Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Changes in grade, volume and contained gold during the mining life-cycle of gold placer deposits

    By J. D. Bliss, G. J. Orris, W. O. Menzie

    "Analysis of gold placer data from gold placers throughout the world suggests that gold grades and volumes cannot be used to distinguish between most types of gold placers. Only the alluvial plain and

    Jan 1, 1987

  • CIM
    Hydrochloric acid leaching of an Elliot Lake uranium ore

    By G. M. Ritcey, K. E. Haque, S. H. Lucas

    "Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an

    Jan 1, 1980

  • CIM
    Hydrochloric acid leaching of an Elliot Lake uranium ore (13a41608-dfe4-4266-9026-6b4afd0847bf)

    By G. M. Ritcey, K. E. Haque, S. H. Lucas

    "Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an

    Jan 1, 1980

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Process Mineralogy of Silver Ores and Applications in Flowsheet Design and Plant Optimization

    By Joe Zhou

    "Mineralogical characterization and metallurgical extraction of silver is challenging due to its complex mineralogy and chemistry. Over 200 Ag-bearing minerals have been identified and a silver-rich o

    Jan 1, 2010

  • CIM
    Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits

    By J. A. McLennan

    Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer

    Apr 1, 2005

  • CIM
    The Relations between Assarel-Medet JSC, Bulgaria, and the Municipality ?f Panagyurishte - A successful model for sustainable and socially responsible partnership

    By Lachezar Tsotsorkov

    Corporate social responsibility Is a principal trend of the corporate strategy for sustainable development of Assarel-Medet JSC ? the largest Bulgarian company for open pit mining and ore processing

    Aug 1, 2013

  • CIM
    Mining Operations and Slurry Pipelines Update and Future

    By R. A. Hill, J. D. Pitts

    "Long distance slurry pipeline systems have been successfully trans-porting steam coal, iron concentrates, copper concentrates and limestone for an aggregate of nearly 60 years and nearly three billio

    Jan 1, 1978

  • CIM
    The Hydration Kinetics of Magnesium Oxide Obtained by Calcination of Magnesite (MgCO3) or Synthetic Nesquehonite (MgCO3·3H2O)

    By Zhibao Li, Kunming Zhai, Yan Zhang

    The hydration kinetics of MgO, namely magnesia or magnesium oxide, obtained by calcination of magnesite MgCO3 or synthetic MgCO3·3H2O has been studied. Nesquehonite (MgCO3·3H2O) was prepared by the re

    Jan 1, 2014

  • CIM
    Decommissioning Pits with Ecological Engineering

    By M. Kalin

    "Ecological Engineering, a biotechnological approach to the decommissioning of base metal mining wastes, is being tested on two pits (Gloryholes) in Newfoundland, Canada. Pit #2 has an average pH of 3

    Jan 1, 1992

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • CIM
    Future mining opportunities for fuel cell applications

    By A. R. Miller, M. C. Bétournay, D. L. Barnes

    "A number of successful proof-of-concept projects have been carried out to replace conventional power application, such as diesel and rechargeable batteries, in underground mine vehicles. This has led

    Jan 1, 2003

  • CIM
    Barrick Goldstrike Roaster Facility Dry Grinding and Leach

    By Dayle Denton, Lloyd Buckingham, Kenneth G. Thomas, Jacques McMullen

    "The dry grinding and leaching circuits of Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of the

    Jan 1, 2001

  • CIM
    Using Laboratory Scale Flotation Testing to Predict Pilot Scale Flotation Performance

    By E. Amini

    "While methods exist to allow the simulation and optimization of existing flotation operations, there is a deficit in the ability to predict the performance of a new ore type pre-processing. A laborat

    Jan 1, 2009

  • CIM
    Distributed Digital Control of a Flotation and Grinking Circuit at the Kidd Creek Concentrator

    By O. Matwijenko

    "The Kidd Creek concentrator is located twenty-six kilometres east of Timmins, Ontario, within a metallurgical complex including a 109,000 MTPY zinc plant and a new 59,000 MTPY copper smelter and refi

    Jan 1, 1980

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • CIM
    The Rabbit Lake Mill Operation Past, Present and Future

    By K. Wyper

    "Gulf Minerals (Canada) Limited' s Rabbit Lake Uranium Operation is located in the northern portion of Saskatchewan, 198 miles southeast of Uranium City and 134 miles northwest of Lynn Lake Manitoba.T

    Jan 1, 1982

  • CIM
    Cummins Tier 4 Technology

    By Evelynn Stirling

    Agenda ? Emissions legislation ? Cummins Tier 4 Technology ? Cummins Experience with Technology ? Operation and Maintenance Impact The Emissions Challenge ? The 2014/5 emissions regulations pr

    Aug 1, 2013

  • CIM
    The Caustic Crack Route for Processing Concentrate from the Avalon Nechalacho Deposit

    By Dave Marsh, John Goode, Niels Verbaan, Kevin Bradley, Henrie Notzl

    The mineralogy of the Avalon Nechalacho deposit is complex with significant fractions of HREEs, Zr, and Nb found in refractory minerals such as zircon and fergusonite. Sulphuric acid baking followed b

    Jan 1, 2014

  • CIM
    Mine-Mill Waste Water Treatment at Brunswick Mining

    By D. M. Fraser

    "Brunswick Mining and Smelting Corporation Limited operates two mines; one open pit (No. 6) and one underground (No. 12), approximately 20 miles south-west of Bathurst, New Brunswick. Both are massive

    Jan 1, 1980