    Coal Mine Bumps: Case Histories of Analysis and Avoidance

    By David Newman

    In Eastern Kentucky, the Darby seam has had an extensive history of coal bumps and pillar bursts. The combination of high overburden, strong rock and coal, subjacent and superjacent mines, and retrea

    Jan 1, 2008

  • SME-ICGCM
    Cementitious Seal/Rock Interface Under Hydrostatic And Dynamic Loadings (28th International Conference on Ground Control in Mining)

    By Khaled Morsy

    Cementitious seals are made of foamed cements with strength ranging from 100 to 600 psi. These cementitious seals are usually used at locations where the seal will be subjected to some convergence, as

    Jan 1, 2009

  • SME-ICGCM
    Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock Bolts

    By Damon P. Vandermaat

    Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa

    Jan 1, 2012

  • SME-ICGCM
    Underground Movement Of Rock Mass And Stress Distribution Due To Multiple Mining

    By Victor V. Nazimko

    Multiple mining generates gob-interaction displacements. They redistribute stress m strata and obey laws of irreversibility thermodynamics. An irreversible state causes inhomogeneity of the stress dis

    Jan 1, 1996

  • SME-ICGCM
    Time Dependent Roof Deterioration At A Central Ohio Coal Mine (b0f3bbeb-91e8-4a62-8116-5f9e444a047e)

    By Ted Klemetti

    Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep

    Jan 1, 2009

  • SME-ICGCM
    Surface damage due to longwall mining - A case study

    By P. M. Lin

    A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t

    Jan 1, 1989

  • SME-ICGCM
    Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case Study

    By P. Tsang

    The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different

    Jan 1, 1989

  • SME-ICGCM
    Think Like a Roof Bolt ? Then Make It Scream ?

    By Greg Smith

    This paper documents the use of bench testing equipment developed to enhance the understanding of, and improve upon, common roof bolt support systems. Most roof bolt systems consist of components that

    Jan 1, 2012

  • SME-ICGCM
    Crinum Mine 15 Longwalls in Weak Roof What Did We Learn about Supporting the Ground?

    By Dan Payne

    The Crinum mine has recently completed workings in the southern area of the mine. Over the 10 years of longwall production 40 million tonnes have been extracted and the mine has experienced over 40 lo

    Jan 1, 2008

  • SME-ICGCM
    Determination Of Horizontal Stress Direction By Underground Mine Mapping (2f4eaf66-10ce-4f4d-9f7a-64c6c21e6400)

    By S. E. Phillipson

    Underground mine mapping is a critical component of understanding the controls on ground instability. Many relatively localized examples of ground failure are associated with geologic features, such

    Jan 1, 2009

  • SME-ICGCM
    Analysis Of The Initial Collapse Of The Overburden Over Longwall Panels Using Subsidence Data

    By Gennaro G. Marino

    Documented case histories of surface ground movements from mine subsidence were utilized to help determine when the initial collapse of the overburden occurred above longwall panels. By studying this

    Jan 1, 1988

  • SME-ICGCM
    Coal Mine Burst Prevention Controls

    By Anthony Iannacchione

    Coal mine bursts have represented a major hazard for U.S. mining operations for more than 90 years. During this time, many prevention controls have been developed and tested. This paper reviews 11 p

    Jan 1, 2008

  • SME-ICGCM
    Displacement Discontinuity Method For Three-Dimensional Stress Analysis Of Tabular Excavations In Non-Homogeneous Rock (ff6cd480-c238-4f06-bf11-52c054cbd2e8)

    By Leigh J. Wardle

    This paper describes a numerical method for calculating the three¬-dimensional stresses and displacements induced by tabular excavations in a rock mass consisting of parallel layers of distinct mater

    Jan 1, 1984

  • SME-ICGCM
    Roof Control Problems on Development and Longwall Gateroads at a South- western PA Coal Mine

    By T. P. Mucho

    Over the past several years, two types of roof control problems have been en- countered at Beth Energy's Eighty Four Complex mine in Southwestern Pennsylvania. These problems have been (1) poor r

    Jan 1, 1986

  • SME-ICGCM
    The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)

    By Anthony S. Spearing

    The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi

    Jan 1, 2009

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    Weightings And Water Inflows During Longwall Working

    By I. W. Farmer

    Weightings and water inflows into longwall workings often occur together, giving rise to discussions on their relative genesis. Case histories are introduced which indicate that most water inflows are

    Jan 1, 1996

  • SME-ICGCM
    Optimizing Secondary Tailgate Support Selection

    A model was developed to facilitate secondary tailgate support selection based on analysis of over 100 case studies, compiled from two different surveys of operating longwall coal mines in the United

    Jan 1, 1996

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007

  • SME-ICGCM
    Geomechanic Monitoring And Distributed Information Systems

    By G. I. Gritsko

    In this paper we consider the elements of a distributed information geomechanic monitoring system which is used in computerized mine planning and mining operations control. The automated system is a t

    Jan 1, 1996