Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Optimizing Blast Hole Loading with MWD and 3D Image Analysis

    By Tristan Worsey, Brad Gyngell, Todd Buschjost, Gus Diehr

    This paper highlights the opportunities provided by integrating MWD data and drone generated 3D model to industries that use explosive energy to perform useful work as an integral part of their rock e

    Feb 1, 2020

  • ISEE
    Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant

    By Thierry Bernard, Philippe Dozohne

    May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate

    Jan 1, 2001

  • ISEE
    Permitted Explosives Research work in Australia

    By Duncan Chalmers, Rob Nowell, Miguel Araos

    Australian underground mines produce in excess of 60 mtpa of coal. Most of these use the longwall method, and they require the use permitted explosives (which are called “permissible” in other countri

    Jan 21, 2025

  • ISEE
    The Importance of the Explosive Confinement

    By Manuel Gutkrrez, Nasslo Gallardo, Arturo Cancec

    The study done in Dofia In&s de Collahuasi aims to improve the fragmentation in one of the most difficult rocks to deal with in an operation, It is the Ignimbrita. In order to avoid ejections and to i

    Jan 1, 2001

  • ISEE
    The European Integration through a Major Drill & Blast Tunneling Project

    By Demosthenes (Dennis) Efstratiadis

    After European Council’s Directive 93/15/EEC of 5 April 1993 on the harmonization of the provisions relating to the placing on the market and supervision of explosives for civil uses, the so called ”I

    Jan 1, 2018

  • ISEE
    Using Artificial Intelligence and 3D Imaging for Real-time Fragmentation Analysis on Conveyor Belts

    By Ronald Ticona, Anaani Huaman, Andrea Lucero

    Mine-to-mill optimization begins with a clear understanding and ongoing assessment of blasting, crushing, and grinding operations. Modification of blasting practices to optimize feed size can increas

    Jan 1, 2019

  • ISEE
    Method of Ground Water Removal from Blast Holes

    By I. Petrovsky

    Presence of the ground water, especially flowing water, causes limitations in the type of the explosives, which can be used for the blasting development in the open cats and quarries. This presents re

    Jan 1, 2003

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis A. Davidsavor, David A. Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

    Feb 1, 2020

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis Davidsavor, David Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

  • ISEE
    A Blasting Plan for Loading Hot Holes

    By John R. Holliday, William Marcum

    Apogee Coal Company, DBA Arch of West Virginia, faced the challenge of drilling and blasting over one million cubic yards of high temperature overburden at its Ruffner surface operation near Logan, We

    Jan 1, 1996

  • ISEE
  • ISEE
    2000 Blasting in the New Millennium - The Blasting Log An Essential Witness of Professional Blasting Part II

    By Steve Dillingham

    PHYSICAL BLAST DATA Pattern Description All measurements related to the description of the physical blast pattern must be made with the mind-set that it has to tell a powerful factual story enabling a

    Jan 1, 2002

  • ISEE
    Saudi Arabia Transition to Mining – Blast Optimization at Maaden Gold Mines

    By Angel Rafael Fernandez, Yahya Khader Al-Harbi, Benjamin Cebrian Romo, Antonio Morato Medina

    The kingdom of Saudi Arabia has set the goal to diversify their economy from oil into different fields including mining. As the vast Arabian Peninsula is explored, orebodies of Aluminium, Copper, Gold

    Feb 6, 2023

  • ISEE
    Prediction of blast induced ground vibration and its associated dominating frequency using a comprehensive support vector machine model

    By T. G. Sitharam, P. B. Choudhury

    Prediction of ground vibration (peak particle velocity, PPV) and frequency is an important task in geoscience. Till date, many empirical equations are derived from conducting trial blasts in the mines

    Jan 1, 2010

  • ISEE
    Drilling and Blasting with Large Equipment: Sustainable Mining Near Communities

    By Mattos J. L. C

    Drilling and blasting with explosives in mining operations near communities require careful planning to mitigate socio-environmental impacts. Ground vibration, noise emission, flyrock, and dust disper

    Jan 26, 2026

  • ISEE
    Analysis of Environmental Effects Induced by Cautious Blasting During the Excavation of Istanbul Subway Construction

    By Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Ahmet Varol, Ertugrul Kaya, Turgay Ozat

    This paper presents analysis of environmental effects induced by cautious blasting during the construction of the Istanbul Subway 4 Levent - Ayazaga Darulsafaka Metro Tunnel Project carried out by the

    Jan 1, 2011

  • ISEE
    Guidelines for Mining and Quarry Blasting Urban Areas Brazilian Regulation NBR 9653 Under Current Reviewed

    By Denise de La Corte Bacci

    The Brazilian Regulation NBR 9653 is a guide intended to evaluate mine and quarry blasting effects in urban areas. The first version, written in 1986 by the Committee of the Brazilian Associate of Tec

    Jan 1, 2005

  • ISEE
    Optimization and Precision in Mining, The Simfrag Model

    By Jorge Cárdenas, Alejandro Luna

    In mining simulation for fragmentation results prediction is of utmost importance to study feasibility, ensure safety, and estimate the correct use of resources in drilling an explosive to meet requir

    Jan 21, 2025

  • ISEE
    The Accuracy of blasting vibration prediction using signature hole and site constant analysis (a case study: Blasting near crusher structure, limestone mining in Indonesia)

    By Jihan Farhan Lubis, Putu Chandra Darmansyah

    Ground vibration caused by blasting has become a common concern, especially when blasting is conducted near buildings or structures. Uncontrolled vibrations can potentially damage nearby infrastructur

    Jan 26, 2026

  • ISEE
    The Environmental Disturbance from Special Effects Blasting in Open Water

    By C. Adcock, R. Farnfield, G. Adderley

    The use of explosives to create special effects in the film industry is a well-known past time. A recent production required simulation of a large scale water splash from the effect of a statue fallin

    Jan 1, 2010