Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Molybdenum Flotation Practice - Cell Type Selection And Design Considerations

    Several of the larger copper projects recently built have included a molybdenum byproduct circuit as part of the overall project due to the favorable molybdenum market conditions and overall economic

    Feb 27, 2013

  • SME
    Current usage of continuous monitoring systems in coal mines discussed

    By Kevin G. Stricklin

    Introduction Continuous monitoring techniques have been used in the US and abroad for many years. A continuous miner has a monitor that measures methane and automatically gives a warning if the metha

    Jan 9, 1987

  • SME
    Methods For Preventing Decompression Of Soft Ground During Soft Ground Tunneling For The Paris Metro

    By J. Janin, J. F. Bougard

    Development of improved transportation networks in major urban centers has led more and more to underground construction, the only reasonable solution for decreasing surface traffic congestion. Excava

    Jan 1, 1974

  • SME
    Record Performance Of TBM In The 13.5 Km Amlach Tunnel, Austria

    By Hans Janzon, Ernst Buechi

    INTRODUCTION The headrace tunnel in Amlach is part of a hydro electric power scheme near the city of Lienz in south west Austria. The project is owned and developed by Tiroler Wasserkraftwerke AG,

    Jan 1, 1987

  • SME
    Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method

    By Paul H. Madsen, Victor S. Romero

    The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo

    Jan 1, 2001

  • SME
    Application Of Modern Technology In Today’s Limestone Quarry Operation

    By B. Moore, Y. J. Zhang

    In today’s competitive dimensional stone business environment, use of available technology is critical to achieve and maintain a competitive advantage. Awareness of improvements in diamond cutting tec

    Jan 1, 2004

  • SME
    Tunneling Success at Denver’s Platte to Park Hill Project is a Team Effort

    By William Gleason

    "The city of Denver, CO has experienced extreme growth in the past decade, with the population of the city topping more than 700,000 people in 2018. The current storm water drainage system was put in

    Jan 9, 2018

  • SME
    Prediction of Ground Vibration Induced Due to Single Hole Blast Using Explicit Dynamics Mining, Metallurgy and Exploration (5745d634-e632-4178-ad6f-441932595fe2)

    By R. K. Sinha, B. S. Choudhary, Desh Deepak, A. K. Mishra, Hemant Agrawal, Shankar Kumar

    There are several methods (empirical, statistical, and machine learning tools) to calculate blast-induced ground vibration. Still, due to complications in the blasting procedure, under varying blastin

  • SME
    Stability Prediction And Performance Of Highwall Steepening In Weak Rock

    By D. R. Brox, J. Levell

    The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit

    Jan 1, 2001

  • SME
    Technical Note - Borealis Project: A Fast-Track Approach to Mine Development

    By W. E. Coughlin, R. L. Faverty, F. H. Lightner

    Introduction The intent of this paper is to present the general strategy and method of implementation to achieve a "fast-track" mine development. The major objectives of a "fast-track" or rapid devel

    Jan 11, 1983

  • SME
    Case History of a Mixed Ground Microtunnel

    By D. Craig Camp

    conditions. The soils included 65 m of rock not exceeding an unconfined compressive strength (UCS) of 200 kgf/cm2, 130 meters of soft clay, silt, and sand not exceeding 30standard penetration test SPT

    Jan 1, 2001

  • SME
    The State of Mining Education;What Does the Future Hold for the Next Generation

    By John Marsden

    Despite the recent pullback in metal and mineral prices, and the associated market adjustments, the mining industry is still facing a serious issue with the declining availability of graduate expertis

  • SME
    Grouting and Segmental Linings—Proceed with Caution

    By Thomas Gregor, Brian Garrod

    As the popularity of precast concrete segmental linings for tunnels is growing in North America, some problems related to grouting of, and near, these linings are starting to appear. The installat

    Jan 1, 2005

  • SME
    Study on Strata Control Based on Pillar Stress and Surface Cracks in Shallow Multi-Seam Mining

    In order to ensure safe mining and reduce surface damage in shallow multiple-seam mining, the failure characteristics of interburden strata with different coal pillar offset distances between pillars

    Jul 28, 2020

  • SME
    Hydrogeologic Characterization and Mining Impact Analysis of a Low-Yield, Fractured Granite Mining, Metallurgy and Exploration (86a3e080-80de-4150-963a-4695a76dda43)

    By Michael Day, Paul Kos, Scott Brinton

    A hydrogeologic characterization and impact analysis was performed for a proposed quarry at the Hitch Rack Ranch located in the Little Turkey Creek watershed southwest of Colorado Springs, Colorado. C

  • SME
    Thermoanalytical Study On The Oxidation Of Sulfide Minerals At High Temperatures

    By S. E. Pérez-Fontes

    An experimental study on the oxidation of chalcopyrite (CuFeS2), pyrite (FeS2), covellite (CuS) and chalcocite (Cu2S) particles was conducted by means of differential scanning calorimetry (DSC) and th

    Jan 1, 2007

  • SME
    Strata mechanics of pillar mining at the Crandall Canyon Mine

    By W. G. Pariseau

    "The Crandall Canyon Mine (CCM) is located in the Wasatch coal field in central Utah. Extensive longwall mining at CCM preceded a decision to recover coal left in barrier pillars on each side of a set

    Jan 1, 2014

  • SME
    Earth Pressure Balance Tunneling In Canada

    By Laura McNally

    In 2006, McNally International Inc., in a joint venture partner-ship with Aecon Constructors, was the successful bidder on two York Region Tunnel Projects: the Bathurst Collector/Langstaff Trunk Sewer

    Jan 1, 2008

  • SME
    Ground Control Monitoring System In Leeville Underground Mine - Preprint 09-063

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,200 tons of ore per day with an average gold grade of 0.4 opt. The mine has a large horizontal extent of 2,500 f

    Jan 1, 2009

  • SME
    Exploration (692d4533-e846-4408-ba93-9ba3d3c0a995)

    By D. R. Wilburn

    The worldwide budget for non fuel mineral exploration was expected to increase by 27 percent in 2003 from the 2002 budget, according to the Metals Economics Group (MEG) of Halifax, Nova Scotia. The i

    Jan 1, 2004