Statnamic Load Testing Of High Capacity Marine Foundations (62a0500e-14c7-4ace-9608-4578694a5392)
By Mike Muchard
STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o
Jan 1, 2013
-
SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction Event
By Richard T. Stain
"In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred
Jan 1, 2005
-
Technical Note - Load Testing And Interpretation Of Instrumented Augered Cast-In-Place Piles
By Timothy C. Siegel
Given that piles are composed of different materials and installed using a variety of methods, ASTM D 1143/D 1143M-07 Standard Test Methods for Deep Foundations Under Static Axial Compression is justi
Jan 1, 2010
-
Effect of Grid-Form Deep Mixing Walls to Prevent Liquefaction Damage of Small Houses
By Shoichi Tsukuni, Akihiko Uchida, Kazuo Konishi
"In order to investigate the effect of grid-form deep mixing walls as a countermeasure for liquefaction damage to roads and private houses in Urayasu, Japan, three dynamic centrifuge model tests were
Jan 1, 2015
-
Large Scale Jet Grouting And Deep Mixing Test Program At Tuttle Creek Dam
By Mario Mauro
Tuttle Creek Dam was constructed by the U.S. Army Corps of Engineers in the 1950?s on the Big Blue River in north-east Kansas. Since the dam is located in a seismic area, the safety of the dam was re-
Jan 1, 2008
-
Inspector?s Guide To Augered Cast-In-Place Piles - Second Edition - Title ? Table Of Contents - 1.0 General
This manual is limited to Augered Cast-in-Place (ACIP) piles constructed using a hollow stem continuous flight auger. 1.1SCOPE AND LIMITATIONS The intent of this manual is to provide guidelines
Jan 1, 2010
-
Inspector?s Guide to Augered Cast-in-Place Piles
By Matthew E. Meyer
The intent of this manual is to provide guidelines for observing and documenting the installation of ACIP piles. The manual may also serve as a guide for the training of inspection personnel. It is ex
Jan 1, 2010
-
Is the use of Residual Strength Justified in Excavation Support Design?
By George Aristorenas, Carlos Englert, Jesús Gómez
"Laboratory test data of strain softening soils exhibit the development of a maximum (peak) shear strength followed by a decrease in the strength with continued straining. The rate of strength loss de
Jan 1, 2015
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River Gorge
By Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Session I - How Geology Has Driven Foundation Practice Worldwide - Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City ? Synopsis
By George J. Tamaro
The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma
Jan 1, 2000
-
Very Deep Foundations in Rock: The New Challenge in the Foundation Industry.
By Paolo Cavalcoli, Federico Pagliacci
"As opposed to the static functional recovery of existing structures, the construction of infrastructures in an urban environment, when combined with complex geological situations, often involves buil
Jan 1, 2015
-
Repairs Of Diaphragm Walls, Lessons Learned
By Raymond J. Poletto
This paper describes the special problems that occur with the construction of diaphragm walls and discusses the lessons learned during the repairs of structural walls. Although diaphragm or slurry wal
Jan 1, 2011
-
Capitol Complex Phase 1 Expansion
By Eric S. Lindquist, Charles A. Luxford
The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par
-
Extra Deep Cut-Off at 250 m Depth - A Case Study
By Federico Pagliacci
"Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa
Jan 1, 2017
-
Wet Soil Mixing for Supporting Bridge Abutments on Spread Footings
By Adam Gerondale, David Hemstreet, Lisheng Shao, Kenji Yamasaki
"Foundation soils of a proposed single-span bridge over a busy railroad in Anchorage, Alaska included a layer of sensitive, non-plastic to low-plasticity silt. Slope stability analyses showed that, wi
Jan 1, 2015
-
-
Dynamic Load Testing of Drilled Deep Foundations
By Paikowsky, Samuel G.
"Due to the way drilled deep foundations are being constructed, their structural integrity and geotechnical capacity are highly variable. Drop weight systems are increasingly being used to dynamically
Jan 1, 2015
-
Reliability Analysis Of Load Bearing Capacity Of Single Pile Placed Adjacent To Existing Buried Conduit Or Utility Tunnel
By Amit Srivastava, Monica Malhotra
In a congested city or urban area, so called “lifeline of the city”, i.e. Gas, Electricity, telecommunication, as well as other utilities or facilities are supplied or transported underground through
Sep 1, 2022
-
Identification and Quantification of Pile Relaxation
By Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam
Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of
Jan 1, 2019
-
Pile Inspector's Guide To Hammers ? Introduction
The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding
Jan 1, 1995