    O Street Anchored Precast Lagging And Soldier Pile Retaining Wall

    By John Wise

    Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu

    Jan 1, 2003

  • DFI
    Micropile Foundation Retrofit Design For Richmond-San Rafael Bridge, Richmond, California - Introduction

    By Patrick E. Durnal

    The Richmond-San Rafael Bridge was built in the early 50s' and was first opened to traffic on August 31, 1956. Among California's longest steel bridges, it spans more than 21,000 feet across

    Jan 1, 1998

  • DFI
    Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based Inclinometers

    By Peter Chou

    A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st

    Jan 1, 2009

  • DFI
    Argosy Casino Expansion: Open Cell Sheet Pile® Harbor Project

    By Michael Lane

    With the success of their existing casino operation on the Ohio River in Lawrenceburg, Indiana, the Indiana Gaming Co., LP planned a major expansion of the current facilities. This expansion includes

    Jan 1, 2008

  • DFI
    Installation, Design, And Quality Control Of Augercast Piles ? Introduction

    By William J. Neely

    Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd

    Jan 1, 1990

  • DFI
    Vessel Collision Design - Risk Analysis And Deep Foundation Issues For Bridges Over Navigable Waterways

    By Michael A. Knott

    Large lateral forces on bridge foundations due to extreme events such as vessel collisions, earthquakes, and wave forces on storm surges during hurricane events are often the controlling design condit

    Jan 1, 2013

  • DFI
    Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues

    By Alain E. Holeyman

    After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi

    Jan 1, 2006

  • DFI
    A Cut And Cover In Stiff Clay In Eurre-France - Synopsis

    By R. Stenne

    This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly

    Jan 1, 2000

  • DFI
    Experimental Evidences From A Pile Load Test On A Driven Composite Pile

    By A. Garassino

    A pile design was performed for a thermal power station in Egypt and more than 4000 piles were to be driven. Technical economical reasons suggested the choice of driven composite LACOR piles designe

    Jan 1, 1991

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2005

  • DFI
    Building Response To Construction Activities

    By Marco D. Boscardin

    Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have

    Jan 1, 2003

  • DFI
    Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge Rehabilitation

    By Jeffrey R. Hill

    To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a

    Jan 1, 2006

  • DFI
    Creative Shoring Solutions For A Tight Urban Site

    By David G. Winter

    The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s

    Jan 1, 2009

  • DFI
    History And Present Status Of Piles And Their Installation In The United States - Expanded From A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982

    By Hal W. Hunt

    Steel and concrete piles and power-actuated hammers have developed almost entirely within the past 100 years. Prior to that time, piles were mostly timber, driven with a drop hammer or a maul. The Eng

    Jan 1, 1984

  • DFI
    Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power Facility

    By David Gatto, Nicolas A. Willig-Friedrich, Jeff A. Segar

    "With the increasing demand for electricity, and requirements to generate this power cleanly, more producers are turning towards hydroelectric power. A project in Iowa currently under construction wil

    Jan 1, 2016

  • DFI
    Experience Gained At The Application Of Atlas Piles In Poland

    By Kazimierz Gwizdala

    In recent years, in Poland the ATLAS piles have been successfully applied for some constructions near Gdansk. The piles have been used as foundations for housing and another areas of civil engineering

    Jan 1, 2006

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • DFI
    Seal Slab / Steel Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen

    Jan 1, 2013

  • DFI
    Lateral Load Testing Micropiles To Evaluate The Impact Of Threaded Joints And Casing Embedment On Short Micropiles In Shallow Rock

    By J. Brian Anderson

    Jointed micropiles were investigated to support bridge foundations where shallow rock was present. In this application, micropiles would have some amount of unsupported length, and would be subject t