    Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mine

    By C A. Brannon, C A. Dipas, H A. Vega, D Villa

    The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full

    Oct 16, 2017

  • AUSIMM
    Modelling Open Pit and Underground Production Scheduling in Concert

    By B King

    A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti

    Nov 24, 2014

  • AUSIMM
    Organic Management Structure – Its Advantages in a Mining Consultancy

    By G Pitkin, D Sorley

    The purpose of any consultancy is to provide a superior service for their client. Organisational structure is a key element in providing this service and differentiating between consultants.In an orga

    Jun 22, 2016

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Getting underground: design and construction of a portal in a pit with moving walls

    By J Player, P Evans, G Sweby

    Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c

    Mar 15, 2021

  • AUSIMM
    The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope Design

    By A Muhairini, M Eggers, J Smith, H Baxter

    Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au

    Jul 13, 2015

  • AUSIMM
    Development and implementation of a long tendon bolting system utilising resin grouting technology

    By T Sprague, D Pateman

    "The Gosowong Gold Project is owned and operated by PT Nusa Halmahera Minerals (PT NHM), an Indonesian company 75 per cent owned by Newcrest. It is located on Halmahera Island, in the North Maluku Pro

    Oct 16, 2017

  • AUSIMM
    Grinding Circuit Improvements at Evolution Mining’s Edna May Operation

    By D Atheis, S Williams, A Dance, D Taplin

    "Resurrected from its former life at the Big Bell operation, the grinding circuit at Evolution Mining’s Edna May operation in Western Australia has many a story to tell. The task of optimising a plant

    Sep 1, 2014

  • AUSIMM
    Titanium Feedstocks – Opaque Quality Requirements

    By D McCoy

    Titanium feedstocks are the building blocks of the titanium value chain. They can be mined directly, as is the case for ilmenite, leucoxene and rutile, or manufactured from ilmenite by extracting vari

    Oct 5, 2011

  • AUSIMM
    Unlocking mine productivity by changing-the-equation on the where, what and when of orebody characterisation

    By S Warden, T Neville, P Leckie

    At its simplest, the classification and characterisation of an orebody is a matter of Where, What and When. Where and with what spatial resolution are measurements taken, What properties are measured,

    Sep 1, 2024

  • AUSIMM
    Quantification of surface sensor representivity of primary crushed ore for bulk ore sorting

    By J Rutter, D Francois-Bongarcon, M Federov, N Odiar, M Scott

    There are two fundamental methods for metalliferous sensing of primary crushed ore available for deployment at operations. These methods can be classed as surface measurement techniques (including XRF

    Nov 10, 2020

  • AUSIMM
    Iron Ore Washing – Achieve More with Fewer Resources

    By M Zlatev, S Silge

    Producers of primary resources such as iron ore face the challenge of processing crude materials with increasing levels of impurities, which may result in the requirement for wet processing. This resu

    Jul 13, 2015

  • AUSIMM
    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production Scheduling

    By P Cesare, S Munro, D Wandel, R A. Bearman

    Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t

    Nov 24, 2014

  • AUSIMM
    Strain-dependent Stiffness of the Weathered Melbourne Formation

    By Z Terzic, M Schult, D Chu, S Macklin

    The East West Link road tunnels are proposed to provide a connection between the CityLink toll road and the Eastern Freeway north of the Melbourne CBD. The alignment passes from Moonee Ponds valley be

    Sep 17, 2014

  • AUSIMM
    Comparison of the Generation of Shear Wave with Different Simulation Approaches

    By M Chen, Q D. Gao, Y G. Hu, P Yan, W B. Lu

    The safety and stability of construction structures are often affected by blast-induced waves. Investigating the generation mechanism of shear wave (S-wave) during blasting is important, because it ha

    Aug 24, 2015

  • AUSIMM
    Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons Learnt

    By P Marlow

    Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su

    Mar 21, 2011