Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Oxygen Mass Transfer Considerations for Cyanidation Reactors

    By G. Dubé, A. Leclerc, P. Quinn, G. E. Agar, J. Y. Clouthiér, J. D. McLaughlin

    "Gold dissolution by cyanide requires the presence of oxygen which is usually supplied by sparging compressed air into the gold containing slurry. For those ores that contain certain obnoxious substan

    Jan 1, 1993

  • CIM
    Inco roast-reduction smelting of nickel concentrate (eaf8b517-9c46-4962-8c74-3e37ab47ff1e)

    By C. Díaz, A. D. Dalvi, C. E. O'Neill

    Roast-reduction smelting (RRS) of nickel concentrate, combined with flash smelting of copper concentrate, was one of the process options that Inco considered as a means of meeting its 1994 sulphur dio

    Jan 1, 1994

  • CIM
    Resource Estimation of Structurally Complex and Discontinuous Mineralization Using Non-linear Geostatistics: Case Study of a Mesothermal Gold Deposit in Northern Canada

    "Abstract - An estimation of resources of structurally complex gold lodes and stockworks represents a challenging task for geoscientists due to the complex geometry of the lodes and discontinuous grad

    Jan 1, 2002

  • CIM
    Flash Furnace Feed System Developments

    By M. Coleman, M. E. Reed

    The control of feed delivery quality to the flash furnace remains an unsolved problem. Many operations around the world still have limited control of feed quality to their flash furnace. Schenck Proce

    Jan 1, 2019

  • CIM
    Hydrolysis for Iron Control and Acid Regeneration in Chloride Hydrometallurgy Circuits

    By M. J. Dry, G. B. Harris

    "This paper presents basic chemistry and operating conditions for the hydrolysis of ferric chloride into solid hematite and gaseous hydrogen chloride, and shows how this unit operation can be applied

    Jan 1, 2016

  • CIM
    Mining agreements, royalties and profits (9d2cbc9b-c225-4234-b4a1-c8b4550910d4)

    By Robert B. Parsons

    "This article is based on a paper presented by Jim Scott at the 1988 annual convention of the Prospectors and Developers Association of Canada. The paper suggests a number of factors that might be tak

    Jan 1, 1988

  • CIM
    Flowsheet development for small gold and silver operations (synopsis)

    By Roger M. Nendick

    "IntroductionThe stages of development for bringing a mill into production demand that a flowsheet for the process be developed at an early stage. Detailed engineering of the mill may then proceed wit

    Jan 1, 1983

  • CIM
    Mining agreements, royalties and profits

    By Robert B. Parsons

    "This article is based on a paper presented by Jim Scott at the 1988 annual convention of the Prospectors and Developers Association of Canada. The paper suggests a number of factors that might be tak

    Jan 1, 1989

  • CIM
    Treatment of Hydromet Processing Crude Using Decanter Centrifuge

    By J. Kramer, T. Hartmann

    In the Hydrometallurgical processes, the presence of the so-called “crud” is a constant challenge in solvent extraction. Crud is a stable emulsion which forms along the interface between the aqueous a

    Jan 1, 2012

  • CIM
    Technological advances in telecommunications for mines (d89a3fa8-5075-4299-bd13-b46b93bee6c1)

    By P. M. Y. Waye, R. Yewen

    "As mines utilize more automation in mining operations to improve efficiency and safety, a corresponding increasing demand is placed on the transport of information. Some of the recent technological a

    Jan 1, 2002

  • CIM
    Financing industrial mineral deposits on the Vancouver Stock Exchange

    By James Mackie

    The Vancouver Stock Exchange (VSE) has been providing venture capital for start-up companies since 1907. Ninety years' experience in the junior mining industry has enabled the VSE to develop policies

    Jan 1, 2001

  • CIM
    Evaluation of Copper Losses Using Flow Patterns in the Cl-Furnace of the Mitsubishi Process

    By H. Sakurai, M. Kato, F. Tanaka

    The Mitsubishi Continuous Copper Smelting/Converting Process employs an electric furnace (CL- furnace) for settling the slag/matte mixture formed in the smelting furnace. The conditions in the CL- fur

    Jan 1, 2019

  • CIM
    Improving Management at Mine Site Pit Lakes

    By John Crusius

    ? 3-year research program overview ? initial results- MainZone pit Waterline pit ? questions raised ? increasingly common in western N. America ? frequently low-pH waters with elevated concentra

    May 1, 2002

  • CIM
    Highwall Coal Recovery

    "Line Creek Resources Ltd. produces three million clean tonnes per year of metallurgical and thermal coals for the international market. The mining operation, which is located in the mountains of sout

    Jan 1, 1995

  • CIM
    Cementation of Silver from Synthetic Leach Solutions of Waste of Printed Circuit Boards (WPCB)

    By H. Deveci, E. Y. Yazici, A. D. Bas

    The leach solutions of waste of printed circuit boards (WPCB) may contain a wide range of base and precious metals with different concentrations due to heterogeneity of these wastes in composition. Th

    Jan 1, 2016

  • CIM
    Sorting of a niobium ore on geological bases and by X-MET analyzerc

    By H. Sipilä, H. Vartiainen, H. Paarma

    "The carbonatite massif of Sokli includes several low-grade Nb showings composed of ores and wastes as identified by routine analyses. More detailed lithologic proportions were determined in two orebo

    Jan 1, 1985

  • CIM
    Measuring Grade-Recovery and Partition Curves of Dense Minerals by Batch Fractionation in a Laboratory-Scale Reflux™ Classifier

    "Sink-float analysis is often used to obtain yield-ash and density partition curves in the coal industry. These provide a valuable tool for evaluating the performance of a separation process. However,

    Jan 1, 2016

  • CIM
    Underground water bulkhead construction at Pamour No. 1 mine

    By H. Kalsi

    "IntroductionRoyal Oak Mines Inc. is currently operating the Parnour No.1 mine located 10.5 miles east of Tinunins, adjacent to Highway No. 101. The operation produces gold ore at a rate of 3300 tpd.

    Jan 1, 1994

  • CIM
    The selection and use of fire-resistant hydraulic fluids for underground mining equipment

    By A. J. Harrison

    "The introduction of an amendment to the Mines Regulation Act in the Province of British Columbia, passed in July 1974, and similar amendments since enacted by other provinces introduced the Canadian

    Jan 1, 1981

  • CIM
    Numerical Analysis of Hard Rock Pillars using the Cohesion Weakening Friction Strengthening Model

    By H. Rafiei Renani, C. D. Martin

    "The Cohesion Weakening Friction Strengthening (CWFS) is adopted in numerical analysis to capture the observed progressive failure of hard rock pillars. As a case study, pillars at the Elliot Lake min

    Jan 1, 2015