Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Statistical Multi-Scale Method of Mechanics Parameter Prediction for Rock Mass

    By J. Z. Cui

    In this paper a statistical multi-scale method for the mechanics parameter prediction of the rock mass with random distribution of multi-scale cracks/joints is presented. First the micro-structure of

    May 1, 2009

  • CIM
    Geometallurgical Modeling of the Dumont Deposit (0daa1b2e-54ab-4163-adcf-32c9366ffe5b)

    By K. Nasrallah

    "The Dumont deposit is a large (1,179 Mt proven and probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporatio

    Jan 1, 2016

  • CIM
    A technique for the direct measurement of bubble size distributions in industrial flotation cells

    By J. A. Finch

    "A method of sampling and presenting bubbles for imaging for use in full-size flotation cells is described. The device (bubble viewer) comprises a tube attached to a sealed glass viewing chamber. The

    Jan 1, 2002

  • CIM
    The Importance of Water Utilization for Maximizing Grinding Circuit Classification System Efficiency

    By Robert E. McIvor

    "The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill’s grinding performance. The factors which affect ci

    Jan 1, 2009

  • CIM
    Balancing and Estimating the Ore Mineral Contents from Daily Production Samples

    By Maryam Sadeghi, Jonathan Roy, Claude Bazin

    "The operation of mineral processing equipments is intimately related to the mineral composition of the ore. However unit performances are usually characterized in terms of metal contents or recoverie

    Jan 1, 2016

  • CIM
    Effect of Oil Sand Mining Operations on Haul Truck Dump Body Design

    By David Whalen

    Mobile equipment in oil sand mining operations experience more maintenance problems than similar equipment in other surface mines, due to soft underfoot conditions. Oil sand properties are known to va

    May 1, 2003

  • CIM
    Statistical Control in the Evaluation of an Asbestos Deposit

    By Robert F. Shurtz

    This paper discusses and compares methods of statistical analysis of the information relating to the evaluation of an asbestos deposit. From a study of 10-ft. lengths of drill core, the separate effec

    Jan 1, 1966

  • CIM
    Observation of Ore Pass System Performance at Brunswick Mine

    Brunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio

    Feb 1, 2008

  • CIM
    Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and Installation

    By Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt

    "In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due

    Jan 1, 2013

  • CIM
    Extension of the Comminution Energy Curves and Application to Stirred Milling Performance

    By P. Radziszewski

    "The comminution energy curve is a profoundly simple graphical technique that displays detailed operating efficiency information for industrial comminution processes. The database underlying the meth

    Jan 1, 2016

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "Abstract - The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the La Joya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein (BPV)

    Jan 1, 1997

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia (5a50eab3-2567-48d0-8c87-7819113638f7)

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the LaJoya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein(BPV) type, with a

    Jan 1, 1997

  • CIM
    Exploration (b5d994dc-54d9-422d-9999-62e9a88e4dbc)

    By D. R. Derry

    "IT WOULD TAKE a braver man than I to try to forecast the future of mining exploration far into Canada's second century. Even to look ahead ten or twenty-five years we must review the figures of the f

    Jan 1, 1968

  • CIM
    BC Mining and Implications of Climate Action

    By Gavin C. Dirom

    ? The Mining Association of British Columbia (MABC) was established through an Act of Parliament in 1901 ? The MABC represents the interests of B.C.?s ? Coal and mineral mining companies ? Smeltin

    May 1, 2008

  • CIM
    Metallurgical Practice at Golden Manitou

    By D. A. Livingstone

    Abstract Golden Manitou Mines, Limited, nine miles east of the town of Val d'Or in northwestern Quebec, are presently milling, at the rate of 1,000 tons daily, a relatively complex 3.11-phide or

    Jan 1, 1952

  • CIM
    Application of conditional simulations to resource classification schemes

    By M. E. Rossi, J. E. Camacho

    "Geostatistical conditional simulations are becoming increasingly popular as tools that provide models of uncertainty at different stages of a mining project. They have been used as grade control tool

    Jan 1, 2004

  • CIM
    High Strength Aerated Cement Bulkheads for Target Gold Mine, South Africa

    By D. J. R. Ras

    A sub-level open stoping method is being used to mine the massive deposits at TARGET Gold Mine which uses cemented tailings to backfill the stopes. This requires the construction of bulkheads to conta

    May 1, 2007

  • CIM
    Deformation and Structural Controls on Gold Mineralization in the Clarence Stream Shear Zone, Southwestern New Brunswick, Canada

    By K. G. Thorne, D. R. Lentz, A. F. Park

    "The Main zone of the Clarence Stream gold deposit is hosted by a shear zone adjacent to the Saint George batholith in southwestern New Brunswick. The mineralization history relates to progressive def

    Jan 1, 2008

  • CIM
    A Complete System for On-Stream Particle Size Analysis

    By B. F. Osborne

    "A new sensor cannot be considered in isolation from the process in which it is utilized. This paper, describing an on-stream particle size analyzer, therefore gives considerable emphasis to the slurr

    Jan 1, 1972