Search Documents

  • NIOSH
    RI 4997 Gasification Of Lignite In A Commercial-Scale Pilot Plant: Progress Report January 1, 1949 To June 30, 1950 ? Summary Abstract

    By A. C. Burr

    This progress report covers the period from January 1949 to the end of the fiscal year, June 30, 1950. Three runs were successfully completed, and one run was terminated as the result of failure of a

    Jan 1, 1953

  • DFI
    Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway Bridges

    By Kouichi Tomisawa

    Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri

    Jan 1, 2006

  • AUSIMM
    Mining Methods at Mount Morgan Limited, Mount Morgan, Queensland

    By Patterson B. G

    The small party of mining men who formed the original Mount Morgan Syndicate in 1882, commenced operations on the top of the mountain with what were practically nothing more than small hillside quarri

    Jan 1, 1939

  • NIOSH
    OFR-87-82 Poisoning Of Catalytic Methane Sensors

    By M. Kawahata

    Methane sensors using principle of catalytic oxidation of methane are employed for determination of methane content in ambient air of coal mines. Certain foreign gases or vapors in the air poison the

    Jan 1, 1981

  • AUSIMM
    æCleanfillingÆ ù A Valuable Means of Rehabilitating Quarries in Auckland

    By A Hanna

    Quarries around Auckland have reached or are reaching the ends of their lives, which raises issues about rehabilitation. Significant volumes of 'cleanfill' are generated by the City, particu

    Jan 1, 2002

  • AIME
    Discussions of Papers Published Prior to July 1960 - Sand Deposits of Titanium Minerals, AIME Trans, 1959, vol 214, page 421

    By J. L. Gillson

    Joseph H. Birman (Chairman, Dept. of Geolcgy, Occidental College, Los Angeles, Calif.) Many thanks to J. L. Gillson for so comprehensive a survey of the titanium sand deposits of the world. Over the p

    Jan 1, 1961

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • AIME
    List of Members ? corrected to November 15, 1905

    By AIME AIME

    American Institute of Mining Engineers. (Organized in 1871, and Incorporated in 1905.) OFFICERS. For the year ending February, 1906. Directors JAMES GAYLEY (President), R. W. RAYMOND (Secretary),

    Jan 1, 1906

  • ISEE
    Analysis of Parameters of the Ground Vibration Produced by Bench Blasting at a Boron Open Pit Mine in Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Mehmet Aksoy, Kagan Ozdemire

    With increasing environmental constraints on the levels of disturbance induced by blasting operations upon nearby residents, there is an increasing need to be able to design cautious blasting with gre

    Jan 1, 2005

  • SME
    Utilizing Paste Technology For Reclamation Of The Ute-Ulay Upper Tailings Impoundments, Lake City, CO - Project Background

    By T. Tafi

    The Ute-Ulay project area is located approximately five miles west of Lake City, in Hinsdale County, Colorado. The Ute-Ulay Mine site is approximately one mile east of the project area. The elevatio

    Jan 1, 2011

  • NIOSH
    IC 7608 Allaying Coal Dust During Operation Of Continuous-Mining Machines In Utah ? Introduction And Summary

    By W. M. Merritts

    The control of coal dust created and released during the operation of continuous mining machines in bituminous-coal mines of the United States is a problem. The interest manifested in this problem ind

    Jan 1, 1951

  • SME
    NATM Through Clean Sands—The Michigan Street Experience

    By Mohamed A. Younis, Paul J. Headland, Paul H. Madsen, Vojtech Gall

    INTRODUCTION A 100 ft long, 20 ft high and 18 ft wide NATM tunnel was excavated through grouted clean sands beneath a busy city street, including a variety of existing utility lines. The new tunnel

    Jan 1, 2007

  • SAIMM
    Needs Analysis for Capacity Building of Artisanal Miners in Central Africa

    By Steven M. Rupprecht

    "The artisanal mining sector in Central Africa is largely informal, yet provides an essential livelihood for many (directly or indirectly) participants, as well as facilitating an important source for

    Jan 1, 2015

  • SME
    Underground Caving Shield Change Outs At Us Steel’s Oak Grove Mine

    By B. Weyerman

    U. S. Steel's Oak Grove Mine experienced several top hinge failures on their caving shields. It was determined that all the caving shields needed to be replaced with new caving shields before mor

    Jan 1, 2001

  • NIOSH
    RI 4978 Anthracite Mechanical Mining Investigations Progress Report 6; Preliminary Testing Of Brieden Pneumatic Packing Machine ? Introduction

    By Clayton A. Landsidle

    There has been little change in timbering methods in anthracite mines for 75 years, and technical information on strata control is almost wholly lacking. In order to assist the industry to establish t

    Jan 1, 1953

  • DFI
    Design And Construction Aspects Of A Deep Basement In Dublin - Synopsis

    By Philip J. Daynes

    As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase

    Jan 1, 2003

  • DFI
    Systematic Evaluation of Driving Criteria and Performance of Tapered Piles in Glacial Sand

    By Terrence M. Carroll, Chu E. Ho, Dimitrios Niarchos

    "Construction of the new extension to Terminal 4 at John F Kennedy International Airport in Queens, New York involved the application of tapered piles for foundation support. Initial design based on p

    Jan 1, 2017

  • NIOSH
    RI 9458 - Behavior of Simulated Longwall Gob Material

    By Reno M. Pappas, Christopher Mark

    This report presents results of a U.S. Bureau of Mines study of longwall gob material. The objective of this work was to determine material stiffness properties of the gob for use in numerical models

    Jan 1, 1993

  • NIOSH
    RI 4164 Experiment in Underground Gasificaition of Coal, Gorpas, Ala

    By James L. Elder, J. P. Capp, James J. Dowd

    The Bureau of Mines and the Alabama Power Co., jointly, conducted the first experiment undertaken in the United States in underground gasification of coal in place, at Gorgas, Ala. Milton H. Fies, man

    Aug 1, 1947

  • DFI
    Design Of Drilled Shafts Supporting Sound Walls

    By Ke Yang

    Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again

    Jan 1, 2007