Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Modern Shield Technology: Better Than Ever But Still Not Perfect

    By Thomas M. Barczak

    A survey of the longwall industry was conducted to examine the performance of modern shield technology. The results of this survey indicate that state-of-the-art shields perform better and last longer

    Jan 1, 1999

  • SME-ICGCM
    Determination Of The Stopline Subsidence Profile Of Phalen 2 West Panel From Within A Near Horizontal Borehole Over The Panel Stopline

    By William D. Gallant

    This paper presents the results of a joint cooperative research project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to observe the subsidence pr

    Jan 1, 1990

  • SME-ICGCM
    Ground Control Practice at Leeville Underground Mine

    By Changshou Sun

    The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo

    Jan 1, 2013

  • SME-ICGCM
    Gob Canopy Roof Support for Difficult Natural Conditions

    By Jay Hilary Kelley

    This paper proposes a modification of longwall roof support to meet new difficult mining conditions that are anticipated in the future. A gob canopy is a movable appendage attached on the rear of a lo

    Jan 1, 1997

  • SME-ICGCM
    Research, Development, And Use Of Steel-Fiber-Reinforced Concrete Cribbing For Mine Roof Support

    By Dale A. Didcoct

    Through the combined efforts of the C. S. Bureau of Mines, the coal industry, and Burrell Construction and Supply Company, New Kensington, PA, a steel fiber reinforced concrete crib block to improve c

    Jan 1, 1982

  • SME-ICGCM
    Design Of Lower Seam Longwall Operations In Multiple Seam Mining

    By P. Forrest

    Based on the results of mathematical analysis, photoelastic modelling, and case studies, the mechanisms of longwall under- mining interaction has been thoroughly investigated. The effects of using yie

    Jan 1, 1988

  • SME-ICGCM
    Development Of A Subsidence Database And Determination Of Subsidence Parameters

    By Syd S. Peng

    A total of 209 cases of subsidence data over longwall panels in 16 US coal seems have been collected and built into a subsidence database. The database is developed under MS Windows environment. It us

    Jan 1, 1995

  • SME-ICGCM
    Systems Used In Coal Mining Development In Long Tendon Reinforcement

    By Brian Clifford

    A wide range of different cablebolt systems are available and in use in hard rock and coal mines around the world. The birdcaged cablebolt was initially used in UK coal mines in conjunction with ro

    Jan 1, 2001

  • SME-ICGCM
    Field Test with Strain-gauged Friction Bolts at the Gold Hunter Mine, Mullan, Idaho, USA (f62ddf9f-aabd-4681-8d92-4a50602e035c)

    By Jeffrey Johnson

    To measure the loading behavior of friction bolts, researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) installed strain gauges on the in

    Jan 1, 2003

  • SME-ICGCM
    The Introduction of Roof Bolting to U.S. Underground Coal Mines (1948-1960): A Cautionary Tale (fc50b3c4-830d-49aa-a1be-7477dcdf44ae)

    By Chris Mark

    Perhaps the most significant development in coal mine ground control during the last century was the introduction of roof bolting during the late 1940's and 1950's. From an engineering stand

    Jan 1, 2002

  • SME-ICGCM
    Influence Of Partings In A Coal Seam On Long Term Pillar Stability

    By K. Biswas

    So far, all pillar design methods or approaches consider the coal seam as a uniform structure From some mine visits in northern Appalachian Region. it is found that some coal seams have binder or part

    Jan 1, 1995

  • SME-ICGCM
    Enhancing Mine Subsidence Prediction and Control Methodologies

    By Michael Karmis

    During the last 25 years, technological advancement and subsidence research have resulted in more accurate and diverse prediction capabilities. The work presented in this paper focuses on the developm

    Jan 1, 2008

  • SME-ICGCM
    Design Of Roadway Support Using A Strain Softening Model

    By Jamal Hematian

    Understanding the behaviour of rocks in a high horizontal stress field, such as that in Australia, is critical when analysing the stability of underground structures. This paper addresses the signific

    Jan 1, 1994

  • SME-ICGCM
    Microseismic Monitoring of Mountain Bumps and Bounces: A Case Study

    By J. L. Condon

    The Bureau of Mines, through in-house and contract research, monitored mountain bump-prone areas of the Olga #2 Mine, near Welch, WV, using microseismic techniques for 15 months during 1985 and 1986.

    Jan 1, 1987

  • SME-ICGCM
    Field Evaluation of Yield Pillar System at a Kentucky longwall Headgate

    By Christopher Mark

    The Bureau of Mines is conducting research to assess the effectiveness of different chain pillar designs in maintaining gate entry stability. The study described in this paper was performed in a 1200

    Jan 1, 1988

  • SME-ICGCM
    Violent Coal Pillar Collapse -A Case Study

    By André Zingano

    Pillar collapses have been studied for several years and can be classified into two types: nonviolent squeeze or violent pillar collapse, i.e., controlled or uncontrolled pillar collapse. Underground

    Jan 1, 2004

  • SME-ICGCM
    A Comparison Of Support Reactions To Retreat Longwall Front Abutment For Two Different Gateroad Support Techniques

    By Gary R. Corbett

    The federally owned Cape Breton Development Corporation (CBDC) mines approximately 2.5-3.0 Mt of coal per annum from its Phalen Colliery. As part of an ongoing process to become more commercially viab

    Jan 1, 1993

  • SME-ICGCM
    Gateroad Pillar Extraction Experience at Jim Walter Resources

    By Gregory Hendon

    Jim Walter Resources, Inc. (JWR), has successfully longwall mined for many years at depths ranging from 1200'-2500'. However, full pillar extraction has proven difficult and generally econom

    Jan 1, 1998

  • SME-ICGCM
    Interaction Between Roof And Support On Longwall Faces With Particular Reference To Support Resistance

    The objective of extensive underground experimentation on three longwall coal faces was to improve the stability of mechanised longwall faces through investigation of the relations between support res

    Jan 1, 1984

  • SME-ICGCM
    Analysis of Coal Pillar Stability (ACPS): A New Generation of Pillar Design Software

    By Zach Agioutantis, Christopher Mark

    "Thirty years ago, the Analysis of Longwall Pillar Stability (ALPS) inaugurated a new era in coal pillar design. ALPS was the first empirical pillar design technique to consider the abutment loads tha

    Jan 1, 2018