Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    Mining Administration and Legislation

    This paper discusses some topical issues on the mining administration and legislation fields including:  1. Licensing û Administration and associated specialist functions including:Processin

    Jan 1, 1982

  • AUSIMM
    Site Water Balance Response to Variable Climatic Conditions

    By S Hawker, M Gibbs, A Craven

    Current climate change projections suggest both an increase in the intensity of significant rainfall events and an increase in the variability of rainfall in some regions of Australia. It is necessary

    Nov 26, 2013

  • AUSIMM
    Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper Operations

    By D Kent, J Bullock, M Wilkinson

    Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su

    Oct 16, 2017

  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Drilling Techniques for Resource Estimation of Mineral Sand Deposits

    By M Z. Abzalov

    Drilling mineral sand deposits has specific challenges, which are different from drilling hard rock deposits: Drilled sequences are represented by non-consolidated free-flowing sands to semi-conso

    Oct 5, 2011

  • AUSIMM
    Spatial distribution of major, minor and trace elements in iron ores, using micro-XRF technology

    By N J. Potter, N W. Brand, J M. F Clout

    The increasing demand for iron ore with low concentrations of trace elements, puts increasing pressure on iron ore producers for high-quality material. Understanding the mineralogy, petrography, chemi

    Nov 8, 2021

  • AUSIMM
    Iran Mining Industry Based on the 20-Year Perspective 2025

    By F Rashidinejad

    Iran has had an active mining sector for some 7000 years. Exceptional in terms of its mineral diversity, Iran produces 62 minerals, and is ranked among the world’s 15 most mineral-rich countries. Many

    Nov 22, 2011

  • AUSIMM
    A generalised form of Gy’s equation for gold ores – empirical evidence

    By R C. A Minnitt

    The two methods for calibrating the parameters K and (alpha) for use in Gy’s equation for the fundamental sampling error (FSE), the duplicate sampling analysis (DSA) and the segregation fractionalised

    May 9, 2017

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Justification for Integrating Mechanical Sampling with Online Analysis

    By D W. Stevens

    Mechanical sampling provides a definitive value for the product sampled but the results are not instantaneous, meaning that decisions on process control can only be made hours after the sample is take

    Jul 29, 2014

  • AUSIMM
    A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental Assessment

    By M Ind, B Usher

    Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture

    Jul 16, 2014

  • AUSIMM
    Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving Constructability

    By E Rubio, N Morales

    A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the

    Sep 26, 2011

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Leading people to use their brain as PPE

    By C Sylvestre

    Leaders have invested heavily in traditional safety management to improve safety performance over the years. This primarily involved: • fixing the environment (eliminating the hazard) • improving the

    May 5, 2022

  • AUSIMM
    Predicting Iron Ore Fines Shipment Moisture

    By J E. Everett, D Linden, P Maney

    In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for

    Aug 12, 2013

  • AUSIMM
    Rock Deformation and Mineralization at Mount Isa

    By Hall G

    The Mount Isa silver-lead-,zinc deposit possesses a number of features which sets it apart from usual occurrences of ores containing those metals. The deposit has been described in vario:us papers, bu

    Jan 1, 1942

  • AUSIMM
    Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral Sands

    By T Wambeke, J Benndorf

    A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att

    Nov 24, 2014

  • AUSIMM
    Simplified Hybrid Semi-autogenous Grinding Mill Control – Explanation and Practical Results at the Porgera Concentrator

    By E Beltran, S Ngunz, F Orrante, F van Zyl, M Westcott

    "The primary control objective of the project is to achieve milling optimisation by ensuring that the energy available for rock breakage is used as efficiently as possible. This is achieved by increas

    Oct 10, 2016

  • AUSIMM
    The Status of Implementation of Proximity Detection Systems in Underground Mines

    By D Kent

    The introduction of digital technologies into the underground mining industry, in both coal and hard rock mining, has enabled many high bandwidth applications to be adopted by mines.Digital networks b

    Mar 21, 2011