Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geotechnical assessment of the southeast wall slope failure at Highmont Mine, British Columbia

    By H. Warren Newcomen, Dennis C. Martin

    "This paper describes the investigation of a large, progressive slope failure on the southeast wall of the east pit at Highmont Mine, British Columbia Geotechnical investigation s consisted of geologi

    Jan 1, 1988

  • CIM
    The Emerald Lake concentrator design and commissioning

    By Gary Hawthorn

    "Laboratory testing, by Lakefield Research determined that, in spite of the relatively high pyrite content of the Golden Rose (GR) orebody, it would respond well to gravity concentration followed by e

    Jan 1, 1989

  • CIM
    Blasthole stoping for narrow vein mining

    By Y. Lizotte

    "This paper examines the application of blasthole sloping to narrow vein mining in Canada, for ore deposits where widths are less than two metres. While the technique has now been utilized for more th

    Jan 1, 1991

  • CIM
    Nor-Acme Mine (38a3a98c-c47b-464f-b6c8-c0ff6e104948)

    By J. M. Harrison

    "The Nor-Acme gold mine is near the shore of Snow lake, northern Manitoba, about 75 miles east of Flin Flon. The claims that form the nucleus of the present property were staked in 1927 by C. R. Parre

    Jan 1, 1954

  • CIM
    Treatment of ferro-manganese fines in an extended arc flash reactor

    By A. McLean, D. K. A Donyina, R. S. Segsworth

    "Various aspects of processing ferro-manganese fines generated during the crushing of standard ferro-manganese have been studied in laboratory-scaleplasma furnaces. These laboratory furnaces are based

    Jan 1, 1982

  • CIM
    Energy as a production input in the industrial minerals industry past and future requirements

    By Barry James

    "This paper discusses past and current energy use patterns in the mining and manufacturing sectors of the industrial minerals industry. Information is presented on the primary energy input types as pu

    Jan 1, 1981

  • CIM
    New Perspectives in Gold Catalysed Oxidation

    By Serena Biella

    Gold has received a growing interest as a catalyst for the selective oxidation of organic molecules using oxygen under mild conditions1. In the liquid phase application small gold particles (2.5-7 nm)

    Oct 1, 2003

  • CIM
    Plant Ramp-Up Profiles an Update with Emphasis on Process Development

    By Terry McNulty

    "Previous papers (McNulty 1998 and 2004) have dealt with the causes of successful and less successful achievement of design production rate by new processing plants in the minerals industry. Examinati

    Jan 1, 2014

  • CIM
    Advances in Process Development for Concentration of Rare Earths and Niobium for Geomega’s Montviel Carbonaceous Ore

    By T. Negeri, M. Boisclair, A. Bouajila

    CanmetMINING has been working on process development for separation and concentration of rare earth bearing minerals from various ores. Among others, the flowsheet development for the Montviel Rare Ea

    Jan 1, 2014

  • CIM
    Recovery of Low-Grade Waste Heat from Smelter Process Water Streams Using Heat Pumps

    By G. M. Ross, I. M. Ross, J. A. Scott

    "The otherwise waste heat in many water streams in the mining industry can be used to provide space heating of adjacent infrastructure including laboratories, workshops, and offices. This can be achie

    Jan 1, 2016

  • CIM
    Innovative Mine Safety Training and Mining Engineering Education Using Virtual Reality

    The University of New South Wales (UNSW) has been a world leader in the development of innovative virtual reality technologies over the last 10 to 15 years. These developments have included developing

    Aug 1, 2013

  • CIM
    Stress Measurement: The GRC Perspective

    By N. Bahrani

    Knowledge of the state of stress in the Earth?s crust is very important to the safe and efficient development of underground excavations in mining and civil engineering projects. A number of methods h

    Aug 1, 2013

  • CIM
    Case Study – Blind Shaft Sinking for BHP Jansen Project

    By Patrick Rennkamp, Wolf-Dieter Trodel, Andy Fearn

    "The Jansen shafts are completed using purely mechanical excavation. This paper summarises the geology, a description of the shafts, the method used for excavation and the results achieved along with

    Jan 1, 2019

  • CIM
    Narrow Vein Stoping at No. 2 Mine, Central Patricia Gold Mines, Limited

    By J. R. MacDonald

    MINING literature contains very few descriptions of operations producing as little as 25 to 30 tons of ore per day. The purpose of this paper is to discuss the gradual development of a mining method f

    Jan 1, 1941

  • CIM
    Rapid Development in Canada: Myth or Reality? An Underground Mining Contractor’s Perspective

    By P. Hickey, G. Hubert, P. Healy

    "J. S. Redpath Limited, an underground contractor with a worldwide presence, has implemented innovative techniques in various projects in Canada to shorten the development cycle. Conventional methods

    Jan 1, 2016

  • CIM
    Development, Testing and Applications of an Induction-Balance Sensor for Low-Grade Nickel Ores

    By D. J. Houlahan

    ABSTRACT Sorting has the potential to massively improve the pro?tability of mining base metal, hard-rock ores. However, several barriers to the increased application of sorting have been identi?ed, in

    Jan 1, 2010

  • CIM
    Investigation of Permascand Coated Titanium Anodes in Copper Electrowinning at Glencore Nikkelverk

    By J. Gustavsson, S. Holmin, Å. Afvander, E. Rosseland, E. Zimmerman

    There are numerous advantages in replacing lead-based anodes with mixed metal oxide (MMO) coated anodes in copper electrowinning; for example, lower energy consumption, improved working conditions for

    Jan 1, 2019

  • CIM
    Current and future demand for aggregate in the Edmonton region

    By W. A. D. Edwards

    "The Edmonton region accounted for 40% of Alberta's sand and gravel production in 1981 (about 12 million m3). Most of this production was by commercial operations (75%) for use in essential publi

    Jan 1, 1989

  • CIM
    Centrifuge model studies of fill pressures on temporary bulkheads

    By R. J. Mitchell

    "The use of hydraulically delivered classified tailings sands to provide ground support in large mining operations is still widespread despite recent developments of alternate backfilling methods and

    Jan 1, 1992

  • CIM
    Maintenance Engineering ? Mine Operators Conference

    Presentation Topics ? Low and Intermediate Level Waste ? Project Location and Site ? Geological Setting ? Key Features ? Project Overview ? Licensing and EIS ? Next Steps DGR Waste Package Inv

    Oct 1, 2010