Management of the Nkomati Mine Crusher Slope FailureBy R. Armstrong
Due to limited available level ground, Nkomati Nickel Mine cut a weathered rock slope at the base of a mountain spur in order to create a platform for construction of the primary crusher plant and run
Jan 1, 2014
-
Probabilistic Mine Design Methods To Reduce Rockburst RiskBy F. M. C. C. Vieira
There are many uncertainties that a mine designer should consider when selecting an optimal layout. Even though the inherent variability in the design parameters indicates that single-values are not r
Jan 1, 2002
-
Longwalling At Great Depth In A Geologically Disturbed Environment - The Way ForwardBy F. Russo-Bello
TauTona Mine (the renamed Western Deep Levels East) is using a longwall mining method with stability pillars to extract the Carbon Leader Reef at a depth ranging from 2097 metres to 3456 metres below
Jan 1, 2000
-
The application of “Optimine” to evaluate risks associated with extraction of a remnant pillar at depthBy S. K. Murphy, K. B. Le Bron, A. K. Ward, S. Hayes, T. Rangasamy
A process for evaluating different options for extraction of mining blocks is presented. The process is described and an example of the application of the process to a case study is presented.
Jan 1, 2003
-
Numerical simulation of multiphase flow in a Vanyukov furnaceBy Y. M. Chen, H. L. Zhang, W. U. Bing, C. Q. Zhou
Multiphase flow in the widely used Vanyukov furnace was numerically studied. An unsteady three-dimensional and three-phase flow model was firstly built using the computational fluid dynamics (CFD) sof
Jan 1, 2015
-
A Review Of The Design Criteria And Practical Aspects Of Developing A Successful Pre-Split.By Simon St J Tose
The objective of this paper and presentation is to review the different criteria and methodology used by AEL and other organisations to create a pre-split design which delivers a stable highwall for t
Jan 1, 2006
-
Management Of Subsidence Associated With The Mining Of The Roof Of The Sishen Cave. An Application Of The Slope Stability RadarBy Glen Mc Gavigan
The roof of the Sishen cave is being mined in order to exploit 6.8Mt of high grade ore. The cavity is filled with quartzite backfill in order to support the roof in the event of collapse. The cave d
Jan 1, 2006
-
Cansolv® SO2 Scrubbing System: Review Of Commercial Applications For Smelter SO2 Emissions ControlBy Valérie Léveillé
As new legislation drives to lower SO2 emissions from metallurgical plants, plant managers face the challenge of keeping their costs under control. The Cansolv® SO2 Scrubbing System has been broadly a
Jan 1, 2009
-
Reduction Of Manganese Ores By Methane-Containing GasBy N. Anacleto, S. Ganguly
Reduction of Groote Eylandt (Australia) and Wessels (South Africa) manganese ores using CH4-H2-Ar gas mixture was investigated in a fixed bed laboratory reactor in the temperature range 1000?1200oC.
Jan 1, 2004
-
Rock-Related Fatality Trends In The South African Gold Mining IndustryA South African gold mining rock-related fatal accident database has been analysed in order to determine rock-related fatality trends in the gold mining industry over the period 1990 to 1998. This ana
Jan 1, 2001
-
Time-space effect and principle of variation loading analyses and application casesBy W. Zhu
ABSTRACT: This paper presents further developments of the principle of Construction Process Mechanics of rockmasses, The principle of loading variations analyses in space-time is systematically descri
Jan 1, 2003
-
The Allure, Magic And Mystery - A Brief History Of DiamondsBy G. Smith
This paper describes the allure of diamonds over time and highlights the magic and mystery of famous diamonds. Consideration is given to the effectiveness of marketing in the diamond industry. It is c
Jan 1, 2003
-
Study On Application Of Fire Suppression Techniques Under Dynamic Fire ConditionsBy R. P. Singh
A mine fire model gallery has been designed and constructed on the premises of the Central Mining Research Institute, Dhanbad, India to perform systematic in-depth studies on various aspects of mine f
Jan 1, 2004
-
Strategic mine planning?communicating uncertainty with scenarios - SynopsisBy G. L. Smith
This paper introduces and defines the concept of a linkage between long-term planning parameters (?global assumptions?) and possible future world views as conceived in scenario planning. Scenario plan
Jan 1, 2008
-
Seismic Wave Propagation To Diagnose The State Of FracturingBy M. W. Hildyard
The aim of this paper is to demonstrate that active seismic measurements could have an impact in helping solve rock engineering problems experienced in the South African mining industry. The paper pre
Jan 1, 2005
-
Advanced Mill Relining ? A Key Operational Control (Not Simply A ?Must Do? Maintenance Function)RME has a vision for a new grinding plant operational paradigm made possible by RME's fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill vol
Jan 1, 2007
-
The Effect of Geological Uncertainty on Achieving Short-Term Targets: A Quantitative Approach Using Stochastic Process SimulationBy M. Soleymani Shishvan
"Continuous mining systems containing multiple excavators producing multiple products of raw materials are highly complex, exhibiting strong interdependency between constituents. Furthermore, random v
Jan 1, 2016
-
Value chain based strategy formulation for mining technical systemsBy C. Lumley
The management of the Anglo Platinum (AP) mining technical systems (MTS) embarked upon a process of defining the strategy for the MTS department. The newly established department forms part of the gre
Jan 1, 2003
-
Future Of The South African Mining Industry And The Roles Of The SAIMM And The Universities - SynopsisBy J. N. Van der Merwe
The current state of the South African mining industry is briefly reviewed from the point of view of an engineer not schooled in the finer details of predictive economics. Based on the assumption that
Jan 1, 2011
-
Optimizing LHD Utilization ? SynopsisBy D. Mkhwanazi
The purpose of the project was to optimize load haul dump (LHD) machinery use as they were spending too much time doing what they should not be doing. During the investigation, the author found that t
Jan 1, 2011