Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Improving Ground Support Design by Historical Ground Fall Analysis at HBMS

    By X. (Mike) Yao

    Rock mechanics engineers must provide ground support designs that ensure a safe underground working environment. Unexpected falls of ground are unacceptable while ground support systems must be adequa

    May 1, 2002

  • CIM
    Process Integration and Optimisation of the Boddington HPGR Circuit (5a005d54-696d-4671-abf8-b2ab149915bf)

    By S. Tavani, T. Rees

    The current mining operations at Newmont Boddington Gold Mine (NBG) commenced in 2008, and commissioning of the processing plant started in the latter half of 2009. Metso Process Technology and Innova

    Jan 1, 2012

  • CIM
    Design and Construction of a Unique Shaft Bottom Structural System for a Potash Mine

    By E. Nolasco, J. Ouellet, T. Tikka

    "Shaft bottom structural systems are used in underground mining to support transfer of personnel, equipment and ore to and from underground to the surface. This paper first summarizes the evolution of

    Jan 1, 2019

  • CIM
    Installation of Shaft Bottom Steel Prior to Shaft Sinking

    By D. M. Ziebarth

    "Normal sequence of operations to develop a new underground mine is: construct and outfit headframe for shaft sinking, sink shaft, construct and outfit shaft sump, develop shaft station and shaft bott

    Jan 1, 2019

  • CIM
    Modern Welded Pipe Processes

    By A Palynchuk

    The development of welded pipe has paralleled the general industrial development and, in particular, that of the petroleum industry. The petroleum industry's need for high-grade, economical pipel

    Jan 1, 1964

  • CIM
    Autogenous Mill Feed Preparation to Reduce Unit Energy Consumption

    By James E. Wennen

    The through-put and energy efficiency of an autogenous (AG) grinding mill are adversely affected by variability in rock size and rock competency. This applies to both fully autogenous and semi-autogen

    Jan 1, 2012

  • CIM
    High-Temperature Deformation Of Fe3Al

    By A. N. Shen

    Fe3A1 intermetallics are potential inexpensive candidate for hot applications. In this project, torsion tests on hot-rolled and annealed Fe3A1 (Fe-15.5A1-5.8Cr-1.0Nb¬0.05C) were carried out over the r

    Jan 1, 2007

  • CIM
    Effect of Core Diameter on the Bond Impact Crushing Work Index Test

    By A. G. Doll

    The Bond low energy impact (crushing) work index test is specified to be performed on rock specimens between 50 mm and 75 mm in effective diameter. NQ-diameter drill core, frequently used in mineral e

    Jan 1, 2012

  • CIM
    Balancing Environmental Protection and Industry Sustainability: A Successful Case Study of the Lignite Mining Industry in India

    By B. Surender Mohan

    Mining lignite pollutes the environment and causes ecological damage if unattended. Being conscious of the importance of environmental resources for the well-being of the living system, the Neyveli Li

    Aug 1, 2013

  • CIM
    Lucky Friday’s No. 4 Shaft - Ten Years from Concept to Completion

    By David Berberick

    "Hecla Limited’s No. 4 Shaft at the Lucky Friday Mine is the largest capital expenditure in the corporation’s 128-year history and is considered the deepest shaft in the United States. This paper will

    Jan 1, 2019

  • CIM
    Small Mining can be Clean and Profitable

    By Gustavo Angeloci

    Artisanal mining is a rudimentary activity that today attracts over 30 million people in virtually all developing countries around the world. As the price of gold has steadily increased over the past

    Aug 1, 2013

  • CIM
    Industrial Engineering at the Jeffrey Mine

    By J M. Fletcher

    The responsibility and scope of the Industrial Engineering Department, as organized at the Jeffrey mine, has been broadened to include any study, project or report that could result in more effective

    Jan 1, 1963

  • CIM
    Two-stage Counter-current Leaching Of Uranium Ore From Global Atomic’s Dasa Project

    By J. A. Brown, F. P. Kerr, M. A. Archer

    Extensive testwork on Global Atomic’s Dasa Project in Niger has been conducted at SGS Minerals laboratory in Lakefield, Ontario. Much of this testwork has focused on a two-stage counter-current leach

    Jan 1, 2020

  • CIM
    The Business Value of Life Cycle Assessment in the Mining, Minerals and Metals Industry

    By J. Hendry, K. Brady, J. Yorzyk

    Drawing from the experience of nickel, copper, aluminum and mineral borates, this paper illustrates the business value that the mining, minerals and metals industry as a whole can gain from applying l

    Jan 1, 2010

  • CIM
    A Review of the Proposed Changes in the Alberta Mines Act

    By George Kellock

    Introductory The Alberta Provincial Government has contemplated a revision of the Mines Act for some time past, and it is understood that a definite decision has now been made to do this at the nex

    Jan 1, 1929

  • CIM
    Geostatistical grade control and opencast mine planning in a multi-layer coal deposit

    By A. H. Onur, S. Ural

    "The Afsin-Elbistan coal deposit with its 3.4 billion metric tons of reserve is the biggest coal basin and one of the most important resources for electrical energy production in Turkey. The coal depo

    Jan 1, 2003

  • CIM
    An intuitive approach to improving organizational effectiveness

    By Wayne N. McKee, Scott A. Lewis

    "Introduction to the Syncrude OperationSyncrude Canada Ltd., located 42 km north of the city of Fort McMurray, Alberta, (Fig. I) is an integrated operation that has produced synthetic crude oil from t

    Jan 1, 1993

  • CIM
    Use of X-Ray Computed Tomography to Quantify the Diffrences in Cracks and Pores of Sphalerite Ore Particles When Comminuted Using an HPGR and Cone Crusher for Heap Leach Feed Preparation (fc3480c4-6fd4-4fbd-a6a3-d3a6bd59fe1f)

    By J. T. Kalala

    Particles for heap leaching in conventional circuits are prepared using Cone crushers. Cone crushers are used to crush the ore to the size range between 12-25 mm for heap leaching operations. Leaching

    Jan 1, 2012

  • CIM
    The importance and recent advances in geological coal quality studies in Alberta

    By C. W. Langenberg, D. E. Macdonald, R. S. Strobl

    "The successful marketing of Alberta coals will increasingly depend, to a large degree, on an extensive coal quality information base. This information, at present, is generally based on a deliverable

    Jan 1, 1993

  • CIM
    Recent Improvements in Milling Practice at Wright-Hargreaves

    By Malcolm Black

    Introduction The circumstances under which the gold mining industry was forced to curtail operations a few years ago are well known to all. The effect of those circumstances is particularly noticea

    Jan 1, 1948