Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Drilling and Blasting Trends into the 21st Century

    By John Dean Smith

    In order to discuss problem solving techniques for the future. we must first review the past. This paper will discuss the drilling and blasting problems and techniques that were used by .Imax Coal in

    Jan 1, 1991

  • ISEE
    A Mine-to-Crusher Framework for Aggregate Operations

    By Diogo Fonseca, José Manuel, Nuno Fernandes, Blessing Taiwo

    This research focuses on enhancing the synergy between blasting and primary crushing operations in quarries. A blast operation at dstgroup aggregate quarry in northern Portugal was simulated to fine-t

    Jan 21, 2025

  • ISEE
    Environmentally Motivated Tracking of Geologic Layer Movement During Bench Blasting Using Discrete Element Methods

    By Dale S. Preece

    The blast-induced movement and final location of geologic layers that may cause environmental problems can be predicted using discrete element methods. This prediction capability can be used by mine o

    Jan 1, 1994

  • ISEE
    Journal: 100 Years / Firing Blasts by Electricity

    By Robert Hopler

    The use of electrical fuzes is rapidly superseding the old cap and fuse method of firing blasts. It is therefore desirable that the details of this kind of blasting should be more generally understood

    Jan 1, 2006

  • ISEE
    The Influence of Geology on Blasthole Deviation (0b527217-6b23-477f-8c0b-03e530d5c921)

    Blasthole deviation is a frequent, well documented and undesirable occurrence in mining operations. It is caused by the drill string mechanics, operating variables and the interaction between the dril

    Jan 1, 1996

  • ISEE
    Dynamite Daze (274eef47-64b4-4b3c-b71a-71551df93b44)

    We had a cold, gray winter here in Kansas City and I spent a lot of time watching out my den window at the squirrels and birds trying to get by in the lousy weather. I remember too well working in the

    Jan 1, 2004

  • ISEE
    The Development of Methods for Minimizing the Overbreak in Tunnel Blasting

    By Dong-Hyun Kim Kim, Tai-Ro Lee, Young-Hwa Seo

    Overbreak occurred inevitably in a tunnel excavation, is the main factor for increasing cost and period in tunnel projects. Furthermore the damage to the remaining rock mass related to the overbreak c

    Jan 1, 2003

  • ISEE
    Predicting and Controlling Ground Vibration

    By James W. Reil, Douglas A. Anderson

    Blast vibration monitoring has generally been regarded as a necessary evil. New instrumentation and computer programs can change this. Rather than the usual trial and error methods to control vibratio

    Jan 1, 1989

  • ISEE
    Fragmentation Interaction with Underground Mining Systems and Productivity

    By B Mohanty, Y C. Lizotte

    Optimization of blast fragmentation in underground hardrock mining requires analysis of its effects on loading and haulage equipment, together with the downstream materials handling system, with the o

    Jan 1, 1991

  • ISEE
    An Analysis of Dragline Applications and Performances in Deep Stripping Conditions

    By Richard Curtis

    Optimum Colliery is presently experiencing a shortfall of stripping capacity in order to meet its production requirements. Due to the long dragline procurement times, several alternative stripping met

    Jan 1, 1990

  • ISEE
    Analysis of Dynamic Stability of Rock Slope Under Loading of Blast Induced Seismic

    By Wenbo Lu

    A combined method is present in this paper in analysis the dynamic stability of rock slope under the loading of blast induced seismic, in which, by combining the dynamic load calculating method of qua

    Jan 1, 1999

  • ISEE
    Vibration Controlled Blast Timing Optimization Using the Seed Waveform Modeling Concept

    By Frank Sames

    Ground vibration levels are generally predicted using equations such as the USBM equation implementing the scaled distance concept and describing geological and blast design parameters in a ground tra

    Jan 1, 1995

  • ISEE
    Emissions from Explosives

    By V. Wetzig

    In the past, various investigations have been carried out at the Hagerbach Experimental Gallery under accurately reproducible conditions, in order to determine the emissions emanating from blasting op

    Jan 1, 2001

  • ISEE
    High Performance Ground Penetration Radar Project at Los Alamos National Laboratory

    By R F. Hoeberling

    "The use of ground penetrating radar (GPR) for geological purposes has been underway for almost two decades. The commercial need for a versatile GPR that can rapidly identify buried objects andundergr

    Jan 1, 1994

  • ISEE
    New Technology in Vibration Measurements, Analysis & Data Management

    By D T. Froedge

    The latest development in vibration measurement equipment involves small microcomputer operated micro-sized seismographs. As the result of this there has been an explosion of the data generated by the

    Jan 1, 1994

  • ISEE
    Description of Damage Constitutive Model as Documented in Pronto3D Manual 3/89

    By Billy J. Thorne

    The damage model in PRONTO simulates the dynamic fracture behavior of brittle rock. It is based on work started by Kipp and Grady, [lg] continued by Taylor, Chcn and Kuszmaul [I91 [20] and recently.mo

    Jan 1, 1989

  • ISEE
    Underground Bulk Loading Methods

    By Thomas C. Palangio

    Since the advent of explosives, people have been trying to mechanize the process of loading it into long, narrow holes. Automated loading frees manpower from the arduous task of charging granular, car

    Jan 1, 1990

  • ISEE
    The Experimental Study on Gas Detonating System by New-Type of Gas Source

    By Chen Jianping, Wu Li, Wei Banyun, Chen Canchang

    Liquified petroleum gas mixed with oxygen has been used as a new type of mixed gas source for gas detonating system. The experimental studies have been done on the detonation feature of gas detonating

    Jan 1, 1999

  • ISEE
    The Influence of Damping on Computer Simulations of Rock Motion: Computer Modeling of Gas Flow and Gas Loading of Rock in a Bench Blasting Environment

    By Steven D. Knudsen, Dale S. Preece

    Computer modeling of the blasting process can aid in gaining an understanding of the physics controlling the process. The sequence of events in a blast occur so rapidly and in such a violent environme

    Jan 1, 1992

  • ISEE
    Standard of Care for Blasting Negligence

    By Timothy Stark

    Blasters are usually strictly liable for injury or damage caused by flyrock (trespassory invasion) and blast-induced vibrations (non-trespassory invasion). The application of strict liability to non-t

    Jan 1, 2003