Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fire Modelling in Underground Mines using Ventsim Visual VentFIRE Software
By D J. Brake
The risk from fire remains one of the most serious of underground mine disaster scenarios. The impacts of mine fires on the underground ventilation system and the production of toxic gases have been d
Jul 1, 2013
-
Leading people to use their brain as PPE
By C Sylvestre
Leaders have invested heavily in traditional safety management to improve safety performance over the years. This primarily involved: • fixing the environment (eliminating the hazard) • improving the
May 5, 2022
-
The Status of Implementation of Proximity Detection Systems in Underground Mines
By D Kent
The introduction of digital technologies into the underground mining industry, in both coal and hard rock mining, has enabled many high bandwidth applications to be adopted by mines.Digital networks b
Mar 21, 2011
-
Re-Invigorating Unloved Projects
By D Price
Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op
Aug 22, 2011
-
Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral Sands
By T Wambeke, J Benndorf
A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att
Nov 24, 2014
-
An Overview of Surface Rock Support for Deformable Ground Conditions
By M P. Sandy, V Louchnikov, V Eremenko, M Orunesu, O Watson
"Surface support is a key component of most ground support systems which are applied as a means of reducing the risk of rockfall occurrence and maintaining serviceability of mine development. Surface
Mar 24, 2014
-
Pacific Rim Epithermal Au-Ag
By G Corbett
Epithermal Au-Ag deposits form in the upper 1 km of the crust and are therefore best preserved in the less eroded Pacific rim arcs, although also recognised elsewhere. Two profoundly different ore flu
Sep 26, 2013
-
Application of Different Drive Systems for Horizontal Mills
By M Neurohr, B Wacker, D Mensing, C Murphy, W Kitz
Mining operations have large power requirements. The biggest consumers of energy are the drives for the mills located in the concentrators. Assuming that the decision is made on how many mills are nee
Jul 13, 2015
-
Adaptation of an Open Pit Optimiser for Underground Strategic Planning
By M Bloss, B Roberts
BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so
Nov 24, 2014
-
Case Study of Iron Ore Value Chain Optimisation
By J Foo, T Kleinschmidt, B Reynolds, K Kennewell
The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the
Jul 13, 2015
-
Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative Subset
By J Deraisme, P Epinoux, O Bertoli
"Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr
Nov 24, 2014
-
A More Holistic View of Mill Liner Management
By N Weerasekara, M Bird, M Yahyaei, M M. Hilden, M S. Powell, J Franke, P Toor
The combination of new tools with a more rigorous approach to understanding the interaction of mill liners with overall mill performance and economics, forms the basis of an integrated approach to lin
Oct 29, 2012
-
Case study of a practicable, risk-based solution in response to new regulatory approaches to Mining Health and Safety using Queensland Recognised Standard 22 (Management Structure for the development and implementation of the SHMS)
By S Amor, A Beasley
This paper provides an example of how industry can respond to the implementation of new regulatory approaches to mining risk, health and safety by adopting a robust, practical, software-based approach
Apr 16, 2024
-
Thiosulfate Processing - From Lab Curiosity to Commercial Application
By J Langhans, Y Choi, Q Wang, J Y. Baron, P Kondos
Barrick has successfully developed the thiosulfate leaching process to treat sulfidic high preg-robbing ores. The process was developed through rigorous bench test programs and proved in pilot campaig
Sep 26, 2013
-
Rock Deformation and Mineralization at Mount Isa
By Hall G
The Mount Isa silver-lead-,zinc deposit possesses a number of features which sets it apart from usual occurrences of ores containing those metals. The deposit has been described in vario:us papers, bu
Jan 1, 1942
-
Reducing ventilation change downtime and increasing operational uptime
By J A. Rowland
When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during
Oct 12, 2022
-
Predicting Iron Ore Fines Shipment Moisture
By J E. Everett, D Linden, P Maney
In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for
Aug 12, 2013
-
Integrating Environmental Impact Assessment into Life-of-Mine Planning
By J Jones, J Blunt
"The requirement for environmental approvals and associated environmental impact assessments (EIAs) is now commonly regarded as a key milestone and body of work during project development. EIAs can be
Jul 10, 2012
-
Mines versus Mineralisation – Deposit Quality, Mineral Exploration Strategy and the Role of ‘Boundary Spanners’
By J P. Sykes, T C. McCuaig, J E. Vann
Resources added to the global metal inventory through exploration over the past 15 years have been generally of poor quality (declining grades, recoveries and lack of acceptable financial return). Sim
Aug 18, 2014
-
George Fisher Mine - Feasibility and Construction
By G S. B Karunatillake
Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million
Jan 1, 2000