    Rock Socketed Drilled Shafts in Electrical Substations

    By Brock Wallis, Steve Davidow

    The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses

    Jan 1, 2018

  • DFI
    Automated Installation Monitoring For Augercast And Driven Piles

    By Garland Likins

    Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat

    Jan 1, 1999

  • DFI
    Residual Loads Measurements in Driven Steel H-Piles

    By Reda M. Bakeer

    "Measurements obtained during load testing of two steel H-piles driven at a site in Northeastern Mississippi are discussed. The general site conditions, equipment used, testing procedures and results

    Jan 1, 2017

  • DFI
    Results Of Dynamic And Static Load Tests On Helical Piles In The Varved Clay Of Massachusetts

    By Jorge Beim

    Helical Piles are increasingly being used to support and rehabilitate structures subjected to compressive axial loads. Traditionally, empirical correlations between installation torque and load capaci

    Jan 1, 2012

  • DFI
    Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary

    By Chris Harnan

    This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques

    Jan 1, 2000

  • DFI
    A New Method of Quality Control for Construction Joints in Diaphragm Walls

    By Nikolaus Schneider

    "Abstract: The combination of failure in joints of diaphragm walls and their exposure to water pressure may have far reaching effects ranging from water leakage to the risk of catastrophic loss of sta

    Jan 1, 2014

  • DFI
    New York City - A Review Of Various Foundation Problems And Solutions - Synopsis

    By Mel Febesh

    Working in New York City has become the graveyard of many Foundation Contractors. Varying subsurface conditions require Foundation Contractors to be aware of the conditions at each particular site and

    Jan 1, 2000

  • DFI
    Lateral Load Response Of Two Identical Bridge Column-Foundation Systems In Warm And Cold Conditions

    By Muhannad T. Suleiman

    Temperatures below freezing significantly enhance the soil shear strength and stiffness and to a lesser extent increase the compressive strength of concrete as well as the yield and ultimate strength

    Jan 1, 2006

  • DFI
    Advances in Desaturation of Sandy Soil to Mitigate the Liquefaction Hazard

    By Dhanaji S. Chavan, Thallak G. Sitharam

    "It is well known that sites comprising of saturated loose sand undergoes large deformations, due to liquefaction, during seismic shaking. To cope with this, different mitigation techniques such as vi

    Jan 1, 2017

  • DFI
    Comparison of Pile Foundations and Ground Improvement for Reduction of Seismic Displacements for a Wastewater Treatment Plant

    By Andrew Port, Ali Ghandeharioon

    Nonlinear seismic deformation analyses using the finite difference program FLAC were performed for a wastewater treatment plant to estimate foundation displacement and performance of two proposed tric

    Jan 1, 2018

  • DFI
    Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - Introduction

    By Michael W. Neill, O&apos

    The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec

    Jan 1, 1989

  • DFI
    Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NY

    By Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht

    The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou

    Jan 1, 2018

  • DFI
    First Quality Tissue Plant, Lock Haven, Pennsylvania: A Case Study Of Drilled Displacement Dewaal Piles ? Introduction

    By Gordon King

    The site of the First Quality Tissue plant is located on a previous paper production facility in Lock Haven, Pennsylvania. The new development, which included the construction of a tissue machine buil

    Jan 1, 2004

  • DFI
    Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing Method

    By Masaki Kitazume

    "Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua

    Jan 1, 2014

  • DFI
    An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction

    By F. Pagliacci

    Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste

    Jan 1, 2000

  • DFI
    Drilling And Dewatering In An Urban Environmentprivate - Project Description And Location

    By Joel Moskowitz

    In 1990, the United States General Services Administration (GSA) issued a contract for design and construction of a new federal court building in New York City. Mueser Rutledge Consulting Engineers (M

    Jan 1, 1996

  • DFI
    Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? Synopsis

    By A. K. C. Chan

    Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460

    Jan 1, 2010

  • DFI
    A Quality Control System For Augered Cast-In-Place Pile Installation

    By George G. Goble

    The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very

    Jan 1, 1997

  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • DFI
    Performance Of Three Unique Shoring Sections For Block 75 Shoring

    By Chris Sammon

    The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet

    Jan 1, 2010