIMM
    The Hydrogeochemical Characterisation of an Unsaturated Waste Rock Pile, Key Lake, Saskatchewan, Canada

    By L Smith, R Beckie

    Controls on environmental loading from acid rock drainage (ARD) are not well understood in waste rock material. In particular, relationships between subsurface flow and the timing, duration, and inten

    Jan 1, 2003

  • AUSIMM
    Presentation of the Presidents Award, 1976 to Elliott Sylvester Timothy O'Driscoll

    ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. J. G. SYMONS) IN PRESENTING THE AWARD TO ELLIOTT SYLVESTER TIMOTHY O'DRISCOLLTim O'Driscoll comes from a mixture of Irish and Scottish stock. H

    Jan 1, 1977

  • AUSIMM
    Improving Extraction Efficiency from Witwatersrand Gold Tailings using Flotation and Ultra-Fine Grinding of Concentrates

    By D Capstick, M B. Ebell

    This paper describes the test work, process design, commissioning and operation of a processing system at the Ergo gold operation that improves the extraction efficiency from gold tailings material. T

    Sep 26, 2013

  • AUSIMM
    Dynamic Displacements from a Blast-triggered Seismic Event

    By D P. Blair

    Various analysis techniques are used to determine the nature of a large seismic event that was triggered by a mass blast in an underground mine. This event was recorded by surface accelerometer arrays

    Aug 24, 2015

  • AUSIMM
    The Implementation of Snowden's Reconciliation Software - A Case Study from Telfer

    By J Gotte, C Morley, J Froud

    Newcrest Mining LimitedÆs Telfer Mine is a world-class gold and copper producer, situated in the Great Sandy Desert, in the north west of Western Australia. The mine has a number of distinctive charac

    Jan 1, 2007

  • AUSIMM
    Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam Deposit

    By M K. Kapo, S C. Nzama

    The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte

    Aug 18, 2014

  • AUSIMM
    Looking for Fractures - Integrating Geochemistry with Hydrogeology to Find Inter-Aquifer Leakage above Dewatered or Collapsed Coal Seams

    By P Mulvey, M Stuckey

    "Inter-aquifer leakage due to fractures caused by coal seam gas extractions or longwall mining is an important issue for both the gas and coal industries. Currently, predicting stress induced macro-po

    Nov 26, 2013

  • AUSIMM
    Analysing impact forces and overcoming speed, heat and pressure issues in high capacity belt support applications

    By C T. Portelli

    Belt conveyor transfers are the most likely location for high wear rates and failures. Belt transfers are necessary to change the direction of conveyed material and will remain a part of belt conveyor

    Sep 18, 2023

  • AUSIMM
    Shifting the comminution workload from the primary ball mill to TowerMill circuit

    By H Ishikawa, R Halomoan, S Palaniandy

    The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,

    Aug 29, 2018

  • AUSIMM
    Supply chain approach to iron ore dust monitoring and remediation – Pilbara, WA

    By G Zhao, S Hapugoda, E R. Ramanaidou, P Hapugoda, Y Jin, G O’Brien

    In 2021 the ports of Port Hedland and Dampier in the Pilbara Region of Western Australia handled 900 Mt of iron ore. This ore was produced in the Hamersley’s mines and transported by trains to the por

    Sep 18, 2023

  • AUSIMM
    Cadia Expansion – The Impact of Installing High Pressure Grinding Rolls Prior to a Semi-autogenous Grinding Mill

    By D Engelhardt, G Lane

    The Cadia mine has shifted from an open pit operation to the Cadia East underground panel cave. The resulting increase in milled tonnes, more competent ore and the decrease in fines production through

    Sep 1, 2014

  • AUSIMM
    Blasting related indices as the key to underground blasting improvements in a challenging rock mass

    By J Jackson, E Sellers

    Blasting related indices were developed to quantify variation in rock strength and structure for each stope, and for each lift of each stope, as part of a Mine to Mill study at an underground open sto

    Oct 16, 2017

  • AUSIMM
    Sulfidisation-Acidification-Recycling-Thickening (SART) for Complex Gold Ores

    By A Hall, D Kratochvil, P Littlejohn

    Economic recovery of gold from complex gold ores, including poly-metallic deposits, is impacted by the presence of cyanide-soluble base metals. These base metals can create both a metallurgical challe

    Sep 26, 2013

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • AUSIMM
    The Impact of Residence Time on Copper Recovery in Telfer Gold MineÆs Cyanide Recycling Process

    By P Breuer, A Simons

    The sulfidisation, acidification, recycle and thickening (SART) process is currently being used at NewcrestÆs Telfer Gold Mine to recover cyanide and copper from the cyanidation tails of the pyrite co

    Sep 26, 2013

  • AUSIMM
    Kisoro-Kabale iron ore project in south-western Uganda – unlocking a new high-grade iron ore region for exploration and development

    By B Vietnieks, N Widmer, L White, E Tata, J Natukunda, D C. Ilouga, J P. Tyler

    The Republic of Uganda aims to exploit its’ significant, un-developed iron ore resources to supply the required raw material for developing its’ iron and steel industry across all the stages of the su

    Sep 18, 2023