Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future GenerationsBy John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse
This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1
-
A System with Local Strain for Studying Shear Modulus Degradation of Cement Treated Clay with FibersBy Min Sunn Ye, Wei Wang, Huawen Xiao, Kai Yao, Fook Hou Lee, Siang Huat Goh
"Previous research have shown that introducing fibers to cement soil mixture is effective in improving the ductility as well as maintaining the strength of cement-treated soil. A good knowledge of sti
Jan 1, 1900
-
The World's Longest Directional Impact Driven PileBy Robert F. Stevens, Robin Givet, Kenneth Viking
"Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660
Jan 1, 2014
-
Determination of Coefficient of Modulus of Sub-Grade Reaction for Free Head Short PileBy Sumit Kumar Biswas, Moyukh De, Sibapriya Mukherjee
"The piles often are also subjected to lateral (horizontal) forces and moments. In fact, there are some structures where the primary function of piles is to transfer lateral loads to the ground. Prope
Jan 1, 2015
-
Northeast Boundary Tunnel – Mount Olivet Road Drop ShaftBy Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
Mobilised Shear Strength on the Failure Surface of 2D Belled Anchor Model Piles under Uplift in Cohesionless SoilBy Tanaya Deb, Sujit Kumar Pal
"Experimental investigations are carried out on failure pattern around 2D models of belled anchor piles in dry sand bed of density 15.60 kN/m3 under uplift. The models are having thickness ratio (Ts/T
Jan 1, 2015
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Deep Soil Mixing Trials at Porto Alegre Airport, BrazilBy A. Ortigão, M. Felix, E. Falk, T. Koehler
"Ground improvement techniques such as vibro-replacement or deep soil mixing are fairly young products in the Brazilian geotechnical market. Soft soils in this country are deep, very soft, have low se
Jan 1, 2015
-
Ideas To Improve Driven Pile Foundation Design And Installation ProceduresBy Armin W. Stuedlein, Steven R. Saye
The differences between calculated axial pile capacity and the capacity realized during and following installation has long presented a significant concern for foundation engineers and contractors. Su
-
Friction Fatigue and Drivability Analysis of Open Ended Pipe Piles Based on Cone Penetration Testing ResultsBy Frank Rausche, Scott D. Webster, Rozbeh B. Moghaddam
"Pile foundation driveability is a function of several variables such as subsurface characteristics, hammer type, hammer efficiency, pile type, and plugging conditions. One important phenomenon occurr
Jan 1, 2017
-
Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct ComparisonBy Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL
Sep 8, 2021
-
Nearshore Pile Construction Experience In Burnie, TasmaniaBy Thomas W. Scott, Manh N. Tran
Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur
Nov 1, 2022
-
Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current PracticeBy Jim Slatter, Ben Collingwood
"It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali
Jan 1, 1900
-
Use of Isolated Tie-Back Plates to Stabilize a Landslide in Steep TerrainBy Scott D. Neely, Donald R. Clark
"An existing landslide located at the southeast corner of the Telluride Regional Airport has been in an active state of failure for several years. The presence of the landslide has represented an on-g
Jan 1, 2015
-
Alternative Design and Construction Method for Clinton CSO Underground Storage FacilityBy Meeok Kim, Paul Beljan, Gordon Chen
"Clinton combined sewer overflow storage (CSO) facility project developed by the Department of Water Environment Protection of Onondaga County, New York, is to improve sewer facilities and infrastruct
Jan 1, 2015
-
Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, VictoriaBy Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan
The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an
Nov 1, 2022
-
In-Situ Study On Improvement Of Soft Ground Using Stone Columns For Railway EmbankmentBy Kishore Kumar B., Eswaran Prasad C R, Srini Naik B., Ramakrishna Raju N
The authors through this paper intend to introduce the non-vibro technique of ground improvement by stone column, being used for the first time in India under the Western Dedicated freight Corridor in
Nov 1, 2022
-
What It Takes (Geostructurally) To Extend The Plane Train Tunnel Under The World'S Busiest AirportBy Ryan T. Smith, Anthony Sahj, Alexander T. Darnell
Every second can count when trying to board a departing flight or catch a ride-share to your final destination. Hartsfield-Jackson Atlanta International Airport is in the midst of a project that aims
Oct 1, 2022
-
Broadway Viaduct Design Phase Load Test Program For Post Grouted ShaftsBy Mike Muchard
A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc
Jan 1, 2009
-
Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case HistoryBy Raffaella Granata, Daniele Vanni
"This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o
Jan 1, 2016