Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development Of A Hydrometallurgical Path To Recovery Of Critical Materials From Spent Lithium Ion Battery Black Mass - SME Annual Meeting 2022By J. R. Klaehn, M. Shi, T. E. Lister, L. A. Diaz, J. S. McNally
Since 2019, approximately two dozen international battery recycling companies have been operating at the commercial or pilot scale [1]. However, current process capacity does not exceed 100,000 tons o
Mar 2, 2022
-
Solid Waste Disposal Site Selection For The McLaughlin Gold Project In Northern CaliforniaBy David B. Crouch
Wastes in various forms have always been a part of mining, and management of mine waste has evolved from the early days of "push it over the side and down the creek" to today's highly engineered
Jan 1, 1983
-
Sulfide Biooxidation - Pilot Heap at Gilt Edge MineBy Omar A. Muhtadi
Brohm Mining Corporation, in conjunction with Geobiotics, Inc. has nearly completed a pilot heap biooxidation test on sulfidic ore from the Gilt Edge Mine near Rapid City, South Dakota. Some results f
Jan 1, 1995
-
Borehole Radar Determines Solid Coal And Mined-Out Areas For A Construction SiteBy G. G. Marino, Z. R. Widup
Marino Engineering Associates, Inc. (MEA) was asked to determine the effects of mining beneath a proposed roadway structure. In order to determine the subsidence potential and the magnitude of the min
Jan 1, 2004
-
Mineral Dressing Studies Of Municipal Incinerator. FlyashBy William F. Lawrence
Due to the immense volumes of municipal wastes that are generated in this nation every year, it has become imperative that effective measures be developed to utilize all or portions of these materials
Jan 1, 1971
-
Evaluating bump prone ground with LaModel through site-specific calibration - SME Transactions 2014By K. W. Harris, K. A. Perry
Reserve depletion in Central Appalachia is continuously creating unique ground conditions for underground coal mines with many of these difficult environments directly attributable to multiple seam mi
Jan 1, 2014
-
Construction of the East-West Cross Drift Tunnel at the Yucca Mountain SiteBy Brian Fulcher, John Eastlund, J. B. Copeland
Following the completion of the 7,600 m primary access tunnel by Kiewit/Parsons Brinckerhoff (K/PB) in April 1997, an exploratory East-West Cross Drift Tunnel was constructed at the Yucca Mountain Pro
Jan 1, 1999
-
Mine Ventilation Enhancement Through Use Of Cable SupportsBy L. L. M. Kadnuck
The U. S. Bureau of Mines studied the suitability of using flexible tendon cable supports as secondary roof supports at a western coal mine. The supports were installed in longwall tailgate entries an
Jan 1, 1994
-
Effect Of Lift Height, Overall Heap Height And Climate On Heap Leaching EfficiencyBy J. Marsden
Lift height, overall heap height and climate all play an important role in determining precious metals leaching rates, recoveries, operating costs and capital cost requirements for heap leaching opera
Jan 1, 1995
-
Particle Size Impacts on Reagent Consumption and RecoveryBy R. Xiong, A. K. Fallaw, G. Wang, L. R. Moore, S. Dobson, J. Gu
"INTRODUCTION The Central District of the Florida phosphate industry is located in southwest Polk and southeast Hillsborough Counties, with the Southern Extension lying in western Hardee, eastern Mana
Jan 1, 2015
-
Stillwater?s Blitz TBM Project UpdateStillwater Mining Company (SMC) has an extensive history with tunnel boring machines (TBM) at the Stillwater and East Boulder underground PGM mines in Montana. The most recent TBM used is for the Blit
Feb 23, 2014
-
The Development of a Multiple Level Underground Limestone Mine from Geology through Mine PlanningBy Christopher Newman, Robert Dupuy, David Newman
"The development of a multiple level underground mine is a complex task in which geology, engineering, ground control, and unit operations are integrated into a single mine design. The components are
Jan 1, 2019
-
Examination of Redirected Continuous Miner Scrubber Discharge Configurations for Exhaust Face Ventilation SystemsBy J. A. Organiscak
The National Institute for Occupational Safety and Health (NIOSH) Office of Mine Safety and Health Research (OMSHR) has recently studied several redirected scrubber discharge configurations in its ful
Feb 23, 2014
-
Environmental Permitting And Compliance For Mine Site Development In Uzbekistan And The CisBy Kristin Hemlein
Mining project development, permitting, environmental regulatory and compliance issues in Uzbekistan and the CIS are every bit as complex as those in the western world. The vast array of environmental
Jan 1, 1997
-
Impact of Using Synchronous Condenser for Power System Stability and Improvement of Short Circuit Power in Mining ProjectsBy M. Nambiar
Due to the remote locations of the mining projects and the demand for long transmission lines to provide electrical power, mining sites often operate with poor network power quality and low short circ
Feb 23, 2014
-
Flocculation Behavior Of Dolomite With Poly(ethylene-Oxide) (b2ce8668-9287-49c8-a0e1-67e640bfe0d5)It has been reported previously that dolomite samples from different locations showed varying flocculation behavior with Poly(ethyleneoxide) (PEO). In this study it is determined that palygorskite ass
Jan 1, 1994
-
Feldspar Beneficiation: Tailoring Reagents to the MineralBy G. Wang, L. R. Moore, Y. Xiong, A. Gorken
"Feldspar may represent 60% of the earth’s crust, but the mineral does not exist in a pure state. It is generally associated with quartz, iron containing minerals such as mica, and titanium containing
Jan 1, 2016
-
Removal Of Metal Ions From Water By Water Hyacinth RootsBy G. X. Wang
The nonliving dried water hyacinth (E. crassipes (Mart.) Solms) roots were investigated for biosorption of cadmium and lead and other heavy metal ions in aqueous solutions. Dried water hyacinth roots,
Jan 1, 1997
-
Process Development Testing for Comminution Circuit Design"Metallurgical process development in greenfield projects must define the comminution flowsheet and establish the equipment sizes that are required to deliver the project design criteria. These are cr
Jan 1, 2016
-
Environmental Mediation: Resolution Of A Site-Specific Dispute With Area-Wide Policy ImplicationsBy Verne Huser
The intensity of environmental conflict, the delays and legal battles that have marked the 1970's suggest the need for additional processes to resolve environmental disputes. Our present means fr
Jan 1, 1979