Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    McWatters mine

    By M. E. Wilson

    "The property of McWatters Gold Mines, Limited, is in the east-central part of Rouyn township and about 6 miles east-southeast of the town of Rouyn. It includes 35 claims, the group of 5, staked origi

    Jan 1, 1954

  • CIM
    A Golden Opportunity for CSR in South Africa - Placer Dome?s Care Project at the South Deep Mine

    By Jim Cooney

    Background ?1990s saw massive changes in South African mining industry ?over 100,000 jobs lost as the industry restructured; ?1999 ?Placer Dome purchased a 50% interest in South Deep (WAL), a mine l

    May 1, 2006

  • CIM
    Co-Production of Heavy Minerals from Oil Sand Tailings

    By Mel Owen, Bob Tipman

    "A number of studies have identified the presence of heavy minerals in the Athabasca oil sands. A 1996 Mineral Development Agreement study into the recovery of Co-Products identified low operating cos

    Jan 1, 1998

  • CIM
    Improved rock Drill bit Design

    By Irvine J. Berscheid

    This paper describes a rock drill bit which, although conventional in the processes of manufacture and use on the job, has incorporated into the outer wall or periphery of the insert, where wear is al

    Jan 1, 1965

  • CIM
    Poisson Impedance as a Rock Physics Attribute for Developing Geomechanics Earth Models: Case Study from Southwest Iran

    By SeyedBijan Mahbaz

    Development of Geomechanical Earth Models (GEM) is a prerequisite to reservoir management, involving issues such as stress path analysis, prediction of induced seismicity and sanding initiation, and c

    Jun 1, 2012

  • CIM
    A Coupled Thermal-Fluid Flow- Multicomponent Model to Simulate the Melting/Dissolution of Solid Tial in Liquid Titanium During Electron Beam Melting

    By Ainul Akhtar, Steve Cockcroft, Daan Maijer, Carl Reilly, Lu Yao, Jun Ou

    A coupled thermal-fluid flow-multicomponent model has been developed to aid in understanding the melting/dissolution behavior of solid Al-rich Material (TiAl) in a liquid titanium pool produced by an

    Jan 1, 2014

  • CIM
    Adapting Mill Control to Account for Liner Wear on the Cadia 40ft Mill

    By Hilden. M.

    "As the Cadia mill was the first 40ft diameter SAG mill, commissioned in 1998, its performance, liner and discharge design attracted considerable international attention. Twelve years on, the liner de

    Jan 1, 2012

  • CIM
    Petrochemistry in the Exploration for Volcanogenic Massive Sulphide Deposits

    By Steve Piercey

    Introduction ? VMS Deposits: The Target ? Key points for every belt: heat flow and extension. ? Good felsic rocks ? Good mafic rocks. ? Petrochemical assemblages. ? Summary Key Points Through

    Apr 1, 2005

  • CIM
    Heat Balance Control Changes- Further Steps and Safety Issues

    By T. Kho, W. Zhang, M. E. Reed

    The control of flash furnace heat balances is critical. Suspension smelting control and stability comes from stable operation of the heat balance, and this leads to a stable reaction shaft exit temper

    Jan 1, 2019

  • CIM
    Application of a dynamic material balance program to an industrial flotation circuit

    By A. R. Trusiak, C. Bazin, D. Hodouin

    "The On-Stream Analyzer has proven, and is still proving to be, an extremely valuable tool for the control of flotation circuits. This paper examines the possibility of going further in the utilizatio

    Jan 1, 1995

  • CIM
    Une mine à Madagascar: Les défis de la biodiversité.

    By Benoit Taillon

    Contenu de la presentation 1. Le projet QMM et son contexte 2. Gérer la biodiversité 3. Résultats obtenus QMM QIT Madagascar Minerals S.A. ? JV: Rio Tinto (80%) et Madagascar (20%) ? Trois gise

    May 1, 2011

  • CIM
    The leakage and absorption of radon in laboratory apparatus

    By R. H. McCorkell

    Measurements of radon in air and aqueous solutions can be affected by leakage from vessels in which samples and standards are kept and by absorption and later release of radon by the materials of thes

    Jan 1, 1980

  • CIM
    Peirce-Smith Converters: Automation, Design, Operation and Environmental Improvements at Kansanshi Copper Smelter

    By David deVries, James Rajith, Paul Mascrenhas, Nurzhan Dyussekenov, Lawrence Hanschar

    Kansanshi Copper Smelter commenced operation in March 2015. The smelter features four Peirce- Smith Converters (PSCs) operated in a three hot, two blowing configuration. This paper describes some of t

    Jan 1, 2019

  • CIM
    Effective Modeling and Estimation of Stratified Deposits

    By Garth D. Kirkham

    The Problem The Don deposit is a series of two sub-vertical zones that pose a number of challenges with respect to modeling and interpolation. The first challenge is that, based on data and observa

    May 1, 2013

  • CIM
    Difficult Gold Gravity Separations an Update

    By J. Ling, J. Xiao, A. R. Laplante

    "The most challenging gold gravity separations occur when gangue has a high s.g., gold is fine, or a combination thereof This paper examines such separations, and evaluates the performance of a 3-in K

    Jan 1, 1998

  • CIM
    Jameson Cell Testing at the Kidd Creek Concentrator

    By R. Tremblay, M. Burrows

    "In the summer of 1990, pilot scale testing of a Jameson cell was carried out at Falcon bridge Limited, Kidd Creek Division. The Jameson cell is self aspirating and has fewer mechanical parts, thus it

    Jan 1, 1993

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing

    By M. Redfearn

    "DUST COLLECTION EQUIPMENT LIST Primary Dust CollectorModular Mikro-Pulsaire - Model 2G1-96TR Capacity: 20,000 c.f.m.Bags: Total of 288; 8' x 4 1/2"" diameterMaterial: Dacron HCE feltAir to cloth rati

    Jan 1, 1976

  • CIM
    Water management simulation for the Pogo Gold Mine

    By G. Beckstead, L. Gormely, R. Zimmer, K. Hanneman, B. Nethery

    As part of the EIS and permitting activities for the Pogo Mine in Alaska, a risk assessment study for the water management plan was carried out. The basis for the study was a site water volume and con

    Jan 1, 2005

  • CIM
    Effects of transport limitations and non-uniform catalyst distributions in PEM fuel cells: Modelling and numerical analysis

    By D. H. Schwarz

    The performance of proton exchange membrane (PEM) fuel cells depends on catalyst layer composition and structure. Experimental observations reveal that state-of-the-art catalyst layers consist of micr

    Jan 1, 2005

  • CIM
    Heap Leaching of Gold Ores in Permafrost Conditions

    By V. I. Lakshmanan, I. G. McColl

    "Heap leaching of gold ores in permafrost conditions is feasible provided certain criteria are met. These criteria include relatively short heap leach residence time and the availability of waste heat

    Jan 1, 1987