Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Composition of the Lead-Zinc Ores at Captain's Flat, NSW, II
By Baker G
The detailed mineral composition of the lead-zinc ores at Captain's Flat was first studied in 1942 (Edwards, 1943).At that time the workings did not extend far below the 750ft. level. Since then
Jan 1, 1953
-
The Practicalities of Implementing Net Volume Licensing of Water Use in Mines and Quarries - A Discussion Based on Victorian Case Studies
By A Horne, Z Graszkiewicz, D Dettrick, R Evan, B Neal
"Most of VictoriaÆs rivers and aquifers are already fully allocated or reaching full allocation. In regions without a well-established water market, access to water entitlements to facilitate new deve
Nov 26, 2013
-
Life Cycle Assessment and Tailings Management Trade-Off Studies - An Approach to Implementation
Tailings management trade-off studies are done for all mining projects. There is wide variability in these studies as their approach, details and outcomes are determined by the experience and focus of
Jan 1, 2009
-
WaihiÆs 2020 Vision: Part C: How Did We Get There - The Process
By S M. Stewart
Building and Maintaining Community Relationships In mining terms, the town of Waihi is distinctive with the Martha mine situated right in the heart of the town. MarthaÆs central location and ot
Jan 1, 2006
-
Catalysing lower-carbon mining supply in Australia
By M Rea, E O’Connell
Decarbonising explosives manufacturing and catalysing low-carbon mining supply is a significant global challenge. Low-carbon manufacturing precincts – clusters of geographically close businesses acros
Sep 1, 2024
-
The evolution of the Cadia 40-foot SAG mill to treat the Cadia East orebody: a case study of incremental change leading to operational stability
By J Seppelt, B Akerstrom, A Rice, J Bubnich, T Waters
The Concentrator 1 plant at Cadia transitioned from Cadia Hill open pit to the Cadia East block cave ore body in 2013. As a result of this change, major plant upgrades were required to achieve the des
Aug 29, 2018
-
Challenges Faced by Narrow Vein Graphite Mining and Influence of Graphite Infill on Wall Stability
By H S. Welideniya, K Ekanayake
Carbon rich graphite deposits found in Sri Lanka are of inorganic origin and they occur as narrow steeply dipping veins. The vein width of these deposits varies from a few centimetres to metres, with
Mar 26, 2012
-
A Two-Component Model of Blast Fragmentation
Prediction of fragmentation by blasting is most commonly based on theassumption that a single distribution of pre-existing discontinuities is present within a blasted rock volume and that the underlyi
Jan 1, 1999
-
Productivity improvement through collaborative shift planning and tracking
By E Deucker, A White
Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their
Oct 16, 2017
-
Challenges and Opportunities in the Development of a Cultural Heritage Management Strategy at the Lihir Gold Mine, Papua New Guinea
By J Cook
In this paper we present a case study of the challenges and opportunities associated with the development of cultural heritage management strategies at the Lihir gold mine in Papua New Guinea. We disc
Jan 1, 2009
-
Mentoring and Your Career
Young professionals are riding the current wave of high demand for their services and relatively little competition for placements. The attraction and retention of quality incumbents has therefore bec
Jan 1, 2006
-
Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South Australia
By A Querzoli, B Williams
In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann
Jul 25, 2018
-
JK Drop Weight Parameters - A Statistical Analysis of their Accuracy and Precision, and the Effect on SAG Mill Comminution Circuit Simulation
By T J. Napier-Munn, T Perkins
The JK Drop Weight test was developed at the Julius Kruttschnitt Mineral Research Centre (JKMRC) in the early 1990s as a means of characterising ore for the purposes of AG/SAG mill and crusher modelli
Jan 1, 2008
-
Managing Community Relationships and Corporate Reputation - A Stakeholder Perspective
By S McEachern, J Lowe
An important issue currently facing the mining industry in Australia is the management and cost to the industry and other stakeholders of entry into and exit from towns and their communities. These co
Jan 1, 2006
-
Best Practice Environmental Management - A Critical Strategy for the Future of the Mining Industry
The role of government and the community has changed significantly over the last two decades in relation to environment protection, particularly in the mining sector. Increased community expectation
Jan 1, 1997
-
Exploration for Hydrothermal Minerals Offshore New Zealand: Revealing the Resource
By C E. J de Ronde
Most of the world's economically significant volcanogenic massive sulphide (VSM) deposits are considered to have formed in submarine arc and backarc settings. While the Kermadec-Tonga arc is an e
Jan 1, 2000
-
Benchmarking Energy Efficiency ù A Case Study at Macraes Gold Mine
By K Osten, N Scagliotta, G Lane
Oceana Gold (New Zealand) Limited operates the Macraes Gold Mine near Dunedin on the South Island of New Zealand. The orebody is mineralogically complex and comparatively low grade requiring a series
Jan 1, 2004
-
Modelling multi-seam interactions for longwall mining
By A Lines
This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan
Nov 30, 2018
-
Queensland Mines Should Consider Climate Change Impacts for Decommissioning
By M C. Evans
"Mine decommissioning is the final phase in a mining project. Planning for decommissioning must commence for a proposed mine even before the government approves it. Queensland mining approvals require
Jul 16, 2014
-
Real-Time Simulation in Process Engineering - Dream or Reality?
Computation is believed to be a powerful tool in scaling-up chemical processes and in designing materials, however, is being challenged by low predictability and limited scalability. This presentation
Sep 13, 2010