Search Documents

  • AUSIMM
    Facies of Ore Formation: A Preliminary Account of the Pegmont Deposit as an Example of Potential Relations Between Small "Iron Formations" and Stratiform Sulphide Ores

    By Vaughan J. P

    The Pegmont deposit is a stratiform Pb-Zn sulphide body occurring in a thin, iron-rich metasedimentary unit situated near the top of the Kuridala Formation, a part of the Mary Kathleen Group of the Mi

    Jan 1, 1979

  • CIM
    Improvements in HPGR and Grinding Mill Technology

    By Cosmin Carpinisan, Erich J. Hofmann, Stephen J. Hall

    "Since presenting a technical paper regarding their unique capabilities in Forged Steel Mill Gearing at the SAG-2006 Conference, Australian heavy engineering company Hofmann Engineering has pioneered

    Jan 1, 2012

  • NIOSH
    A Computer Simulation Model For Surface Mine Reclamation Planning - Volume IV: User's Manual For OPMHS/2

    By R. V. Ramani

    This volume is the fourth of a four-volume final report on research carried out under a contract from the U.S. Bureau of Mines on the development of a computer simulation model for surface mine reclam

    Jan 1, 1985

  • SME
    An Evaluation Of The Risks Of Lung Cancer And Mesothelioma From Exposure To Amphibole Cleavage Fragments

    By John F. Gamble

    Amphiboles are hydrated mineral silicates five of which occur in asbestiform habits as asbestos grunerite (amosite) asbestos, riebeckite (crocidolite) asbestos, anthophyllite asbestos, tremolite asbes

    Jan 1, 2007

  • AUSIMM
    The Greymouth Coal Project

    The Greymouth Coal Project is a proposal to mine by the application of proven hydraulic, and room and pillar underground mining methods; and to process the equivalent of an average of 1.7 million tonn

    Jan 1, 1997

  • CIM
    Suivi non-destructif de l?évolution de la résistance mécanique des remblais cimentés en pâte: application de la résistivité et de la micro-sismique en laboratoire

    By Serge Ouellet

    Résumé Six modèles métriques de remblai cimenté en pâte (RCP) ont été suivis durant 120 jours par l?utilisation de deux méthodes géophysiques non-destructives : la résistivité et la micro-sismique.

    Feb 1, 2008

  • AUSIMM
    Re-development of the Big Bell Mine, Cue

    The area around Big Bell was actively explored and sporadically mined for gold from 1904 onwards. The lease was named Big Bell in 1913. The property became established as a major mining centre with

    Jan 1, 1989

  • AUSIMM
    Carmen Copper – A Sustainable Approach to Tailings Thickener Upgrades

    By C Maloloy-on, S Morgan, M Deiparine, H Mackie

    There is a strong focus in the mining industry to limit its impact on water quality and usage. This is even more evident in developing countries, where mining companies operate within local communitie

    Sep 7, 2015

  • AUSIMM
    Atmospheric Corrosion of Extruded Silver Lead Alloys

    By Hirst H, McAfee J

    In December, 1934, Mr. R. Sussex extruded some silver lead alloy wires in order to determine their electrical resistance. After the determinations had been made each wire was threaded through a sheet

    Jan 1, 1941

  • CIM
    Truck Lift System

    ? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM

    May 1, 2003

  • DFI
    Piling Adjacent To Rail Tunnels At King’S Cross Central

    By David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott

    This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600

    May 1, 2022

  • SME
    Detroit Salt Mine – Past and Future

    By E. Z. Manos

    The Detroit salt mine is operated by the Detroit Salt Co. It is one of the oldest underground room-and-pillar mines in the United States still in production. Mining at the Detroit salt mine began

    Jan 1, 2003

  • AUSIMM
    Philex Gold Philippines, Inc's Bulawan Mine - The Philippines Largest Primary Gold Producer

    By Anievas JB, Sevillano AC

    This paper describes the acquisition, exploration, development, initial operation and subsequent financing of the Bulawan mine by means of a listing on the Toronto Stock Exchange of a subsidiary of th

    Jan 1, 1997

  • IOM3
    Photographic technique for the detection and monitoring of ground movements associated with mining and quarrying

    By P. Grainger, P. G. Kalaugher

    Paper presented at conference and first published in preprint volume of: Risk assessment in the extractive industries, held in University of Exeter, 23-24 March 1994. London: IMM, 1994. Large, unpredi

    Apr 1, 1996

  • AUSIMM
    Mineral Resource Assessment for the West Coast of New Zealand, Using Spatial Analysis in a GIS: A New Exploration Management and Land-Use Management Tool

    By A B. Christie, S C. Cox

    Effective land-use planning requires accurate knowledge of mineral resource potential. Mineral companies during reconnaissance exploration, feasibility investigations and mine development also use thi

    Jan 1, 2001

  • NIOSH
    Bulletin 44 First National Mine Safety Demonstration

    By Albert H. Fay, Herbert M. Wilson

    The national mine-safety demonstration at Pittsburgh, Pa., was projected and undertaken in the hope that it would aid the increase of safety in the mining industry. That the national mine-safety demon

    Jan 1, 1912

  • ISEE
    Bench Face and Quarry Fragmentation Analysis: 3D Imaging vs. Scaling References

    By Daniel Ko, Ian Bell, Shahram Tafazoli, Bahram Sameti, Aylin Azmin

    Image-based remote sensing of rock fragmentation in mining and quarry applications essentially treats each rock in the image as a data object in order to determine the rock size distribution. An obvio

    Jan 1, 2015

  • SME
    Evaluation Of Smoke Detectors For Use In Underground Mines - Preprint 09-072

    By C. D. Litton

    Laboratory experiments were conducted to determine the responses of a prototype smoke detector and a commercially available photoelectric smoke detector to smoke particles generated from various combu

    Jan 1, 2009

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • SME
    Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking

    By Bhaskar B. Thapa

    The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet

    Jan 1, 2008