Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Why Do Some Passive Treatment Systems Fail While Others Work?By J. J. Gusek
There are hundreds of passive treatment systems accepting mining influenced water (MIW) throughout the world. Some systems do not perform to design expectations while others, including volunteer syste
Jan 1, 2002
-
Recent Developments in North America in the Design of Precast Concrete Tunnel Linings ? IntroductionBy Brian Garrod
Increasing use of pressurized-face tunnel boring machines in North America has produced a similar increase in the application of precast concrete tunnel linings. Where a pressurized TBM is needed, imm
Jan 1, 2008
-
Data Evaluation for Sustainable Development IndicatorsBy S. Möllerherm
"The evaluation of data and information provided by the existing traditional indicators in sustainability assessments is most important. Therefore the Institute of Mining Engineering I from the RWTH A
Jan 1, 2005
-
Reducing The Fire And Explosion Hazards Of Flame Cutting And Welding In Underground Coal Mines - Preprint 09-007By W. D. Monaghan
Flame cutting and welding is one of the major causes of fires and explosions in underground U.S. coal mines. On May 20, 2006, a flame cutting operation at the Darby Mine No. 1 led to an explosion tha
Jan 1, 2009
-
Reflections on ilmenite roasting and magnetic separationBy N. R. Allen, J. D. Steenkamp
Oxidative roasting is applied on an industrial scale to beneficiate ilmenite concentrates from South African East Coast heavy minerals deposits - the aim is to increase the magnetic susceptibility of
Jan 1, 2005
-
Ventilation planning at the Minerales Monclova?s MinesBy J. R. P. Aguirre
Minerales Monclova, S.A. de C.V. (MIMOSA) is owned by Grupo Acerero Del Norte (GAN). This company has 4 underground coal mines and 1 open pit to feed it?s steelmaking facilities located in the city of
Jan 1, 2009
-
Brightwater?s Ballinger Way Portal Presents Deep Shaft Ground Freezing ChallengesBy James D. Nickerson
Thee Brightwater water treatment facilities, currently scheduled to be completed in 2010 and begin operating in 2011, will serve the northern part of King County, WA. The facility includes a new trea
Jan 1, 2009
-
New Developments In The Recovery Of Copper, Cobalt, Zinc And Manganese In The Boleo ProcessBaja Mining is currently constructing the Boleo metallurgical plant in Santa Rosalia, Mexico to recover copper, cobalt, zinc and possibly manganese products from the Boleo ore. The process involves a
Jan 1, 2012
-
Application of Environmental Engineering Models in Systems for Decision Making SupportBy B. Salopek, D. Rajkovic, D. Rumenjak
In decision making support system, that are used in various fields of environmental protection (environmental impact assessment, environmental management systems, setting environmental standards and r
Jan 1, 2005
-
Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMSBy Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13
Jan 1, 2007
-
Design and Startup of Cortez Gold Mine’s Pipeline MillBy Randy N. Powell
The Pipeline gold ore body was discovered in Lander County, NV in March 1991. Construction of the new mine and mill did not start until early March 1996. The $289-million project was placed on a fas
Jan 1, 1999
-
Super Cycle: The FutureBy Douglas B. Silver
Super Cycle future The final topic is mining?s future. The most important questions are ?How much longer is the Super Cycle going to last? What should we expect to see going forward? How will the Sup
Jan 1, 2008
-
Tire maintenance requires an entire team effortBy Roger Best
In the mining industry, where some of the vehicles are larger than a one-story house, tire maintenance cannot be accomplished by the tire shop alone. It takes an army of people to maintain a fleet of
Jan 2, 2010
-
Annual Review 2005 – Mining ReviewBy P. A. Plunkert, D. E. Morse, L. McCartan, J. F. Papp
The mineral sector is a fundamental part of the U.S. economy. It contributes to the real gross domestic product (GDP) at several stages —basic (mining), intermediate processing, manufacturing of fini
Jan 1, 2006
-
Utilization of Strain Measurements on Shielded Tunnel Boring MachinesBy Brad Murray
Evaluating the performance of a shielded tunnel boring machine (TBM) can be difficult because the ground cannot be observed directly and in relation to the TBM attitude within the excavation. It is di
Jan 1, 2008
-
Hindsight Is 20/20?Reverse Engineering Tunnel Risk AnalysesBy Lee W. Abramson
Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,
-
The Effect Of Frother Type And Concentration On The Water Recovery And Entrainment Recovery RelationshipBy J-P Franzidis
A study was undertaken to determine the effect of five industrial frothers on the relationship between entrainment recovery and water recovery. The experiments were conducted using a Batequip rectangu
Jan 1, 2000
-
Modified design of pillar based on estimated stresses and strength of pillar in an underground limestone mineBy Juan J. Monsalve, AMAN SONI, Nino Ripepi, Richard Bishop
The design and strength of pillars are important parameters when implementing the room-and-pillar mining method in a limestone mine. The process becomes complex with the presence of karst voids, which
Jun 1, 2023
-
Taconite Mining – Concerns and ChallengesBy William R. Yernberg
The combined 75th Annual Minnesota Section of SME meeting and 63rd Annual University of Minnesota Mining Symposium was held April 9 and 10, 2002, in Duluth, MN. This year’s theme was “Keys to the Fut
Jan 1, 2002
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion TunnelBy Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008