Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Selecting and Using Large Walking Draglines for Deeper Overburden Stripping

    By N. B. Pundari

    Proper selection of large walking draglines, based on sound engineering principles and field experience, has not kept pace with the large capital expenditures needed to buy these stripping machines. T

    Jan 4, 1981

  • SME
    Sustainable Development Of Industrial Minerals From Mining To Manufacturing - Introduction - Preprint 09-080

    By J. E. Kogel

    Industrial minerals play a central and dual role in the sustainable development (SD) of natural resources. Over the past decade the mining industry has increasingly focused on sustainably extracting

    Jan 1, 2009

  • SME
    An Innovation In Machine Tunneling

    By J. Donovan Jacobs

    Many improvements in the art of underground excavation have appeared during the past two decades. These improvements have been both in methods and in machinery and have resulted in more economical con

    Jan 1, 1974

  • SME
    Comparison Of Oleate Adsorption At Calcite And Fluorite Surfaces: An In-Situ FT-NIR/IRS And MLRS Study

    By C. A. Young

    In-situ Fourier transform infrared/internal reflection spectroscopy (FT ?IR/IRS) has been extended to study oleate adsorption at a calcite surface. The birefringent and transmission limitations of cal

    Jan 1, 1993

  • SME
    Five To Be Honored By National Mining Hall of Fame

    The National Mining Hall of Fame will induct five mining greats on Saturday, Sept. 17, 2005 at the Museum Convention Center in Leadville, CO. The 18thAnnual National Mining Museum and Hall of Fame In

    Jan 1, 2005

  • SME
    Development of Goaf Gas Drainage and Inertisation Strategies in 1.0-km- and 3.0-km-Long Panels Mining, Metallurgy and Exploration (27165d8b-f427-4927-8508-acd36c940b9f)

    By Rao Balusu, Bharath Belle, Krishna Tanguturi

    A collaborative research project is undertaken by Anglo American Coal and CSIRO to develop appropriate strategies for gas and spontaneous combustion management of longer panels. Extensive computationa

  • SME
    Development of Goaf Gas Drainage and Inertisation Strategies in 1.0-km- and 3.0-km-Long Panels Mining, Metallurgy and Exploration

    By Rao Balusu, Bharath Belle, Krishna Tanguturi

    A collaborative research project is undertaken by Anglo American Coal and CSIRO to develop appropriate strategies for gas and spontaneous combustion management of longer panels. Extensive computationa

  • SME
    Investigation Of Exposures To Commercial Asbestos In Northeastern Minnesota Iron Miners Who Developed Mesothelioma

    By Wendy M. Brunner

    A 70% excess of mesothelioma, an asbestos-related cancer, has been reported among men in northeastern Minnesota, where iron mining has been the major industry. The Minnesota Department of Health has

    Jan 1, 2007

  • SME
    Mining and Sustainable Development at Red Dog

    By D. H. Horswill

    The Red Dog Mine is the world’s largest zinc mine. It is located 145 km (90 miles) north of the Arctic Circle in northwest Alaska on lands owned by the Inupiat Eskimo organization called the Northwest

    Jan 1, 2000

  • SME
    Selection, Design, And Procurement Of North America?s Largest Mixshield TBM For Portland, Oregon?s East Side Cso Tunnel

    By Christof Metzger

    This paper discusses the process utilized by the Kiewit?Bilfiger Berger Joint Venture (Contractor) to select, design, and procure the largest mixshield tunnel boring machine (TBM) ever implemented in

  • SME
    Dry Jigging Coal: Case History Performance - Preprint 09-052

    By R. Snoby

    Since its introduction in 2002, the modern air jig has processed a wide array of coals throughout the world. This paper explores the reasons and justifications for the installations and provides case

    Jan 1, 2009

  • SME
    Slurry Pump Design Features

    By George Wilson

    When pumping abrasive slurry mixtures, special attention must be given to pump design and construction. The second article in this two-part series describes some design features to consider when selec

    Jan 10, 1981

  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007

  • SME
    Steel Fiber Microsilica Shotcrete With Remote Controlled Equipment

    By Galyn Rippentropp, Finn Erik Overlie

    INTRODUCTION The wet shotcreting system utilizing steelfiber microsilica shotcrete with remote controlled equipment (The Robocon System) was developed in Norway 7-8 years ago. Norway was the natura

    Jan 1, 1987

  • SME
    Environmental Evaluation Of The Belle Eldridge Mine Near Deadwood, South Dakota

    By A. D. Davis, C. J. Webb, C. S. Johnson

    The Belle Eldridge Mine is an inactive lead-zinc mine in Spruce Gulch south of Deadwood, South Dakota. Acidic mine drainage (AMD) produced at the site drains into Spruce Creek, a tributary of Whitewo

    Jan 1, 2000

  • SME
    Application of MULTIFLUX for air, heat and moisture flow simulations

    By G. Danko

    MULTIFLUX, a new thermal, hydrologic, and airflow model and software is being developed to solve the flow of heat, moisture, and air in and around an underground opening. MULTIFLUX couples two distinc

    Jan 1, 2009

  • SME
    A Slope Stability Analysis For The Trojan Pit Expansion At The Wharf Resources Mine, Black Hills, SD

    By V. L. Franzen, Z. J. Hladysz, C. A. Kliche

    The Wharf Resources mine, located in the Bald Mountain Mining District approximately 6.4 km (4miles) west of Lead, South Dakota, has operated a surface gold and silver mine and heap leaching processin

    Jan 1, 2000

  • SME
    Assessment of Settlement Due to EPBM Tunnelling in London, UK, on CTRL Contract 240

    By Keith Jones, Michael Francis

    Contract 240 of the Channel Tunnel Rail Link comprises construction of twin4.7 km long running tunnels through a densely populated area of East London. The tunnels were constructed by EPBM in Sands an

    Jan 1, 2005

  • SME
    Tunneling at Hollywood Reservoir

    By D. Olsen, S. Cole, J. Strid, G. Colzani

    This paper focuses on the underground tunnel work at the Hollywood Water Quality Improvement Project (HWQIP) in Los Angeles, CA. The HWQIP is being constructed to provide a water distribution system t

    Jan 1, 2001

  • SME
    Coal Pillar Strength Based On The Ground Reaction Curve ? A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009