Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improved Signature Hole Technique – What is a Signature Waveform?
By Jhon Silva
"Signature Hole and Waveform Superposition techniques used to predict and control mine blast ground vibrations require a clearly defined information collection configuration. The collection of this in
Jan 1, 2017
-
Low-Frequency Blast Vibrations at a High Water-Table Site
By Mark S. Stagg, David E. Siskind, Stephen V. Crun, Willard E. Pierce
The USBM is studying the impacts of low-frequency blast vibrations on residences to assess both response and cracking potential. Complementing coal mining sites monitored in the midwest and east, vibr
Jan 1, 1996
-
A Study of Investigating the Relationship between Geological Strength Index and Ground Vibration Frequency Induced by Blasting
By Ali Kahriman, D. Adiguzel, R. Ulger, U. Akkaya
The environmental problems arising from ground vibration has been faced and discussed frequently in various industries such as quarry, mining, civil works, shaft, tunneling, pipe line and dam construc
Jan 1, 2011
-
Site Procedures for a Blast Vibration Program and Impact Assessment
By David E. Siskind
"This report describes recommended vibration monitoring and assessment practices at blasting sites.Intended is regular monitoring, tracking of trends, responding to complaints of alleged damage, and t
Jan 1, 1999
-
Bulk Transport Vehicle Fire Safety: Preventing a Mine Site Disaster
By Harry Verakis, Thomas Lobb
Widespread use of ammonium nitrate compositions for mine blasting operations has led to various bulk transport vehicles designed especially for the explosives industry over the past half century or mo
Jan 1, 2008
-
Explosives Energy is Challenging Mechanical Energy for Overburden Removal
By Jim Petrunyak, Conny Postpack
The authors describe in this paper a systematic approach toward reducing coal production costs up to 35% through the use of explosives energy for overburden removal. In this system, explosives are emp
Jan 1, 1983
-
Blast Desification Techniques (An Operator's Guide)
By Patrick D. McLaughlin, C Fordham
"The project outlined in the accompanying paper was to densify beach sands on the pond side ofa tailings dyke to the strength required for future dyke construction, This was to be achievedthrough the
Jan 1, 1992
-
Microseconds Matter in Monitoring
By Gregory B. Poole
Data collected with 16K sampling at a variety of blasting sites (construction, quarry, trench, mine) and monitoring locations was analyzed to effectively show the 16 different 1K readings all based on
Feb 1, 2020
-
Minimising Coal Loss through the use of Geophysical Logging
By Rob Lederer, Chris Batten
Traditionally coal model digital terrain models (DTM) are created from lithological information obtained from broad scale exploration holes. The grid layout and distance between holes means that model
Jan 1, 2012
-
Blast Vibration Analysis from Signature Holes
By Nikolaos Petropoulos, Ulf Nyberg, Daniel Johansson
A series of signature boreholes were blasted to observe any difference between confined and free face blasts. Four geophones were used to capture the compressive wave. The conventional approach, i.e.
Feb 1, 2020
-
The Statistical Analysis of Site-Specific Blasting Data Using Prediction Intervals and Tolerance Intervals
By Perry Sisk
In order to protect nearby structures during a blasting project, a peak particle velocity limit is often stipulated by a government agency or the owner of a particular structure. At the start of a bla
Jan 1, 2013
-
Comparison of Compliance Measures for Blasting near an Industrial Structure Vibration Monitoring Standards Connected to the use of Explosives in Different Countries, Part III
By C. Aimone-Martin, C. Dowding, M. Jern, J. Gjødvad
This article compares percentages of compliance for six national standards to demonstrate how these standards vary on-site in a real project. This, to the best of the authors' knowledge, has not been
Jan 1, 2024
-
Flyrock Control - By Chance or Design
By Adrian J. Moore, Alan B. Richards
Responsible blasting requires that rock throw be controlled to ensure that no danger will result to people and property. This paper describes the development and testing of empirical field calibrated
Jan 1, 2004
-
Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)
By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin
An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting
Feb 6, 2023
-
Mine Blasting Safety: Decades of Progress
By Harry Verakis, Thomas Lobb
Blasting accident data over a 30-year period (1980-2010) are summarized and presented for all types of surface and underground mining operations in the USA. The historical record of injuries from blas
Jan 1, 2012
-
Excavation of a Tunnel to Reach a Large Underground Cavern Roof Fall
By H. S. Venkatesh R. Balachander, G. C. Naveen
During the construction of a 1020 MW underground hydroelectric project in Bhutan a huge rock fall took place in the Downstream Surge Chamber (DSC) during March 2016. The total quantity of rock in the
Jan 1, 2019
-
Site Specific Blasting Model Using Schmidt Tensile Strength and Image Analysis
By K. M. Kim, J. B. Kemeny
A case study was conducted with 5 shots with varying pre-blast block sizes and explosive energies. From this case study a site-specific predictive fragmentation model was developed. There are two main
Jan 1, 2011
-
Expanded Blast Design For Tight Controlled Hard Rock Trenching Adjacent To Twin Burried Live Oil Pipelines
By A. Ravi Kumar
A trench is a structure to accommodate fluid carrying pipelines for water, gas, petroleum products etc. Trench serves the purpose to haul the fluids in bulk over long distances safely and economically
Jan 1, 2008
-
Drilling and Blasting Techniques for Sinking a Well in a Water Reservoir-A Case Study for Underwater Controlled Blasting Methodology and Monitoring
By Deepesh Yadav, B. S. Choudhary
Underwater drilling and blasting is conducted for deepening of sea channels for port berths, lake or reservoirs for water supply etc. so that rock dredging becomes easier. During this process there ar
Jan 1, 2018
-
Blast Vibration Modelling - An Instrument to Optimise Quarry Production
By Drew Martin
In March 2010 the Boral Linwood Quarry, Adelaide South Australia, implemented the blasting contractors Monte Carlo Blast Vibration Model as part of their blast design process. The Linwood Quarry was d
Jan 1, 2012