Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Process Diagnosis using Quantitative Mineralogy

    By Lori Kormos, Jhonny Carrión De la Cruz, Dominic Fragomeni, Elizabeth Whiteman, Jorge Oliveira

    "Process diagnosis, flowsheet design and optimisation are most effectively and efficiently achieved through the use of metallurgical testwork combined with more modern quantitative mineralogical techn

    Jan 1, 2010

  • CIM
    Rougher Flotation Improvements at P.T. Freeport Indonesia’s Grasberg Operation

    By Harry Siewert

    "The commissioning of the 4th concentrator (C4) at Freeport Indonesia in early 1998 increased total mill throughput from 130k to 230k tonnes per day. The C4 flowsheet consists of a single 38 ft diamet

    Jan 1, 2001

  • CIM
    Reducing Water Management Risks Through Processing Changes

    By C. Kennedy, S. Jensen

    Traditionally, mineral processing plants are designed to achieve the highest recovery of valuable material with limited regard for the cost of managing waste products-both solid and water components.

    Jan 1, 2014

  • CIM
    Significant Strides Toward Ree Production in Canada

    By I. M. London, G. P. Hatch

    The Canadian Rare Earth Elements Network (CREEN) was formally launched at the Rare Earth Symposium at The Metallurgy and Materials Society of CIM (MetSoc) Conference of Metallurgists in October 2013.

    Jan 1, 2014

  • CIM
    Study of Gold Leaching with Bromine and Bromide and the Influence of Sulphide Minerals on this Reaction

    By Mani Manimaran, Inna Dymov, Mariam Melashvili, Chris Fleming, Joe O’Day

    This paper presents experimental evidence that supports the use of bromine/bromide as a potential alternative to conventional cyanidation for gold leaching. The study evaluated a brominebased lixivian

    Jan 1, 2014

  • CIM
    A Novel Recycling Technique for Neodymium Magnet Scraps Using B2O3 Flux

    By Takahiro Kubo, Katsunori Yamaguchi, Hidehiro Sekimoto

    Equilibrium relation between B2O3 slag, RExOy-B2O3 (RE = rare earths) slag and Fe-C alloy formed by melting treatment of neodymium magnet and B2O3 was investigated. When neodymium magnet was melted to

    Jan 1, 2014

  • CIM
    Recycling of Rare Earth Magnet using Molten Fluoride

    By H. Zhu, Y. Sato, O. Takeda, K. Nakano

    Recycling of rare earth magnet wastes is essential to insure the stable supply of rare earth resources. For the development of a novel recycling process, the removal of rare earth oxide from an off-sp

    Jan 1, 2014

  • CIM
    Radioactive Elements Associated With Rare Earths - Identity and Management

    By L. M. Lowe, D. G. Feasby, J. R. Goode

    "Rare earth resources usually contain minor amounts of radioactive elements. The most widely recognised sources of radioactivity are associated with thorium and uranium. However, also present in the r

    Jan 1, 2014

  • CIM
    Beneficiation and Extraction of REE from Northern Minerals’ Browns Range Heavy Rare Earth Project

    By T. Hadley, E. Catovic

    "Northern Minerals Limited’s (ASX: NTU) flagship project is the Browns Range Rare Earth Project (the Project) located in Western Australia, consisting of a number of deposits with high value, heavy ra

    Jan 1, 2014

  • CIM
    SmartEXEC Implementation Goldcorp Eleonore Project

    By Michel Massé

    Eleonore Project- Agenda ? Purpose and Technical Overview ? SmartEXEC Control Capabilities ? SmartEXEC System Archetecture ? SmartEXEC System Advantage Eleonore Project- Purpose and Technical O

    Aug 1, 2013

  • CIM
    Flotation of REE Bearing Minerals from Silicate and Carbonate Host Deposits

    By T. Deng

    Flotation of rare earths is complicated by the number of mineral classes that carry rare earth elements, including carbonates, phosphates, and silicates that often co-occur within the same deposit. Ga

    Jan 1, 2014

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    Condition Monitoring and Basic Maintenance?. One Without the Other?

    ? Founded In 1953 ? Mining growth of 83% since 2007 ? We produced over 1 million ounces of Au in 2012 ? We Forecast of 20% Au production in 2013-2015 ? We have paid a dividend 31 years consecuti

    Aug 1, 2013

  • CIM
    Integrated Experimental and Modelling Research on Copper-Making Slags

    By Sergei Decterov, Peter Hayes, Evgueni Jak, Taufiq Hidayat, Denis Shishin

    Copper smelter operations around the world are under sustained pressure to reduce costs and increase output. Through the provision of reliable data on fundamental properties of the chemical systems th

    Jan 1, 2014

  • CIM
    Formation of Schwertmannite-Like and Scorodite-Like Coatings on Pyrite and its Implications in Acid Mine Drainage Control

    By N. Hiroyoshi, R. D. Corpuz, M. Ito, Hokkaido University, C. B. Tabelin, S. Veerawattananun

    "Acid mine drainage (AMD), the very acidic and heavy metal-contaminated leachate generated when pyrite-bearing rocks are exposed to surface oxidizing conditions, is a serious environmental problem enc

    Jan 1, 2016

  • CIM
    Mettop´s New Ionic Liquid Cooling Technology is the Safest Way to Cool a Furnace

    By Stefan Wallner, Andreas Filzwieser, Stefan Konetschnik, Reinhard Preiss, Iris Filzwieser

    "Process Safety Management for METTOP means avoiding risks as far as possible - but also dealing with the residual risk by using all existing management tools or external assistance, if required. The

    Jan 1, 2014

  • CIM
    Hydrogeological Aspects of Three Open Pits within Noranda Operations

    By L. C. St. Arnaud

    "Open pit mines can produce large disturbances within regional hydrogeologic systems. The degree of disturbance and the consequences on the local environment depend on the size of the pit and on the p

    Jan 1, 1990

  • CIM
    Study on Recovery Process for Ruthenium from Scraps by Hydrometallurgical Methods

    By Y. Nakamura, T. H. Okabe, S. A. Sunkar, K. Nose

    Ruthenium (Ru) is known as a platinum group element with a very small production volume. In fact, the worldwide annual production of primary Ru metal is only about 20-30 tons, and it depends on the am

    Jan 1, 2014

  • CIM
    Developments In Copper Smelting: A Discussion of Changes in Copper Technology and Science as Seen through the Lens of Professor Davenport’s TEXTS

    By Phillip J. Mackey, Gerardo R. F. Alvear F.

    It is now 38 years since the publication of the first edition of "Extractive Metallurgy of Copper" by Professor W.G. Davenport and the late Professor A.K. Biswas. The text book would be issued in a to

    Jan 1, 2014

  • CIM
    Are Ferronickel Furnaces at Thermodynamic Equilibrium?

    By M. Y. Solar, W. G. Davenport

    Most of the recent growth in nickel demand has been for the production of stainless steels and virtually all of it has been satisfied by new ferronickel and nickel pig iron projects. But "good" lateri

    Jan 1, 2014