Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Operation and Maintenance of Mineral Processing Plants (A CMP Textbook)

    By A. L. Mular

    "On behalf of Bob Bruce and myself I would like to begin by stressing some key points.First, most of us know that the Canadian Mineral Processors was formed in 1969 and is an offshoot of the Canadian

    Jan 1, 1979

  • CIM
    Computer-aided mine design and planning for underground mines

    By Chaluvadi K. Sridhar, Prashanta K. Chatterjee

    "IntroductionThe planning of an underground coal mine requires a complex blend of technical expertise, experience and subjective design criteria implemented by the mining engineer. Currently the proce

    Jan 1, 1986

  • CIM
    Copper-Nickel Separation Pilot Plant Evaluation of Flowsheet Options

    By Sadan Kelebek, Gerhard W. Heinrich, Peter F. Wells, Peter J. Whittaker

    "Based on plant mineralogical data & circuit modelling, a pilot plant campaign was conducted at Strathcona Mill to identify options for improving the performance and operating flexibility of the coppe

    Jan 1, 1995

  • CIM
    Wet grinding of asbestos ores through reduction of slurry viscosities (d23459a3-b729-4556-9e3c-f23ec7e052f3)

    By D. E. M. Plaumann

    "The wet grinding of asbestos has attracted the attention of engineers for many years as a means of improving fibre liberation from the ore. Today, added impetus for wet grinding has resulted from a n

    Jan 1, 1988

  • CIM
    Refining of platinum-group metals

    By G. P. Demopoulos

    "The recovery and separation of platinum-group metals (PGM) from primary and secondary materials currently attracts a lot of interest due to the high value of the metals and their increasing demand fo

    Jan 1, 1989

  • CIM
    When to Choose Direct to Blister Smelting Process

    By L Thompson, R C. West, T S. Kho

    In 1978, the Outotec direct to blister flash (DBF) smelting process was commercialized with the commissioning of the Glogow 2 smelting facility in Poland. Since then four further DBF facilities have b

    Jan 1, 2019

  • CIM
    A Comparative Study of Two Centrifugal Concentrators

    By A. R. Laplante

    "In this paper, the performance of the Knelson Concentrator and of the batch and continuous Falcon Concentrators are compared. The units are based on different operating principles, and as such they p

    Jan 1, 1993

  • CIM
    Partnerships with suppliers

    By Vic Casaletto

    "IntroductionThe Canadian mining industry is under immense pressure to compete with foreign mine operations. The very survival of the Canadian mining industry is threatened by lower ore grades, enviro

    Jan 1, 1994

  • CIM
    Computer Control of a Flotation Circuit

    By M. Amsden

    "Since the computer program is far from complete this must be only a brief progress report on the computerization of flotation metallurgy at the Ecstall concentrator at Timmins.Ecstall is currently tr

    Jan 1, 1971

  • CIM
    A temporary use of the land at Highland Valley Copper

    By Poul Hansen

    "In mid-1986, a world-class mining enterprise was created in Highland Valley, British Columbia, bringing together the copper mining operations of Lomex and Cominco . In 1988, Highmont joined the new p

    Jan 1, 1992

  • CIM
    The origin of our continent: LITHOPROBE seismic investigations in the Western Superior Transect

    By H. Helmstaedt, P. Thurston, R. Harrap

    "Evolution of the continental lithosphere over Earth’s 4.6 billion year history is one of the fundamental questions of geoscience. Much of the Earth’s present-day continental crust formed during the f

    Jan 1, 1998

  • CIM
    Utilizing a MARC to start-up Muskeg River Mine

    By Chris Yellowega

    The construction and startup of a new mine is a daunting task. To successfully locate, design, build and startup an immense human endeavour like a new mine, takes perseverance, planning, dedication an

    May 1, 2003

  • CIM
    An Evaluation of a High Gradient Magnetic Separation Pilot Plant at Brunswick Mining and Smelting

    By Jan E. Nesset, L. Paul Staples

    "High Gradient Magnetic Separation (HGMS) technology, although developed over 2 decades ago, has not been widely applied to the separation of sulphide minerals. Under conditions of strong magnetic fie

    Jan 1, 1996

  • CIM
    Design and Construction of Mineral Processing Plants using Project Management

    By A. J. Williams

    "Whenever a decision is made to bring a mineral deposit into production, the Owner in actual fact has decided to convert substantial sums of capital into productive capacity with the intenti6n of maki

    Jan 1, 1974

  • CIM
    Detailed OPEX Comparison of Modern Copper Smelting Technologies Using HSC-SIM Modelling

    By Ali Bunjaku, Lauri Pesonen, Hannu Johto

    It is well known that there are many ways to process copper concentrates into copper anodes using the pyrometallurgical route. All modern copper smelting technologies are fundamentally energy efficien

    Jan 1, 2019

  • CIM
    Corporate considerations in mine decommissioning

    By M. J. Brodie

    "The decision to proceed with mine decommissioning, generally involves a number of complex and independent factors. These factors, including potential for re-opening, legal requirements, contingent li

    Jan 1, 1995

  • CIM
    Bioflotation of Sarcheshmeh Copper Sulphide Ore

    By A. Eslami, H. Tabatabaei, M. Kolandoozan, Z. Manafi, A. R. Shahverdi, M. Noaparast, M. Oliazadeh

    Application of Acidithiobacillus ferrooxidans bacteria to flotation of Sarcheshmeh low-grade copper sulphide ore was studied. Sarcheshmeh low-grade ore contains pyrite, which causes some problems in t

    Jan 1, 2004

  • CIM
    Operator Competency and the Challenges of Today’s Mineral Processing Plants

    By Sylvain Castonguay, Sylvain Pilon

    "Operator competency is an important factor in the safe and successful operation of today’s complex processes. Competent process unit operators deliver superior performance and results. In greenfield

    Jan 1, 2016

  • CIM
    Tuning Foamability and Foam Stability using Temperature-Responsive Poly (N-Isopropylacrylamide)

    By M. Jackman

    "Froth stability is critically important for an effective separation of fine and ultrafine particles using column flotation. While a desirable froth stability is required to facilitate the drainage of

    Jan 1, 2016

  • CIM
    Quality Assessment/Quality Control (QA/QC) for Resource Estimation at Inco Technical Services Limited

    By Christopher R. Davis

    Resource modelling is the basis for any economic appraisal of a mining project and includes a number of steps from data acquisition and validation to resource reporting and classification. At each s

    May 1, 2001