Mining industry-Aboriginal Engagement Pursuant to new Ontario Mining Act rules: A Preliminary Examination of Potential ImpactsBy K. Webb, M. Hohn
"This paper reviews the evolving Ontario mining regime for mining industry-Aboriginal engagement and its apparent alignment with court decisions, domestic law, emerging international norms, mining ind
Jan 1, 2016
-
A Comparison of the Energy Requirements of an HPGR / Stirred Mill Circuit and Conventional Grinding Circuits for the Comminution of Mesaba OreBy Steve Wilson, Bern Klein, Jeff Drozdiak, Stefan Nadolski, Andrew Bamber
"In the adaptation of high pressure grinding rolls (HPGRs) to hard-rock mining applications, circuit development has mainly focused on placing HPGRs in the role of tertiary crusher in the preparation
Jan 1, 2010
-
Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman MineVale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51
May 1, 2009
-
Effects of Fabrication Process Parameters on the Microstructure of Ferritic/Martensitic Oxide Idspersion Strengthened (ODS) Steel Components for Future Nuclear Reactor System ApplicationsBy S. Noh, T. K. Kim, B. O. Lee
Future nuclear reactor systems such as a sodium-cooled fast reactor are being designed under severe conditions in terms of operating temperature and irradiation fluence compared to current commercial
Jan 1, 2015
-
The Greenhills surface coal mining projectBy Clifford Britch
"Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine
Jan 1, 1981
-
Horses for Courses – Tailoring Front End Design to Project RequirementsBy Paul Staples, Paul Messenger, Greg Lane
"Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic
Jan 1, 2008
-
Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)By N. Coli
The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant
May 1, 2009
-
Developing Operation, Maintenance and Surveillance Manuals for Tailings and Water Management FacilitiesBy Ian Bruce
Tailings and water management facilities are essential and integral components of mine and mill operations. They must be managed for the long term in order to ensure that safe and environmentally resp
May 1, 2002
-
Formulation and Plant Trial of a Mixed Collector Suite For Eland PlatinumBy Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula
"The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.
Jan 1, 2011
-
Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding CircuitBy M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud
"In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp
Jan 1, 2017
-
The Alsands ProjectBy C. R. Edwards, J. R. Smith
"INTRODUCTIONThe purpose of this paper is to give an overview of the ALSANDS PROJECT, with emphasis on the approach taken in the design of the Primary Extraction and Froth Treatment Plants.The Alsands
Jan 1, 1982
-
Production of Paste from Total Tails in a Deep Cone Thickener A Case StudyBy Gregg Hodges, Fred Schoenbrunn, Steve Slottee, Chad McCleary
"In December, 1999 Stillwater Mining Company (SMC) commissioned a new paste /cement backfill plant to supplement the existing sand backfill system for the cut and fill mining operation at it’s Nye, Mo
Jan 1, 2001
-
Goldstream Concentrator Design and OperationBy Stuart McTavish
"Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th
Jan 1, 1985
-
Improving Construction Environmental Metrics Through Integration of Discrete Event Simulation and Life Cycle AnalysisBy H. Golzarpoor
Life Cycle Analysis (LCA) is a methodology for evaluating the environmental impacts associated with a product during its life cycle. LCA is identified as the most reliable method for verifying environ
Aug 1, 2013
-
Towards Optimum Value in Underground Mine SchedulingBy Bryan M. Maybee
The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground
May 1, 2009
-
New Design Software for Rockfall Simple Drapery SystemsBy A. Grimod
Rockfall drapery systems are commonly used as a simple, fast and cheap measure against the rock falling trajectories affecting very steep slopes. The system basically consists of a steel mesh, which i
Aug 1, 2013
-
Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, ManitobaBy P. Walford, C. Mealin, D. Good
"The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C
Jan 1, 2009
-
Review of Self-Heating Testing MethodologiesBy J. E. Nesset, F. Rosenblum, J. A. Finch
"The self-heating of sulphides can be a major hazard in mining operations and concentrate handling, particularly during transportation and associated storage. Self-heating results from the oxidation o
Jan 1, 2014
-
Hydrochloric acid leaching of an Elliot Lake uranium oreBy G. M. Ritcey, K. E. Haque, S. H. Lucas
"Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an
Jan 1, 1980
-
The Oxygen Demand of Flotation PulpsBy F. Rosenblum, P. Spira
"Techniques were developed to determine the oxygen demand of sulphide ore pulps in the laboratory and in concentrators. The effect of variables which influence oxygen demand was studied, and it is sho
Jan 1, 1974