Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Post-Pillar Design for Overhand Cut and Fill Mining in Moderate to High Stress Conditions – A Case StudyBy M. Yao, D. Thibodeau
"Selective mining, such as post pillar cut and fill, is used in large, flat, irregularly shaped ore bodies where ground stability is to be maintained. This selective mining is used to open the stope t
Jan 1, 2015
-
Oil-Shales of CanadaBy S. C. Ells
Within the Dominion of Canada occurrences of petro-liferous shales have been known for many years. Nevertheless, with the exception of a comparatively brief period, Canada has had to depend largely on
Jan 1, 1925
-
Hadean Uranium Activity 3rd International Conference on Uranium (Uranium 2010), 40th Annual Hydrometallurgy MeetingBy Therese Schneck
The presence of xenon isotopes from in-situ spontaneous fission of short-lived Pu244 has been confirmed in Hadean detrital zircons from Western Australia. Hadean and meteoritic zircons can retain seco
Aug 1, 2010
-
Development of BIM and Automation Based Total Process For Infra Construction ? The State of the Art in FinlandBy R. Heikkilä
A large research and development program called RYM PRE (Process Re-Engineering) has been active in Finland since 2010. As a part of the program, a work packet Infra FINBIM is focused on the developme
Aug 1, 2013
-
A New Method of Mounting Polished Sections of Mill ProductsBy Ellis Thomson
The microscope is now used extensively not only in the examination of solid ore but also in the determination of fragmental mill products. It has therefore become a matter of paramount importance to b
Jan 1, 1926
-
A preliminary assessment of unconsolidated mineral resources in the Canadian offshoreBy Patrick Mclaren, Peter B. Hale
Canada, with one of the largest continental shelf areas in the world, has done little to evaluate its offshore unconsolidated mineral resources which include heavy minerals (gold, chromite, rutile etc
Jan 1, 1984
-
Principal developments in the automatic control of mineral processing systems (54388b94-9550-459c-8f95-392bceb3d752)By A. Galip Ulsoy, K. V. S. Sastry
"This review paper is intended to provide, the mineral process engineer with an introduction to the concepts, terminology. and practice of mineral process control. It also provides an extensive sampli
Jan 1, 1981
-
Principal developments in the automatic control of mineral processing systemsBy A. Galip Ulsoy
This review paper is intended to provide, the mineral process engineer with an introduction to the concepts, terminology and practice of mineral process control. It also provides an extensive sampling
Dec 1, 1981
-
Suppression of Abnormal Grain Growth in Friction-Stir Welded 6061-T6 Aluminum Alloy by Pre-Strain RollingBy S. Malopheyev, I. Vysotskiy, R. Kaibyshev, S. Mironov
"In this work, the effect of pre-strain rolling on the annealing behavior of friction-stir welded 6061-T6 aluminum alloy was studied. To this end, the as-welded material was rolled to 10 or 20 pct. of
Jan 1, 2018
-
The Goldstrike pressure oxidation plant process and engineering design, construction and commissioningBy K. S. Fraser, H. J. H. Pieterse
"A pressure oxidation plant to pretreat refractory sulphide ore at the Goldstrike plant in Nevada, was commissioned in early February 1990. The plant, with a nominal capacity of 1363 t/d, was commissi
Jan 1, 1992
-
Grinding mills-installation and maintenanceBy J. George Gregr
"This paper gives a brief review of grinding mills installation procedures with special emphasis on future maintenance. The importance of cooperation between the customer, construction contractor and
Jan 1, 1985
-
A Simple And Novel Approach For The Sizing And Modeling Of Countercurrent Multistage Ion-exchange Contactor SystemsBy Bertrand Quiniou, Pierre Amadieu
Ion exchange technologies and processes are proven and established technologies widely used in numerous industries including hydrometallurgy for metal separation and recovery from metal bearing soluti
Jan 1, 2020
-
Cretaceous clay and sand deposits in central Nova ScotiaBy RALPH R. STEA, John H. Fowler
Clay, quartz sand and lignite deposits overlie Carboniferous rocks in central mainland Nova Scotia. Recent evidence indicates that these deposits are fairly extensive. Sands consist of almost pure ang
Jan 1, 1984
-
Shaft Sinking Through Heavy Overburden at FalconbridgeBy R. M. Oliver
THE Falconbridge property is almost completely covered with over-burden to a depth varying from 60 to over 200 feet. This overburden consists of grave], sand, and boulder, with bands of very fine silt
Jan 1, 1938
-
The Social Dimension of Sustainable Development and the Mining IndustryBy Lise-Aurore Lapalme
Structure of the Presentation ? sustainable development and its social dimension ? challenges that mining is facing ? responses by industry ? corporate social responsibility ? the role of govern
May 1, 2002
-
Investigation of Y-doped BaCeO3 as electrolyte in propane fueled proton conducting solid oxide fuel cellBy Y. Feng
Perovskite structured oxide 15% Y-doped BaCeO3 (BCY15) has been evaluated for use as proton conducting electrolyte in SOFC with propane as the fuel and Pt as both electrodes. Under the fuel cell condi
Jan 1, 2005
-
Anisotropy Measurements in a Core Sample by Using Pulse Transmission MethodBy Jaime Meléndez Martínez
Recent interest in unconventional reservoirs motivates our work in laboratory measurements of seismic anisotropy. Seismic anisotropy is the variation in speed of a wave as a function of its direction
Jun 1, 2012
-
Sulphide dust explosions at falconbridge two case historiesBy G. A. Moruzi
Two sulphide dust secondacy explosions have occurred in the mines of the SUdbury operations of Falconbridge Ltd. during the past 18 months. 'Ihe main similarity between the occurrences is that they bo
May 11, 1988
-
Strategies and innovation in ocean transportationBy H. R. Stoger
"In 1994 world trade grew by 9%, the fastest annual increase since 1976. Dry cargo shipping rates are at an all time high.Panamax size bulk carriers are receiving19 000 US dollars per day for trans At
Jan 1, 1996
-
Development of BIM Based Rehabilitation and Maintenance Process for RoadsBy R. Heikkilä
The utilization of Building Information Modeling (BIM) and model based 3-D control of work machines have increased a lot in new road construction in Finland as well as in other Nordic Countries. Up to
Aug 1, 2013