Controlling Fragmentation and Ground Vibrations at Owensville QuarryBy Rachel Bauer, Jacob Henderson, Dr. Catherine Johnson
Capital Quarries in Owensville, Missouri faces several challenges when designing a blast that allows for ease of movement while maintaining controlled throw and compliant air over pressure. The primar
Feb 6, 2023
-
Vibration Control in a Tunnel Project under an Existing HospitalBy Pertti Paavola, Hikki Rasanen
This paper describes a very exacting tunneling project. Planning and technical realization of this service and transportation tunnel was especially difficult as a matter of vibration control, because
Jan 1, 1997
-
Coal Supply Engineering Audit SupplyBy John W. Gunnett
The purpose of this afternoon’s presentation is to highlight the investigative proce dures employed to complete an engineering audit of a mining operation. Skelly and Loy has been retained to perform
Jan 1, 1992
-
Effects of Particle Size Distribution on Loading PerformanceBy Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Ertugrul Kaya, Kagan Ozdemir
The results of bench blasting on quarries, have important influences on the performance of subsequent mining activities such as loading, hauling, crushing, grinding etc., and the total costs of that m
Jan 1, 2008
-
Further Improvement to a Safe and Efficient Procedure to Blast, Excavate and Dispose of a Reactive Rock Type (ce9ea776-1b07-4cf4-ab21-135f14ac5eea)By M Ash, P Bellairs
The world class iron ore mines at Mt Whaleback, Tom Price and Paraburdoo located in the Hamersley Province of Western Australia must mine the Mt McRae Shale to obtain high grade ore from the Dales Gor
Jan 1, 1995
-
Preparing a Written Blast Plan (1b8a88a8-1e7f-429f-bd71-b32f7b3dbf86)By David Ziegler
A formal blast plan is sometimes required for projects involving rock excavation. A written blast plan submitted with a bid proposal can also be an important sales tool. A blast plan will cover the ba
Jan 1, 2003
-
Post-Blast Cast Profile Shape Prediction at Large Coal Surface MinesBy Paula Pereira
The better the capability of accurately predicting the results of any process the less laborious and costly is the optimization or improvement of that process. Rock blasting is a process that one inte
Jan 1, 2001
-
Highway Lane Rental Requirement Compromises Blast Site Safety and SecurityBy Harry L. Siebert
A major Arizona highway project is jeopardizing site safety and security because of the lane rental policy. One million cubic yards of rock must be fragmented to provide two additional lanes parallel
Jan 1, 1997
-
Water Overpressure Monitoring during an Arctic WinterBy Jeff Peterson, Alastair Grogan
During the winter of 2001/2002, a number of seismic exploration projects were carried out in the Mackenzie River Delta area of the Northwest Territories, in Canada. The purpose of the seismic projects
Jan 1, 2003
-
Variations in Vibration Signals from Single Hole Quarry BlastsBy Rob Farnfield, Yuill Gavin
The rock blasting industry continues to be under pressure to reduce the level of vibration induced by the use of explosives. In recent years much research and development has been directed to minimizi
Jan 1, 2001
-
Fragmentation Interaction with Underground Mining Systems and ProductivityBy B Mohanty, Y C. Lizotte
Optimization of blast fragmentation in underground hardrock mining requires analysis of its effects on loading and haulage equipment, together with the downstream materials handling system, with the o
Jan 1, 1991
-
Effects of Decoupling and Simultaneous Detonation on Blast VibrationsBy Rodney D. Lamond
The need for blast vibration monitoring can be attributed to a combination of three factors: Structural damage, Blast design and Human annoyance. Traditionally, vibration damage criteria are prescribe
Jan 1, 1995
-
Drill & Blast Optimization in India an Economic & Environmental ReviewBy C. Navalkar
Systematic drilling & blasting techniques are currently being viewed in the mining & construction industry as a correct 8z scientific approach for optimization process in rock excavation, as drill & b
Jan 1, 2001
-
Prediction of the Ground Vibration Attenuation Induced by Blasting for the Different Rock MassesBy A. Karadogan, G. Tuncer, A. Kahriman, S. Gorgun
This paper presents the results of ground vibration measurements induced by blasting operations at five different sites located close to the residential areas. Within the scope of this study, ground v
Jan 1, 2003
-
Elimination of Two-Pass Benching at Colowyo CoalBy Alan Jorgansen, Dave Hummer, Scott Scovira
Kennecott Energy's Colowyo Coal Mine is the largest open pit coal mine in Colorado and produces 5.5 MM tons per year. Colowyo uses the terrace mining method to recover up to seven seams of rolling coa
Jan 1, 2003
-
Drawbacks of Blast Vibration RegulationsBy Mark Svinkin
The purpose of this paper is to present an overview of recommended existing criteria of ground vibrations generated by blasting. It is shown that these criteria have limited liability because they wer
Jan 1, 2003
-
3000t Controlled Chamber Standing ShotBy He Guangyi
Combining living examples, the paper introduces the controlled chamber standing shot of more than 3000t explosives initiated at one time with Nonel under complicated circumstances and the experience o
Jan 1, 1998
-
Ultimate Technological Combination in Electronic Blasting, A Conclusive Contribution to Blasters’ Health & SafetyBy T. Bernard, P. Dozolme
Electronic initiation devices appeared on the market more than 15 years ago and have definitely changed the rules of blasting. It becomes clear that this technology represents a powerful alternative t
Jan 1, 2006
-
Practical Experiences with the Use of Air-Decks in Quarry BlastingBy Peter Moser, Frank Chiapetta, Sacha Diaj, Florian Bauer
Good toe breakage and a flat working bench after blasting are important parameters to achieve a high productivity during material loading and reduce the necessity for secondary blasting. Good toe brea
Jan 1, 2009
-
Challenges of Drilling and Loading 30 and 48 Inch Poduction Blast Holes in a Unique Oilsands EnvironmentBy David P. Reddick
"Suncor Inc. Oilsands Group mining operation in Northern Alberta, Canada, has been blasting to loosen the oilsands to increase production and decrease maintenance of the bucketwheel excavators for ove
Jan 1, 1992