Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Telerobotic experiments for mining (8fd4a26a-5d34-4ad8-b4a0-4ac70eca96ab)

    "The application of telerobotics to mining is currently being introduced into production systems around the world. Mining companies in Canada, Sweden, South Africa, and Australia have tended to lead t

    Jan 1, 2005

  • CIM
    Flotation and Hydrometallurgy Research on Brunswick Tin Mine Ores

    By E. W. J. Thornton

    During the past six or seven years extensive research has been performed on ore samples procured at the Bruns1,vick Tin Mines which is located in the south-west corner of New Brunswi.ck. This property

    Jan 1, 1977

  • CIM
    Monitoring of Highwall Stability at the Dome Open Pit

    By John G. Henning

    The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce

    May 1, 2004

  • CIM
    The Response of Cemented Backfill to Dynamic Loads from Field Observations and Split Hopkinson Pressure Bar Tests

    By J. C. Johnson

    Underhand mining with cemented mill tailings for backfill has proven to be a safe and effective alternative to conventional overhand mining for rockburst prone mines. The ability of the cemented sand

    May 1, 2007

  • CIM
    Extraction of Helium From Natural Gas. The Diffusion-Through-Glass Process*

    By N. Melnyk, H W. Habgood

    The conventional low temperature process for extracting' helium from natural gas involves liquefying the whole gas stream in order to remove the relatively small fraction of helium. A process based on

    Jan 1, 1961

  • CIM
    Use of gravity drainage and quasi-homogeneous dykes for containment of oil sand tailings (df9a2317-173a-4976-8412-bf4feb957a4f)

    By L. Nichols, H. Keele, K. Czajewski

    "The oil sands industry in northern Alberta disposes of the by-products of bitumen extraction into tailings ponds. The mix of tailings sand and mature fines, with gypsum added as a flocculent, constit

    Jan 1, 2008

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009

  • CIM
    Self-optimizing Grinding Control for Maximising Throughput while Maintaining Cyclone Overflow Specifications

    By Eduardo Nunez, Asim Tuzun, Dan Graffi, Glenn MacPherson

    "In preparation for the milling of a new nickel and copper mine ore, Nickel Rim South, Xstrata’s Strathcona Mill is undertaking numerous process improvement projects. Within the grinding circuit, seve

    Jan 1, 2009

  • CIM
    Slurry Pump and Pipeline Performance Testing at the Georgia Iron Works Hydraulic Laboratory

    By G. R. Addie

    "In February, 1975, the President of Georgia Iron Works Company, Mr. Tom Hagler decided to build a new hydraulic laboratory to water performance test all of the companies' centrifugal slurry pumps.Equ

    Jan 1, 1980

  • CIM
    Probabilistic practical optimization of production scheduling for multi-element deposits

    Optimizing production scheduling in open pit mines is important for managing cash flows of mining operations. This paper describes a new, probabilistic, mixed integer programming (MIP) formulation whi

    Jan 1, 2006

  • CIM
    Intelligent Air Management for Energy Efficiency in Mining and Mineral Processing Operations

    By Arun .. J. Basu

    The paper introduces Intelligent Air Management (IAM) as the core activity of M&I Group of Companies (M&I) for providing a total solution to any air management problems for mining and mineral processi

    Apr 1, 2005

  • CIM
    Dynamic Testing of Threadbar used for Rock Reinforcement

    A comprehensive axial test program has been undertaken at the WASM Dynamic Test Facility on the performance of 20mm threadbar. The threadbar tests had a double embedment configuration, with variation

    May 1, 2009

  • CIM
    Stabilization and regeneration of Ce02 and Ce02/Zr02 based Pt catalyst for the water gas shift reaction

    By R. M. S. Häggblad

    The article deals with stabilisation and regeneration of Ce02 and Ce02/Zr02 based Pt water gas shift catalysts, subject to high initial deactivation. The reaction gas species effect on the catalyst de

    Jan 1, 2005

  • CIM
    Implementation of a Semi-Autogenous Grinding Circuit at the Brunswick Concentrator

    By Chris Larsen, Ian Orford, Mike Cooper

    "An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The autogenous grinding circuit replaced existing surface crushing plants, fine ore storage, rod and pri

    Jan 1, 2001

  • CIM
    Improving Raisebore Stability Assessments and Risk

    By B. M. Coombes

    The McCracken and Stacey (1989) method of assessing geotechnical risk for largediameter raisebored shafts has been the basis for most Australian pre-construction raisebore investigations for the past

    May 1, 2011

  • CIM
    Demonstrations and Discussion on Geophysical Methods of Prospecting: The Electromagnetic Method

    By Etienne S. Bieler

    Mr. Chairman, Ladies and Gentlemen, I come to you tonight distinctly as a physicist, not as a geologist or a mining man. My experience in applied geophysics has been short, and I do not doubt that man

    Jan 1, 1928

  • CIM
    Ball Valves with Nanostructured Titanium Oxide Coatings for High-Pressure Acid-Leach Service: Development to Application

    By J. Walker, G. E. Kim

    Since May of 2000, Mogas Industries, in partnership with F.W. Gartner Thermal Spraying Co. and using the services of Perpetual Technologies, has invested time, energy, and resources towards developing

    Jan 1, 2004

  • CIM
    Rubber Lining Design for Grinding Mills: Influence on Economy and Capacity

    By Gustav Nillson

    There is a difference in design parameters between steel linings and rubber linings for grinding mills. The basic design parameters for rubber are described and a comparison is made between steel and

    Jan 1, 1979

  • CIM
    Thompson 1-D Deposit Geology and Structure

    By Rob Stewart

    Acknowledgements ? Josef Macek(Manitoba Geological Services) ? Sally Goodman (SRK) ? Inco Geologists ? Rogerio Montiero ? Thompson Mine Geologists Introduction ? Regional Geology ? Thompson G

    May 1, 2006

  • CIM
    Flotation Process Optimization Using Outotec Frothcontrol Solution

    By M. Mononen, J. Huuskonen, M. Vauhkonen, J. Kourunen, A. Lehikoinen

    "A new approach to measure process conditions in flotation cells is presented. Real scale flotation cells in a Zinc circuit are imaged using Outotec LevelSense sensors based on electrical resistance t

    Jan 1, 2013