Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Comparison Of Predictions And Measurements Of Subsidence Caused By Underground Mining In Northern Appalachia

    By H. J. Siriwardane

    This paper presents results from three case studies involving longwall mine panels at which the measured ground movements were compared with the numerical model predictions based on the finite element

    Jan 1, 1988

  • SME-ICGCM
    Stability analysis and characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma

    By M. M. Zarnan

    This paper presents the results of s study involving characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma. Two coordinated efforts were undertaken: (1) collectio

    Jan 1, 1989

  • SME-ICGCM
    Two Case Studies Of The Performance Of Rib Supports

    By M. K. Larson

    The U.S. Bureau of Mines conducted a study to evaluate support interaction between conventional bolts and the rib at two Western coal mines. The principal goal was to develop guidelines for designing

    Jan 1, 1996

  • SME-ICGCM
    Problems And Prospects Of Roof Bolting Development At Cuzbass Region Mines

    By V. Eu. Anufriev

    Despite of significant cost advantages and the positive expierence roof bolting is limited up to 15-20% of all workings at the Cuzbass mines. The low level of application of the technology is the re

    Jan 1, 1996

  • SME-ICGCM
    Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot Plant

    By L. J. Terrill

    Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info

    Jan 1, 1996

  • SME-ICGCM
    Geomechanical Support Of Adaptive Mining Technology

    By I. V. Baklashov

    Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad

    Jan 1, 1996

  • SME-ICGCM
    Outburst Control in Underground Coal Mines,

    By Floyd D. Varley

    Outbursts, the sudden and violent out- pouring of material into mine openings, is a ground control problem increasingly encountered in the United States as deeper seams are developed. Outbursts, cause

    Jan 1, 1986

  • SME-ICGCM
    Effect Of Specimen Size On Compressive Strength Of Coal

    By A. W. Khair

    Laboratory studies indicate that the specimen size influences the compressive strength of coal significantly. In the past, the diameter/height ratio of coal and rock specimens with different geometry

    Jan 1, 1996

  • SME-ICGCM
    Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)

    By Kray Luxbacher

    Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.

    Jan 1, 2007

  • SME-ICGCM
    Displacement Discontinuity Method For Three-Dimensional Stress Analysis Of Tabular Excavations In Non-Homogeneous Rock (ff6cd480-c238-4f06-bf11-52c054cbd2e8)

    By Leigh J. Wardle

    This paper describes a numerical method for calculating the three¬-dimensional stresses and displacements induced by tabular excavations in a rock mass consisting of parallel layers of distinct mater

    Jan 1, 1984

  • SME-ICGCM
    Identification Of Factors Affecting Horizontal Displacement In Subsidence Process

    By Yi Luo

    In the study of the topographical effects on surface movement due to underground longwall mining, the factors that affect the incremental horizontal displacements are identified using 10 collected cas

    Jan 1, 1996

  • SME-ICGCM
    New Type of Load Cell for Monitoring of Roof Bolt Tension

    By K. Unkug

    It is commonly accepted that the tension of roof bolts can be used as a measure of the effectiveness of roof support performance in coal bearing strata. The conceptual base for the assumption orig

    Jan 1, 1986

  • SME-ICGCM
    An Innovated Self-Screwed Tube Bolting System(STBS) To Reinforce Stability Of Mine Entries (b3995592-5744-4f95-89d6-4030a00b69b4)

    By Xingtian Hui

    Due to variation in the geological natures of underground coal mines, especially when the entry?s roof/floor are soft and weak, it is vital to select an appropriate roof bolting system to ensure entry

    Jan 1, 2009

  • SME-ICGCM
    Seismic Events In German Hard Coal Mining (927aed19-540f-49d6-8a7e-8eb1cd5cfc71)

    By Axel Preusse

    Underground coal mining can cause seismic events. There is currently no way to predict such phenomena reliably, in particular stronger events. That is why, according to the current state of the art, e

    Jan 1, 2009

  • SME-ICGCM
    Gate Entry Design For Longwalls Using The Coal Mine Roof Rating

    By Chris Mark

    Successful longwall mining requires a stable tailgate entry. Gate entry performance is influenced by a number of geotechnical and design factors, including: - Pillar size and pillar loading; - Ro

    Jan 1, 1993

  • SME-ICGCM
    Design And Hazard Assessment Of Mine Ore Passes

    By M. J. Beus

    This paper will describe the research approach being initiated by the Spokane Research Center to assess hazards and design criteria to prevent ground and muck falls in and around ore passes in hard-ro

    Jan 1, 1996

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    Rock Mechanics And Ground Control For Underground Mining And Construction

    Recent improvements are described in several techniques for ground control in underground mining. Promising methods for analysis and mitigation of rockbursts are discussed. Methods of assessing damage

    Jan 1, 1989

  • SME-ICGCM
    Designing for Upper Seam Stability in Multiple Seam Mining

    Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume

    Jan 1, 1986

  • SME-ICGCM
    Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)

    By Eleanor Sonley

    In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi

    Jan 1, 2009