    Effect of environmental variables on pitting corrosion

    By S. Rajeswari, D. Gopi

    "Pitting corrosion inhibition of 304 stainless steel (SS) in groundwater with a ternary inhibitor mixture (phosphonic acid + bivalent cation + various surfactants) was studied with different environme

    Jan 1, 2003

  • CIM
    The Texasgulf Concentrator Expansion

    By A. M. Hill

    "This is an account of the expansion of Texasgulf's Timmins concentrator by the building of a fourth circuit.The original capacity of the mine and concentrator was 3.6 million tons per year of ore. In

    Jan 1, 1979

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems

    By M. W. Grabinsky

    Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su

    May 1, 2007

  • CIM
    Collector Consumption Heads or Tails

    By J. A. Meech, R. J. Tucker

    "Since the establishment of froth flotation as an effective method of mineral beneficiation there has been both academic and industrial interest in the levels of the various reagents required to perfo

    Jan 1, 1984

  • CIM
    MillMapper - A Tool for Mill Liner Condition Monitoring and Mill Performance Optimization

    By Jochen Franke, Derek D. Lichti

    "This paper gives a brief introduction and presents recent enhancements in the MillMapper technology developed for thickness gauging and condition monitoring of liners in grinding mills used for miner

    Jan 1, 2008

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    Influence of Shear Surface Geometry on Deformation Processes in Massive Landslides

    By K. S. Kalenchuk

    Massive landslides display complex deformation processes. For instance, slope movements of the Downie Slide, monitored using borehole inclinometers, extensometers, and survey monuments, show considera

    May 1, 2009

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    Follow-up of Production Equipment Availability and its Contributing Factors in Selected Canadian Underground Mines

    By Edith Lafontaine

    Modern underground mines operate fleets of mobile production equipment including drill jumbos, long-hole drills, load-haul-dump machines, trucks and bolters. Their availability has a substantial impac

    May 1, 2007

  • CIM
    Modelling and Resource Estimation of a Thin-Layered Lignite Deposit

    By Ioannis K. Kapageridis

    The lignite deposits of the Kozani-Ptolemais-Amyntaio basin in western Macedonia (North-West Greece) present a difficult modelling problem. Each deposit consists of several thin lignite layers ranging

    Oct 1, 2009

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles

    By L. Bloomquist

    This paper describes how Automated Mining Systems (AMS) is evolving the state-of-the-art in guidance systems for autonomous underground vehicles. The techniques, trade-offs, and lessons learned from t

    Jan 1, 2004

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles (8e8c3b94-ac75-4947-840c-a59d92585998)

    By L. Bloomquist, C. Arnoldi

    "This paper describes how Automated Mining Systems (AMS) is evolving the state-of the- art in guidance systems for autonomous underground vehicles. The techniques, tradeoffs, and lessons learned from

    Jan 1, 2004

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • CIM
    Operation of La Mine Doyon

    "At a current mining rate of 3,750 tons per day, La Mine Doyon is currently the largest gold mine in Canada. La Mine Doyon is an open pit gold mine located in the Abitibi area of Northwestern Quebec.

    Jan 1, 1984

  • CIM
    Fuel cell risk assessment, regulatory compliance, and implementation of the world’s first fuel cell-powered mining equipment at the Campbell Mine (2f329a25-0d4f-40d5-a572-5230f6f201ab)

    By T. MacKinnon, M. C. Bétournay, D. Eastick, F. C. Delabbio, C. Graves

    "The successful implementation of a new technology in an underground production mine requires many challenges to be overcome. These challenges include mine hardening of new technology, mitigation of s

    Jan 1, 2005

  • CIM
    The Millennium Iron Range Project

    By Robert Martin

    New Millennium ?a new project for an experienced mine building team ?Owns 100% of KeMag(Harris Lake) property ?Owns 80% of LabMag(Howells River) property -20% owned by Naskapi Nations of Kawawachika

    May 1, 2007

  • CIM
    Crystallex’s Las Cristinas gold project

    By J. R. Goode

    "The Las Cristinas deposit in Venezuela contains reserves of 12.8 million ounces of gold at a grade of 1.20 g/t (Crystallex, 2004). The deposit comprises fully oxidized saprolite (SAPO) overlying a la

    Jan 1, 2005