Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                The computational analysis of shallow depth tabular mining problems - SynopsisBy J. A. L. Napier
The evaluation of stress distributions and deformations in the vicinity of tabular mine layouts has been carried out routinely for many years using the displacement discontinuity boundary element meth
Jan 1, 2007
 - 
                    
                Strategy Towards a Mining Industry-Wide Buyand- Maintain Quiet Initiative to Reduce Noise Induced Hearing LossBy H. Gumede
The challenges of noise emission in the mining industry are well known. These challenges are exacerbated by the increasing trend towards mechanized mining, and there is general consensus that an effec
Jan 1, 2014
 - 
                    
                Sustainability Of Innovative Management Practices Of Geotechnical Risk At Damang Pit Cut Back (Dpcb) ? A Case Study At Gold Fields Ghana, Damang MineBy E. Dadzie
This paper will review some methods used to manage geotechnical risk at Damang Pit Cutback. The pit depth is designed up to 250m with push back on the eastern and western walls of the existed and depl
Jan 1, 2008
 - 
                    
                Fully Mechanized Longwall Mining with Two Shearers: A Case StudyBy S. Tu, Y. Yuan, H. Wei, Z. Chen, M. Jia
"To reduce production costs and increase efficiency in ageing coal mines, a system that utilizes two shearers in a fully mechanized longwall working face is proposed. Using theoretical and engineering
Oct 1, 2018
 - 
                    
                Factors In The Design Of Open Pit Slopes ? A Reviewer?s PerspectiveBy Peter Stacey
This presentation provides comments on the increasing challenges associated with pit slope designs from the perspective of a design reviewer. Besides the technical issues related to the significant i
Jan 1, 2006
 - 
                    
                2.1 van der Linde - Determination Of Correct Sample Size And Preperation MethodBy G. P. L. van der Linde
EVERY OREBODY IS UNIQUE [ ] GEOLOGY AND MINERALIZATION DIFFERENT [ ]
Jan 1, 2005
 - 
                    
                Optimum Spacing for Soil Sample TraversesBy W. A. Hodgson
"In order to be able to map the variation in the concentration of elements in soils, it is necessary to sample at intervals that will give adequate coverage of the area and will allow determination of
Jan 1, 2014
 - 
                    
                3D modelling for mineral resource estimation of the Darreh-Zereshk copper deposit using the indicator kriging approach APCOM 2021By Z Bagheri, E Moosavi
Identifying the exact borders of geological domains and assessing the uncertainty of these borders are crucial steps in resource estimation. This potential field method was designed to build 3D geolog
Sep 1, 2021
 - 
                    
                In-pulp technologyFor many of us, formal academic education slows abruptly when we leave a tertiary institute of learning. We start applying and connecting newly acquired knowledge with the practicalities of a career,
Jan 1, 1992
 - 
                    
                Mine Management by ObjectivesBy A. A. Hazell
Mine management by objectives By A. A. HAZELL The author discusses the objective areas of mine management. Setting objectives is seen to be a conscious process which starts at the highest level of man
 - 
                    
                Book Review - The Chemistry Of Gold ExtractionReviewer: R. Graham The chemistry of gold extraction by John Marsden and lain House. Elis Horwood Series in Metals and Associated Materials. Chichester, Elis Horwood. £80. The chronology has bee
Jan 1, 1992
 - 
                    
                Membrane desalination of service water from gold minesBy G. J. G. Juby
The Chamber of Mines Research Organization has been evaluating three membrane-desalination processes for use within the South African mining industry. These processes are electrodialysis reversal (EDR
Jan 1, 1992
 - 
                    
                Environmental control in the mining industryBy G. H. Grange
Details are given of three legal controls for the pollution of the air, the water, and the land, together with brief histories of the developments leading up to these controls. Attention is drawn to t
Jan 1, 1978
 - 
                    
                Technical note on patents and the mining industry-Part IBy L. Dison
This technical note is issued in two parts, as follows: Part I, after a brief introduction, discusses the value of patents and the law of patents, including patent applications and the exploitation of
Jan 1, 1992
 - 
                    
                Stope-face conveyors for gold minesBy R. H. English, N. C. Joughin
The results of trials with three stope-face cleaning systems are described. Two of these systems were based on armoured chain conveyors, and the third on a reciprocating-flight conveyor. The operation
Jan 1, 1979
 - 
                    
                A Rapid Method of Calculating Temperature Increases along Mine AirwaysBy A. M. Starfield
SYNOPSIS A description is given of a new computer programme that has been developed for the rapid computation of the changes in temperature and humidity of air passing through mine airways. The progr
 - 
                    
                Study on the application of Supply Chain Management (SCM) for Jiaojia Gold MineBy H. Xuchun, H. Nailian, L. Guoqing
With the accession to WTO and the establishment of Shanghai Gold Exchange, gold mines in China are facing more severe competition from both home and abroad. Supply Chain Management (SCM), a new manage
Jan 1, 2003
 - 
                    
                The control of milling circuitsBy A. L. Hinde, P. J. D. Lloyd, A. R. Atkins, J. G. MacKay
The control of milling circuits by A. R. ATKINS, M.Se. (Elee. Eng.) (Visitor), A. L. HINDE, S.Se., Ph.D. (London) (Visitor), P. J. D. LLOYD, S.Se. (Chem. Eng.), Ph.D. (Cape) (Fellow) and J. G. MACKA Y
Jan 6, 1974
 - 
                    
                Potential rockfals in conventionally supported stopes-a simple probabilistic approachThis paper considers the probability of the occurrence of potential rockfals in deep-level gold mines where there is point support (props, pipesticks, and timber sticks). The investigation described g
Jan 1, 1989
 - 
                    
                The limitations of gold-mine evaluationBy P. R. Jamisch
The limitations of gold-mine evaluation by P. R. JANISCH, B.Sc. (Sur.) (Natal) (Visitor) Inherent uncertainty in the choice of parameter values places theoretical and practical limitations on the inte
Jan 6, 1976