Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Owner?s Manual on Contracting Strategies for Large Projects ? Introduction
By Faruk Oksuz
The owners of large infrastructure projects are challenged on how to implement sound engineering and construction contracting strategies that address their prime expectations: a quality job, on time a
Jan 1, 2008
-
Regulatory Changes Improve Alaska’s Mining Climate
By Steven C. Borell
For more than a decade, changes have occurred each year that have improved the regulatory and business climate for mining in Alaska. These changes have taken place during Republican and Democratic go
Jan 1, 2004
-
Statistical Evaluation Of The Effect Of Conditioning Time And Slurry Concentration On The Flotation Performance Of Siliceous Phosphate
By S. Al-Thyabat
Conditioning of flotation feed is an important prerequisite for efficient flotation. This process depends on parameters such as conditioning time, slurry concentration and slurry pH. The objective of
Jan 1, 2008
-
The application of vertically-mounted jet fans in ventilation shafts for a rail overbuild
By R. E. Ray
Compared to conventional fully ducted axial and centrifugal fan systems, jet fans can offer a number of advantages for control of smoke during fire emergencies and dilution of diesel engine exhaust pr
Jan 1, 2009
-
Masbate gold operation is site of first commercial heap leaching plant in Philippines
By Libby R. Ricafort, Victorio V. Pato, R. S. Pizarro
Introduction Atlas Consolidated Mining and Development Corp. (ACMDC) started gold production at its Masbate gold mine early in 1980. This involved an open-pit mine and a 3.5-k/d (3850-stpd) carbon-in
Jan 9, 1987
-
Ion Exchange Resins Tailored For Effective Recovery And Separation Of Rhenium, Molybdenum And Tungsten - Introduction
By M. Mikhaylenko
Rhenium, molybdenum and tungsten are the elements demanded by high-end technologies. These metals are found in process solutions in forms of their oxyanions: ReO4-, MoO42- and WO42-. The later two
Jan 1, 2012
-
Evinos-Mornos Tunnel – Greece Construction of a 30 Km Long Hydraulic Tunnel in Less Than Three Years Under the Most Adverse Geological Conditions
By Remo Grandori, Manfred Jaeger, Fabrizio Antonini, Luis Vigl
The EVINOS-MORNOS tunnel project with its 30 km of length is one of the longest hydraulic tunnel in the world realised with TBM method. The adverse geological conditions, the high cover and the sho
Jan 1, 1995
-
Dust Control for Coal Handling : Design Considerations and Solutions
By Henning E. Soderberg, Robert Brien, O&apos
Coal may be the answer to US energy problems, but it also has its drawbacks. If it is crushed, screened, dumped, or moved, the environmental engineer is faced with a dust problem. To control coal d
Jan 10, 1981
-
Geology And Geochemistry Of The Denali Prospect, Alaska
By Don Stevens
The Denali Prospect (147° 08' 20" W, 63° 08' 50" N) is located on the south flank of the Alaska Range in the Clearwater Mountains in south central Alaska. (See Figure 1). The mineralization
Jan 1, 1972
-
Dual Concentrate From The Egyptian Baritic Iron Ore
By F. Hassan, M. A. Arafa
At El-Gedida iron ore deposits there is a block of about 30million tons neglected due to its higher sulfur content due to the presence of barite gangue minerals. From this bluk by magnetic separation
Jan 1, 1999
-
2009 Permeation Test Results For Grouts Made With Ultrafine Cements
By Raymond W. Henn
The 30th annual short course ?Grouting Fundamentals and Current Practice? was held at the Colorado School of Mines, June 22-26, 2009. The field demonstration portion of the course was conducted June 2
Jan 1, 2009
-
Third Right Longwall Panel in Sunnyside's No. 1 Mine
By Lynn Huntsman
INTRODUCTION The Sunnyside mines of Kaiser Steel Corp. are lo¬cated on the west flank of the Book Cliff Range, a tongue of the Wasatch mountain range in Utah. The mines are 193.12 air km (120 air mil
Jan 1, 1982
-
Phased Approach to Stormwater Tunnel Rehabilitation
By Todd Wanless
This paper addresses the challenges experienced by the designer and three government agencies during implementation of major improvements for the Turkey Creek Tunnel in Kansas City, Kansas. The tunnel
Jan 1, 2008
-
Expert Control Of A High Altitude Crushing Plant
By M. Valdebenito, J. Rajala
An OCS Expert control system was implemented by Svedala Cisa at the Minera Maricunga Refugio Crush-Leach Operation near Copiapo, Chile. The purpose of the Expert system was to maximize production thr
Jan 1, 2002
-
Tellurium Resources In New Mexico
Tellurium (Te) is one of the least abundant elements in the crust and tends to form minerals associated with copper, lead, zinc and iron sulfide deposits. Today, most tellurium production comes from t
Feb 27, 2013
-
Terrorism and the Mining Industry
By A. Dale Wunderlich
Since Sept. 11, 2001, the author has been asked by several mining companies and mining publications to share some of his insights on how the terrorist attacks on the World Trade Center (WTC) and Penta
Jan 1, 2002
-
Recovery of Copper from Industrial Waste Solutions by Cementation Using a Rotating Fixed Bed of Stacked Steel Screens Mining, Metallurgy and Exploration (49f84ae3-0f8b-4994-9964-9738b8967d3e)
By G. H. Sedahmed, S. A. Nosier, M. H. Abdel-Aziz, A. A. Mubarak, M. A. El-Naggar, E. G. Abdel-Aziz
The performance of a rotating fixed bed reactor in recovering copper from industrial waste solutions by cementation is studied under various conditions. The rotating fixed bed is made of stacked woven
-
Recovery of Copper from Industrial Waste Solutions by Cementation Using a Rotating Fixed Bed of Stacked Steel Screens Mining, Metallurgy and Exploration
By G. H. Sedahmed, S. A. Nosier, M. H. Abdel-Aziz, A. A. Mubarak, M. A. El-Naggar, E. G. Abdel-Aziz
The performance of a rotating fixed bed reactor in recovering copper from industrial waste solutions by cementation is studied under various conditions. The rotating fixed bed is made of stacked woven
-
San Francisco?s Central Subway, Extending the Third Street Light Rail to Chinatown
By Matthew E. Fowler
The Central Subway will extend the recently completed 8.2-km long Third Street Light Rail line another 2.7 km north through the Union Square shopping district to Chinatown with a concourse-to-concours
Jan 1, 2008
-
An Analysis Of Subsidence Movements Associated With An Abandoned Shallow Room-And-Pillar Coal Mine
By Yoginder P.
ACKNOWLEDGEMENTS Authors sincerely appreciate the interest, cooperation and technical support of the coal company management and staff in conducting the study. Without their assistance this study
Jan 1, 1986