Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Assessing corrosion of reinforcement on a large scale

    By N Power, R Hassell, E Jones

    Wiluna Mining Corporation are progressively re-entering the old Wiluna underground mining complex. The existing underground was abandoned in 2013 by previous owners and left to flood with water levels

    Nov 29, 2022

  • AUSIMM
    The Kharmagtai Porphyry Breccia Complex – Characteristics of Early Carboniferous Porphyry Mineralisation in the Gurvansaikhan Belt, Southern Mongolia

    By A L. Stewart, M Baatar

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.The Middle Palaeozoic Gurvansaikhan Belt (Southern Mongolia) of the Central Asian Orogenic B

    Mar 18, 2015

  • AUSIMM
    The Primary Framework for the Mechanism of the Mine Reclamation Monitoring in China

    By Y Zhou, Y Liu, J-P Yang, P Wang, K Hu

    "Large-scale mine reclamation has taken place recently in response to the implementation of mining regulations in China. Effective monitoring of the progress of reclaimed land is a critical procedure

    Jul 10, 2012

  • AUSIMM
    The Effect of Aground-Underground Seamlessly Integrated Modelling in Mine Disaster Prevention

    By Y S. Zhang

    Natural phenomena and human engineering construction activities had great influence on the geosciences space. Natural disasters, particularly mine disaster and other geological disasters happened freq

    Nov 22, 2011

  • AUSIMM
    Improving crusher throughput using a problematic ore index based on simple, first principles geology

    By T Walton, C Perring, M Pepper, G Gerber

    The Yandicoogina Channel Iron Deposit (CID) is an accumulation of iron pisolites cemented by a goethite-rich matrix. The Yandicoogina CID’s are found in a palaeochannel that meanders within a broad st

    Mar 22, 2022

  • AUSIMM
    Reverse circulation drill commissioning at Lihir open pit to provide data for medium term planning

    By M Akop, G Phillips, L Elliott

    An estimation geologist has many tools in their kit and using the correct one for the job is vital for creating a useful model. Reconciliation is a key step to monitor the performance of a resource mo

    Mar 22, 2022

  • AUSIMM
    Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave Mines

    By S Talu, E Savage, P Sturm, A van As

    It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety

    May 9, 2016

  • AUSIMM
    Effective Domain Selection for Grade Control in Narrow Vein Gold Deposits

    By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks

    Effective domaining is fundamental to geostatistical modelling for grade control. Through analysis of lithological, structural and alteration logging data, effective groupings (domains) can be identif

    Aug 18, 2014

  • AUSIMM
    Energy Efficiency Opportunities in Milling – Improving Comminution Circuit Efficiency

    By F Musa

    One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput

    Aug 8, 2011

  • AUSIMM
    Evolution of the modern surge-bin in mineral processing plants with highly variable feeds

    By J Lyons, S Baker, D MacHunter, D Pepper

    Mineral processing plants require a storage buffer to bridge differences in production rates between mining and processing. Where coarse ores are processed, such as coal or hard rock, this buffer may

    Aug 24, 2022

  • AUSIMM
    Back analysis of pit slope performance in a saturated alluvial sediment

    By J Player, G Sweby

    The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined

    Jun 22, 2022

  • AUSIMM
    Preventing unwanted events critical controls – success and failure in implementing the ICMM guidance

    By A P. Wilkinson

    This paper reports on the implementation of the critical control concept to manage material risks in the mining and metals industries. The critical control management (CCM) approach assumes it is bett

    Apr 16, 2024

  • AUSIMM
    Managing Coal Loss Using Blast Models and Field Measurement

    By P Brown, M Nagarajan, A Green, P Dare-Bryan

    Coal loss is an important issue at many coalmines, with losses of five per cent being common. The type of loss varies from mine to mine but is dependent on mine strata, the drilling and blasting proce

    Aug 24, 2015

  • AUSIMM
    Semi-automated Geological Interpretation Using Assay and Infrared Spectroscopic Sensing Parameters towards Improvements in Geological Modelling

    By F Flitti, M Haest, O Dominguez, D Mittrup, G Hird

    The automated geology interpretation (AGI) tool has been developed in BHP Billiton to automate stratigraphy logging of drill holes, using any available quantitative data sets. At present, AGI is set-u

    Jul 13, 2015

  • AUSIMM
    Material handling testing and control system requirements for dry stack tailings

    By R Stefansen, T Wisdom, A Nicholson, K Rahal

    The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F

    Jul 23, 2018

  • AUSIMM
    Impact testing of raise bore protection mesh

    By M Doran

    The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3

    Mar 29, 2023

  • AUSIMM
    A guide to ground disturbance permitting and managing ESG risk

    By H Arvidson, B Spence, S Helm

    Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc

    Sep 18, 2023

  • AUSIMM
    Visual Communication of Geological Confidence - A Move Toward a Less Subjective Approach

    By J Seery, N Savage, A Wilson, L Nicholas

    Geological modelling provides a means of spatially representing the three dimensional distribution of geological information to downstream stakeholders. The geologist completing the modelling work int

    Aug 12, 2013

  • AUSIMM
    Automated Multi-Drills in Rio Tinto

    By C McHugh, F Oppolzer, B Rogers, A Stokes

    Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation has more to do with improving the accuracy and consistency of mining pr

    Sep 18, 2012

  • AUSIMM
    BioHeap® – Breaking the Grade/Recovery Curve for Nickel Concentrators

    By J Fewings, T McCredden, S Seet, C Fitzmaurice

    "Flotation of nickel sulfide ores are generally constrained by nickel grade and impurity concentrations (notably magnesium and arsenic) in the product delivered to smelters. Being a physical separatio

    Oct 10, 2016