Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Urban Tunneling for the MWRA's Boston Harbor Clean Up

    By Gordon C. Petersen, Gary A. Almeraris

    This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe

    Jan 1, 1991

  • ISEE
    Physics Based 3D Rock Blast Movement Modelling

    By THOMAS BAMFORD, Dale S. Preece, Amir Behbahanian, Mick Lownds

    An important aspect of blasting is rock movement and final muck configuration. Computer modeling of this process has been done in 2D for many years, revealing insights into the blasting process and en

    Jan 26, 2026

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012

  • ISEE
    Analysis of Sympathetic Detonation in Detonating Cord

    By Josh Calnan, Paul M. Holmgren, Abigail N. Styer

    Detonating cord is a staple of the explosives industry, used widely in the civil and defense industries. Detonating cord is a thin, flexible plastic tube filled with pentaerythritol tetranitrate (PETN

    Feb 1, 2020

  • ISEE
    Vibration impact reduction to the community through low density bulk emulsion.

    By E. Líder, J. Pavez, J. Rivera

    The application of new technologies, methodologies, and the use of new products in mining operations is a practice that is becoming more common in the industry every day, added to the new challenges a

    Jan 1, 2024

  • ISEE
    Efficient Blasting for Bench Stability and Fragmentation Results Improvement

    By Javier Illanes Pizarro, Gustavo Huerta Valer, Jorge Cárdenas Miranda

    Bench stability is the basis of sustainability in an open pit mining operation. Taking care of the pit walls while maintaining fragmentation results can prove a challenge. In this study, technical pro

    Feb 6, 2023

  • ISEE
    Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

    By Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores

    Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in

    Feb 6, 2023

  • ISEE
    The Effect of Charge Mass and Delay Timing on Airblast Overpressure

    By Adrian Moore, Dominic Hooton, Alan Richards

    Significant factors affecting airblast overpressure (AOP) emissions include charge mass per delay, distance from the blast site, burden, stemming height, and delay timing, topographic shielding, and m

    Jan 21, 2025

  • ISEE
    Mine-to-Plant Optimization Through Ultra High-Energy Explosives and Blending Strategies in Extremely Hard Rock Conditions

    By Luis Huaroc, Jorge Cardenas, José Salvador

    One of the current challenges in mining is managing increasingly competent rock conditions within the mine-to-plant value chain, particularly when working with marginal ore grades. This study presents

    Jan 26, 2026

  • ISEE
    The Testing of Structures and Structure-combinations to be Applied as Explosive-proof Enclosure

    By C. Heiss, A. Hofmann

    Due to an explosion in an Austrian steel works during the basic oxygen process, the Chair of Mining Engineering and Mineral Economics at the Montanuniversitaet Leoben was assigned with the set-up of a

    Jan 1, 2012

  • ISEE
    Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole

    By Keith Henderson

    An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall

    Jan 1, 2012

  • ISEE
    Slope stability through the application of low-energy explosives technology

    By Jorge Cárdenas, Diego Gamarra

    In previous phases of the mine, a landslide resulted in several losses in production delays. The stability of slopes in a mining operation is critical for the sustainability of the operation, as they

    Jan 21, 2025

  • ISEE
    Method for Developing Explosion Damage Potential Contours in Urban Areas

    By Braden Lusk

    The problem of predicting damage in densely developed areas due to incidental or malicious explosions is one of considerable importance to local, state, and federal governmental bodies. The difficulty

    Jan 1, 2010

  • ISEE
    Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable Layer

    By Ye Yuan, Jaak Daemen, Shaguo Yuan

    ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre

    Jan 1, 2010

  • ISEE
    Numerical Study on Controlled Blasting by Pre-cracked Notch

    By Kwang-Yeom Kim, Dong-Gyou Kim, Hyo-Kwan Yoon

    This study was intended to simulate the blasting model using notched-hole with numerical approach. Numerical analysis approach was applied to compare and evaluate the blasting model using notched-hole

    Jan 1, 2010

  • ISEE
    GEM (Geologic Element Motion) Blast Heave Modeling with More Element Shapes and Energy Partitioning

    By Stewart A. Silling, C. Mick Lownds, Dale S. Preece, Ali Bhuiyan

    GEM (Geologic Element Motion) is a Distinct Element Method (DEM) for modeling blast-induced heave. It was developed with a very fast computational algorithm that efficiently treats many different elem

    Feb 6, 2023

  • ISEE
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground

    By K. Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Jan 1, 2024

  • ISEE
    Quantifying Shovel Performance Through Blast Pattern Boundaries

    By K. Taylor

    In surface coal mining, the performance of a shovel through blasted muck is one of the key performance indicators of the blast. Historically, performance has been measured qualitatively based on opera

    Jan 1, 2024

  • ISEE
    An Explosive Delivery System implementation in the Steep Gullies at the Arapahoe Basin Ski Area

    By Mark Bosse

    This is a paper demonstrating the use of a fixed wire and trolley system to deliver 2 or 5 lb cast primers (with 2 meter cap/fuse assemblies) deep into avalanche terrain. This avalanche terrain is mi

    Feb 1, 2020

  • ISEE
    Detailed Planning Underscores Expansion of Vulcan's Chattanooga Quarry

    By R L. Mayville

    The author explains why the strategic location and important limestone reserves at Chattanooga Quarry led to a decision to extend operating life by continued benching down to lower levels. He discusse

    Jan 1, 1984