Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • IOM3
    Simultaneous microbial removal of sulphate and heavy metals from waste water

    By L. J. Barnes, R. O. Koch, J. H. Versteegh, P. J. H. Scheeren, F. J. Janssen

    Following two years of laboratory research with bench scale reactors, a 9 m3 experimental process demonstration reactor was installed at Budelco's zinc refinery to treat their underlying groundwater.

    Jan 12, 1992

  • IOM3
    Q&A: Chris Hinde

    By R. G. Jones

    Chris Hinde talks us through his career from BSc in Mining Engineering to roles with Golder Associates, Schroder Securities, Mining Journal and SNL. He discusses the issues facing the mining industry.

    May 1, 2015

  • IOM3
    Review of mine ventilation system optimization

    The following procedure was used to determine cut-off grades: define the orebody profile; plan the stope layout and quantify the work involved; formulate equipment-performance norms; calculate unit co

    Jul 1, 1996

  • IOM3
    Written contributions

    Jan 1, 1947

  • IOM3
    Study of probability of detachment of particles from bubbles in flotation

    The probability of detachment of quartz particles from air bubbles during bubble oscillations was investigated by means of a vibration method. Theoretical calculations of the detachment force based on

    Dec 1, 1991

  • IOM3
    Kinetics of pyrite decomposition in a fluidized bed: part 1: removal of ambient sulphur vapour is rate-limiting; part 2: influence of transfer processes in the bed

    By M. D. Gibbs, T. N. Smith, B. Verbaan

    When heated in the absence of oxygen, pyrite from refractory gold concentrates decomposes endothermically to pyrrhotite, releasing sulphur. The decomposition starts at the particle surface and progres

    Jun 19, 1905

  • IOM3
    Some effects of earth-movement on the Coal-Measures of the Sheffield district (South Yorkshire and the neighbouring parts of West Yorkshire, Derbyshire, and Nottinghamshire).—Part II (discussion)

    By Fearnsides W. G.

    Discussion at the The Midland Institute of Mining, Civil and Mechanical Engineers' general meeting held in Doncaster on 27th May 1916, on the paper published in Trans. I.Min.E., vol.LI, 1916, p.409-44

    Dec 1, 1916

  • IOM3
    The UK's electricity supply position into the next Century

    By D G. Jefferies

    This paper covers National Grid's role in the electricity market, the growth of competition in both generation and supply in that market, and the resulting impact on fuel usage, prices and the environ

    Jan 12, 1997

  • IOM3
    Conveyor chain experince in Australia and South Africa (twin inboardside discharge installations)

    By P A. Collier

    The general view of the author is that all the good intentions of manufacturers can fail completely if the variations in circumstances in underground mining are not considered at all times. With a bel

    Jan 5, 1996

  • IOM3
  • IOM3
    The logic of trams

    By Gibson J.

    The writer hopes to prove that the economical tram is of even greater importance than, say, the economical engine, and as no difficult and involved calculations are required, and all the governing fac

    Dec 1, 1916

  • IOM3
    Geological and metallogenic aspects of late Variscan Ba-(F)-(base-metal) vein deposits of Spanish Central System

    By M. Dobias, N. Mayor, J. Lillo, A. Gonzalez, R. Lunar, R. Oyarzun

    The central domain of the Spanish Central System contains a series of Ba-(F)-(base metal sulphide) hydrothermal vein deposits that are hosted by adamellitic granitoids. Fluid inclusion and sulphur iso

    Jan 4, 1992

  • IOM3
    A method for estimating the grade of diamond deposits

    By R. Phillips

    The low concentration of diamond in workable deposits requires very large samples for grade estimation, and results, even then, may be erratic and difficult to interpret. Although the Poisson probabil

    Dec 1, 1971

  • IOM3
    Concentration of hematite at the iso-octane-water interface with dodecylamine as a collector

    By H. L. Shergold, O. Mellgren

    The conditions of amine concentration and pH necessary for the concentration of fine haematite particles at the iso-octane-water interface have been determined. Results obtained from the related studi

    Dec 1, 1971

  • IOM3
    Solid particle erosion of alumina linings for pulverised fuel transport piping

    By D. J. Wall, T. D. Johnson, M. T. Parry, G. R. Heath

    In coal-fired power stations coal is ground to a fine powder and then transported pneumatically at 25-30 m/s velocity to remote burners. Wear of the conveying pipework is a well recognised problem and

    Jun 12, 1905

  • IOM3
    Andesitic arcs, epithermal gold and porphyry-type mineralization in the Western Pacific and Eastern Europe

    By A. H. G. Mitchell

    Gold-poor and gold-rich porphyry and epithermal gold-silver deposits of Caenozoic and Cretaceous age in the western Pacific and central and eastern Europe are confined to predominantly andesitic conti

    Jan 12, 1992

  • IOM3
    Probabilistic key-block analysis for support design and effects of mining-induced stress on key-block stability: a case study

    By R. Trueman, D. B. Tyler

    Numerical modelling was used to determine the magnitude and direction of stresses around drives both adjacent to and distant from open stopes in the South Crofty tin mine. Modelling predicted that dri

    Jan 4, 1993

  • IOM3
    Cabin air filtration

    By D G. Oldfield

    Pall has developed and supplied to several airlines cabin air libers to provide clean air for passengers and crew in flight, while reducing airline operating costs. Most of today's modern commercial p

    Jan 9, 1996

  • IOM3
    Discussion on fuel economy

    Discussion at the The Midland Counties Institution of Engineers' general meeting, held in Nottingham on 6th May 1916, included contributions by Bramall E., Bragge G.S. and Watkins W.G. regarding possi

    Dec 1, 1916

  • IOM3
    Production planning with working-slope maximum-metal pit sequences

    By D. D. Lei, H. Sevim

    Long-term production planning in open-pit mines requires the determination of cut-off grade, mining and milling production rates, a mining sequence, mine life and ultimate pit limits. Since these vari

    Jul 1, 1996